You are on page 1of 3

GE LightSpeed CT

Systems Maintenance (Phase III)

Introduction • Perform scheduled maintenance ο Patient registration/scheduling


G.E. LightSpeed Computed
on GE LightSpeed CT systems ο Exam/technique settings
Tomography Systems Maintenance is
• Change the X-ray tube, realign and • System architectures
a skills development course designed
recalibrate the X-ray generator ο System block diagrams
as a continuation of the Principles of • Calibrate, replace and align the ο System revision changes
Servicing Computed Tomography collimator • Power distribution
Systems (CT Phase I) and Multi-Vendor • Calibrate, service, align, and use ο Power distribution diagrams
Computed Tomography Systems diagnostic tools to evaluate Main AC power
Maintenance (CT Phase II) courses. performance of the DAS and Sub-system AC power
Through attending this course, the detector assembly DC power supplies
service professional will become self- • Calibrate, replace and align the
confident in working on the gantries, hardware associated with the Day 2
patient transports, detector gantry and patient transport Lab Activities
assemblies, 4/8/16/32 slice DAS • Diagnose and correct problems in • Scheduling an exam
systems, image processing systems, the scanning sequence ο Patient registration
X-ray control systems, rotor controls, • Troubleshoot gantry, patient ο Selecting technique parameters
and operator control systems of the transport and X-ray system Scout view
LightSpeed CT family. Hands-on lab problems Axial views
time is emphasized, and makes up • Diagnose and correct problems in Helical views
approximately 80% of the overall the digital acquisition system and • Power distribution cont'd
course content. detector array ο Verify AC power supplies
• Diagnose and correct problems in Main power distribution
the image generation system
Prerequisites Gantry AC power
• Troubleshoot the operator Table AC power
To attend this course, the service
workstation problems Console Power
professional must have an extensive
knowledge of CT physics, physical ο Verify DC power supplies
Control system DC power
principles and service procedures Course Outline
gained through attendance at the RSTI supplies
Lab functions will be repeated
Principles of Servicing Computed Gantry DC power supplies
on each system available.
Tomography Systems (Phase I) and Stationary
RSTI Multi-Vendor Computed Rotating
Day 1 Table DC power supplies
Tomography Systems Maintenance
• System operation and power X-ray system DC power
(CT Phase II) courses or equivalent
distribution supplies
training and experience.
ο Systems operational parameters X-ray generator
ο Major system component X-ray tube rotor control
Objectives identification Collimator
Following attendance of this course, ο System controls Detector/DAS area DC power
participants will be able to: Safety supplies
Interlocks

30745 Solon Road ∙ Solon, OH 44139 ∙ P440.349.4700 ∙ F440.349.2053 ∙ Toll-Free 1.833.229.7784 Hands-On Training Course
Course Length: 2 Weeks
www.rsti-training.com ∙ registration@rsti-training.com
CEU’s Awarded: 8 CEU’s
State of Ohio Registration No. 93-09-1377T
GE LightSpeed CT
Systems Maintenance (Phase III)

Day 3 ο High voltage control Day 6


• Motor verification and ο Filament controls • Detector and DAS
replacement Filament drive ο Detector architectures
ο Gantry rotation ο Rotor controller Maintenance issues
Axial speed control ο Collimator controls Detector replacement
Axial motor driver ο Filter control ο DAS architectures
Harmonization/encoding • X-ray tube change Pre-amp/channel boards
ο Patient transport/table ο Tube selection DAS control
movement and indexing ο De-install/install issues Data convolution
Tabletop horizontal control ο Required calibrations and ο Data transmission
Speed control alignment Fiber optics
Motor drivers Lab Activities ο Slip ring data transfers
Harmonization/Encoding • X-ray tube change Brushes
Table vertical travel RF transmitters
ο De-install procedures
Speed control
ο Installation procedures
Motor drive Day 7
• High voltage control waveforms
Position indication Lab Activities
ο Intermediate voltage verification
ο Laser position indicators • Pre-amp/channel board
ο kV demanded
Operation verification
ο kV actual
Alignment ο Detector output mapping
ο VCO frequency
ο IGBT/SCR gate drive ο Pre-amp measurements
Lab Activities • Detector/DAS replacement
• kV calibration
• Gantry rotation ο Removal procedures
• Filament drive waveforms
ο Axial driver verification ο Installation and alignment
ο Filament drive demanded
Axial motor driver waveforms
ο Filament drive actual ο Calibration
Rotational speed tests
ο mA demanded • Data transfer verification
ο Drive assembly mechanical
ο mA actual ο DAS data output
adjustments
• mA calibration ο Data transfer verification
ο Encoder verification
ο Data to image processing
• Patient transport
Day 5 verification
ο Vertical motor driver waveforms
ο Vertical position indication Lab Activities
• Rotor control waveforms
Day 8
ο Horizontal motor driver • Image processing and handling
waveforms • Collimator control waveforms
• Collimator alignment
ο Front end processing
ο Encoder verification
• Filter position control verification
ο Temporary preprocessed data
• Laser adjustments storage
• Beam on window adjustment
ο Image reconstruction
Day 4 • Plane of rotation adjustment
ο Processed image handling
• X-ray generation • ISO center adjustment
Image generation for display

30745 Solon Road ∙ Solon, OH 44139 ∙ P440.349.4700 ∙ F440.349.2053 ∙ Toll-Free 1.833.229.7784 Hands-On Training Course
Course Length: 2 Weeks
www.rsti-training.com ∙ registration@rsti-training.com
CEU’s Awarded: 8 CEU’s
State of Ohio Registration No. 93-09-1377T
GE LightSpeed CT
Systems Maintenance (Phase III)

Image storage • System control communications


System disk verification
MOD • System state back-up and restore
CD/DVD ROM • QC phantom image evaluation
Print services ο Resolution
DICOM ο Contrast
ο CT number tracking
Lab Activities ο Image noise
• Image reconstruction system • System troubleshooting
testing ο Electronic
ο Image processor ο Software assisted
ο Image generator
• Image reconstruction testing Day 10
ο Real time reconstruction • Course review
ο Retro-reconstruction • Final exam
• Manage image files • Course evaluation
ο Image disks
Replacement
Managing storage space
ο MOD
ο DICOM setup
ο Printer setup

Day 9
• System control and image quality
ο System host computer
Field replaceable units
System hard drives
ο System to gantry control
Stationary controls
Rotating controls
ο System to x-ray system control
X-ray generation
Collimation/filter
ο System to image
processing/handling
ο Image quality control tests

Lab Activities

30745 Solon Road ∙ Solon, OH 44139 ∙ P440.349.4700 ∙ F440.349.2053 ∙ Toll-Free 1.833.229.7784 Hands-On Training Course
Course Length: 2 Weeks
www.rsti-training.com ∙ registration@rsti-training.com
CEU’s Awarded: 8 CEU’s
State of Ohio Registration No. 93-09-1377T

You might also like