Abstract—Information technology has played a more and more teamwork and workflow automation. The Web can also
important role in Chinese construction industry, especially after overcome the incompatibilities of data formats through smart
the emergence of Project Information Portal ˄ PIP ˅ , which browsers and servers. Therefore, independent project
provides a web-based project document management, participants using different hardware platforms can share the
communication and collaboration working environment for the same system over the Web. PIP is also a platform that can be
participants. Taking PIP developed for the Construction Projects
accessible by project teams located in different organizations. It
of Beijing 2008 Olympic Games as a case, this paper introduces
its background, objectives, functions and developing process, in basically provides a centralized, commonly accessible, reliable
an attempt to provide reference for the use of PIP in large means of transmitting and storing project information. Project
projects. (Abstract) information is stored on the server and a standard Web browser
is used as a gateway to exchange this information, eliminating
Keywords- PIP, Project management, Project communication geographic and boundary hardware platform differences.
(key words) In order to meet the requirements of the development, the
Chinese construction industry is strengthening its
I. INTRODUCTION informatization and vigorously promoting the application of
The construction engineering for Beijing 2008 Olympic information technology. During the past few years, the
Games is a mega-project consisting of many sub-projects. 37 government and A/E/C firms are increasing their interests in IT
gymnasiums for competition will be built and 59 for training applications to facilitate construction projects. The
will be rebuilt. In addition, the city's infrastructure construction development of PIP for construction engineering of Beijing
projects such as the transportation and electro-communication 2008 Olympic Games is an example.
facilities prepared for the Olympics are included. Problems will II. OBJECTIVES OF THE PIP DEVELOPED FOR BEIJING
be caused if traditional management modes are used in OLYMPICS CONSTRUCTION PROJECTS
Olympic construction engineering:
ƒ Great risk and difficulties in objective control exist The PIP developed for Beijing Olympics construction
because of high capital cost and long duration, engineering is a communication platform between the
ƒ Difficulties lie in government’s macro control and management departments and the participants of the Olympic
supervisory work, engineering. It is also an integrated platform of some of the
ƒ Project document problems with communication and engineering management application software.
information processing and shared by the parties. The PIP development should conform to international
Information Technology (IT) is now routinely used in the norms and demonstrate Chinese characteristics, in another
construction industry as a tool to reduce the previous problems. word, it should provide both the visualization integrated
The use of IT improves coordination and collaboration between environment adapt to the international management institution
firms participating in a construction project, leading to better and the engineering management modes suitable for Chinese’s
communication practices. Its benefits include an increase in the situation. It should provide secure, convenient, swift and
quality of documents and the speed of the work, better financial efficient, intellectualized information services to the
control and communications, and simpler and faster access to construction participants of the Olympics. It should provide
common data as well as a decrease in documentation errors. dynamic and real time working environment for management.
Project Information Portal (PIP) is the web-based The PIP aims in improving the management technology
information technology that best facilitates a collaborative and efficiency. It enables to collect, grasp and deal with
working environment in a construction project. Its use as a information about the schedule, quality, cost and emergency
communication medium can help information transfer occur quickly and smoothly, while provide support for decision. By
faster and more effectively and enable new opportunities for using PIP, the sub-projects of the Olympics construction are
the development of distributed systems that can cross coordinated and controlled systematically, all the related
organization boundaries and provide a unique opportunity for governmental department such as planning, engineering,

