ASPHALT SURFACED ROAD AND PARKING LOTS CONDITION SURVEY DATA SHEET
FOR SAMPLE UNIT
Branch Jalan Tol JANGER Section Outer Shoulder Sample unit 1
Surveyed by Date Sample area (m2) 78000
1. Alligator Cracking 6. Depression 11. Patching & Utill Cut Patching
2. Bleeding 7. Edge Cracking 12. Polished Aggregate
3. Block Cracking 8. Jt Reflection Cracking 13. Potholes
4. Bumps and Sags 9. Lane/Shoulder Drop Off 14. Railroad Crossing
5. Corrugation 10. Long & Trans Cracking 15. Rutting
Distress
Amount Total Quantity
Severity
1M 3 3 90
2H 2 2 600
5L 6 54
8
5M 2 18
9M 1 1 100
10 L 17 850
10 M 7 28 350
10 H 4 200
11 L 4 600
42
11 H 38 5700
13 L 3 3
13 M 4 11 4
13 H 4 4
19 L 5 1500
19 M 6 21 1800
19 H 10 3000
SKETCH
ASPHALT SURFACED ROAD AND PARKING LOTS CONDITION SURVEY DATA SHEET
FOR SAMPLE UNIT
Branch Jalan Tol JANGER Section Lane 1 Sample unit 1
Surveyed by Date Sample area (m ) 2
93600
1. Alligator Cracking 6. Depression 11. Patching & Utill Cut Patching
2. Bleeding 7. Edge Cracking 12. Polished Aggregate
3. Block Cracking 8. Jt Reflection Cracking 13. Potholes
4. Bumps and Sags 9. Lane/Shoulder Drop Off 14. Railroad Crossing
5. Corrugation 10. Long & Trans Cracking 15. Rutting
Distress
Amount Total Quantity
Severity
2M 1 360
5L 28 302.4
48 5 M 16 48 172.8
5H 4 43.2
8H 2 200
10 L 487 24350
676 10 M 155 676 7750
10 H 34 1700
11 L 163 29340
316 11 M 78 316 14040
11 H 75 13500
5 13 M 3 3
5
13 H 2 2
15 L 8 1440
18 15 M 7 18 1260
15 H 3 540
19 L 11 3960
26 19 M 8 26 2880
19 H 7 2520
SKETCH
ASPHALT SURFACED ROAD AND PARKING LOTS CONDITION SURVEY DATA SHEET
FOR SAMPLE UNIT
Branch Jalan Tol JANGER Section Lane 2 Sample unit 1
Surveyed by Date Sample area (m )2
93600
1. Alligator Cracking 6. Depression 11. Patching & Utill Cut Patching
2. Bleeding 7. Edge Cracking 12. Polished Aggregate
3. Block Cracking 8. Jt Reflection Cracking 13. Potholes
4. Bumps and Sags 9. Lane/Shoulder Drop Off 14. Railroad Crossing
5. Corrugation 10. Long & Trans Cracking 15. Rutting
Distress
Amount Total Quantity
Severity
2L 1 360
3
2H 2 720
5M 2 2 21.6
8M 2 200
3
8H 1 100
11 L 55 9900
11 M 28 125 5040
11 H 42 7560
13 L 8 8
13 M 6 22 6
13 H 8 8
19 L 44 15840
19 M 21 86 7560
19 H 21 7560
SKETCH
ASPHALT SURFACED ROAD AND PARKING LOTS CONDITION SURVEY DATA SHEET
FOR SAMPLE UNIT
Branch Jalan Tol JANGER Section Lane 3 Sample unit 1
Surveyed by Date Sample area (m )2
93600
1. Alligator Cracking 6. Depression 11. Patching & Utill Cut Patching
2. Bleeding 7. Edge Cracking 12. Polished Aggregate
3. Block Cracking 8. Jt Reflection Cracking 13. Potholes
4. Bumps and Sags 9. Lane/Shoulder Drop Off 14. Railroad Crossing
5. Corrugation 10. Long & Trans Cracking 15. Rutting
Distress
Amount Total Quantity
Severity
10 L 4 200
10 M 3 9 150
10 H 2 100
11 L 21 3780
11 M 13 53 2340
11 H 19 3420
13 M 15 15
22
13 H 7 7
19 L 33 11880
19 M 21 86 7560
19 H 32 11520
SKETCH
ASPHALT SURFACED ROAD AND PARKING LOTS CONDITION SURVEY DATA SHEET
FOR SAMPLE UNIT
Branch Jalan Tol JANGER Section Lane 4 Sample unit 1
Surveyed by Date Sample area (m2) 93600
1. Alligator Cracking 6. Depression 11. Patching & Utill Cut Patching
2. Bleeding 7. Edge Cracking 12. Polished Aggregate
3. Block Cracking 8. Jt Reflection Cracking 13. Potholes
4. Bumps and Sags 9. Lane/Shoulder Drop Off 14. Railroad Crossing
5. Corrugation 10. Long & Trans Cracking 15. Rutting
Distress
Amount Total Quantity
Severity
5H