1-4244-1312-5/07/$25.00 © 2007 IEEE 5308


Authorized licensed use limited to: Univaersidad Militar Nueva Granada. Downloaded on March 18,2010 at 12:31:57 EDT from IEEE Xplore. Restrictions apply.
environment, municipal, communication, weather, information, C. Functions of the Olympic Games projects PIP
etc. are connected jointly and they can cooperate in managing The functions of the Olympic Games projects PIP can be
and controlling the whole project, ensuring the harmonization, divided into five function blocks, followed by fig. 2.
integration, efficiency of the Olympics construction. All these
provide references for the decision maker. Control versions of doc.
The application of the PIP can largely reduce the
construction cost. More important, it is an important part of the
Scientific Games, the Digital Games and will make great Document query
contribution for the building of Digital Beijing, also it plays Document
great role in improving and accelerating the informatization of Document editing on line
management
Chinese construction industry.
……
III. FUNCTIONS OF PIP OF THE OLYMPIC GAMES PROJECTS
Public information
A. The Users Information
publication
The first of development of the PIP is investigation of Function Electric bidding
function requirement and system analysis. During the first step, of PIP of
the
the developer should take in-depth research into the real Beijing ……
construction situation and study different users’ ideas and 2008
requirements. After considering all the factors, a list of the Olympic Information
s communication Email
users that will use the PIP is presented in Fig.1.
Discussing/videoing on-
PIP USERS li
Help on line and training
Collaborative
work 9LGHRPHHWLQJ

……
Dept. of Olympic Owners, Investors Media,
Organization Designers, , Commun
Work flow Apply and confirm on line
Comm., Contractors, Consulta ity
Government depts., Suppliers nt, people management
In. organizations etc. Research etc. Work flow support
etc. er. etc.

……
Fig 1. The users of the PIP analysis
B. Information covered by the PIP Fig.2 Function of the PIP of Beijing 2008 Olympic Games
Different kinds of information involved in the Olympics
construction engineering include organizational information, Fig 3 and Fig. 4 are some images from the PIP has been
management information, technical information and economic developed.
information. In detail, there are planning and designing
management information, cost, schedule and quality
controlling information, safety management information,
environmental protection information, conference information,
contract management information, risk management, bond and
claim for compensation management. The information should
be covered generally by the PIP, and may be in different forms
of data, files, images and videos.
B iji
In another point of view, the core information that
constitutes the PIP follows as:
• Planning information:
• Investing information
• Design information

• Construction information
• Procurement information
• enterprise information
• human resources information
Fig 3. the PIP applied in Beijing 2008 Olympic Games

1-4244-1312-5/07/$25.00 © 2007 IEEE 5309


Authorized licensed use limited to: Univaersidad Militar Nueva Granada. Downloaded on March 18,2010 at 12:31:57 EDT from IEEE Xplore. Restrictions apply.
the field of project management but lack in IT technology
knowledge, the project management training of the IT
technical team, who are familiar with IT development but
need some knowledge about project management.
C. Software support
The software support includes:
• The solution scheme of the platform structure and the
way of the information transmission. The solution
scheme that the platform structure adopts is multilevel
distributed structure. The first level is the platform of the
Olympics Organization Committee, and the second level
is the individual project team. The multilevel structure is
characterized in capable of distinguishing different
management levels’ management responsibility and
scope easily, simplifying the difficulty of the structure
system, assigning work with clear interface and
operating smoothly.
• The integrated data resource scheme.
Fig 4. the PIP applied in Beijing 2008 Olympic Games —the integration of the database of qualification of the
enterprises and the individuals of the construction
IV. DEVELOPMENT OF THE PIP OF OLYMPIC GAMES ministry,
—the integration of the database of program files of the
The development of the PIP of Beijing 2008 Olympic construction ministry,
Games needs proper organization, training, software and —the integration of definition of the dynamic
hardware support, which are the four pillars that uphold the information of the process controlling and the cost
PIP platform. controlling,
A. Organization support —the integration of the existing information resource
according to the data standard and specification
The organization support includes the organizational
published by the supervising information system of
structure and corresponding background, the task dividing
the national construction industry.
principles, management rules, information coding and
• The integrated software scheme
information system. The development of the PIP needs the
—the software such as P3 can be integrated in the
following organizational support:
schedule management field.
• The inner organization framework and management
—the software such as CGB(developed by Chinese
flow are clear and decided,
enterprises )can be integrated in the cost management
• The mode of project management is confirmed and the
program files of project management are established, field.
—the software such as Expendition can be integrated in
• The engineering department of the Olympic
Organization Committee has designated some people to the contract management field.
take part in the whole PIP development process, —the data format of the committee working platform is
• The data of the system requirement analysis is acquired, required to be compatible and to connect with the
• The system design scheme has been censored and management system of the Beijing Olympics
sanctioned, Organizing Committee after communication with the
• The equipment of the computers, network and related technology department.
hardware are provided, —the PIP is sure to integrate with the application
• The system and software that have been prescribed by system that specified by the committee and be
the engineering department of the Olympic Organization compatible with them in data format.
Committee in related contracts, —the PIP can be connected with the contractors’ and
• The coordination of the development team and the sponsors’ system.
participants of the whole projects are expedite, • The data security solution that combines the software
• The data collecting has proper guarantee measures and hardware. The solution considers three sides
including the system guarantee, the agreement guarantee including the ways to ensure the security in the
and the censorship mechanism guarantee. information lay, the physics lay and the specified web
environment.
B. Training support • The solution of the system development technology
Training support includes the training of leaders team, route. The solution adopts the Microsoft’s platform and
who decide the direction of the whole organization, the IT the SUN platform. The structure of the server is
training of the project management team, who are familiar in Windows + SQL Server˄or Oracle˅,the application

1-4244-1312-5/07/$25.00 © 2007 IEEE 5310


Authorized licensed use limited to: Univaersidad Militar Nueva Granada. Downloaded on March 18,2010 at 12:31:57 EDT from IEEE Xplore. Restrictions apply.
system is java which includes J2EEǃJDBCǃEJBǃ management level and improves the efficiency. On the one
XML, the development tool is IBM WEBSPHEREǃ side, the leader can know about how the projects located in
JBUILDERǃJSP, etc. different areas are implementing, makes decision on time and
then delivers it right then, on the other hand, the underlings
D. Hardware support can get the directive from the upper leader in time and then
Hardware support includes the confirmation of the execute it with no delay.
hardware system scheme and the establishment of the Beijing 2008 Olympic Games is a mega-project. The
hardware system. The demand draft for hardware facilities application of PIP has greatly improved the working
includes: efficiency. The objectives, functions, structure and developing
• The facility requirement for engineering department’s process of the development of the PIP of Beijing 2008
official environment Olympic Games are presented in this paper and will provide
—the chief server and related facilities comprise of 3~4 useful reference for use of PIP in large projects. Basing on the
enterprise server providing the serve of document, existing use status of PIP, this paper presumes the
application, database, backup system and big screen development trends of PIP in future.
display facility, disk, firewall, etc.
— the local area network facility for the first level
comprise of two department server,20~30 PC of high
performance, and some portable computers. REFERENCES
• The second level management level(department). two
workgroup server, 3~5 PCs of high performance [1] Shizhao Ding,Yoshito Itoh, “Toward the development of a integrated
• Solution of vast area network: FDDI, DDN special line, management procedure – lifecycle management system for construction
project”, World Project Management Week, Hongkong,2002
dial-up, etc.
[2] Stephen R. Hagan, PBS Project Information Portal Part One; Part Two
㧘e-newsletter of the Construction Industry Coalition Council㧘April
2004 㧘 www.constructionchannel.net/ newsletters/april_2004/
V. CONCLUSIONS newsletter0404.html
[3] C. Brohn, A. Gayoso, S. Male, D. Mitrovic, T. Hassan, F.Garas, I.
The PIP is already running in the Beijing Olympics Hunter, Large scale engineering in construction, user requirements for
IT—initial results, Proceedings of the 4th International Conference on
construction now, it has been approved that the PIP has Concurrent Enterprising ICE’97,Nottingham, UK, 1997, pp. 407– 419.
provided the working environment for communication and
collaboration among all the participants, including different
companies, different departments in the same company, and
subsidiary company, which ameliorates the project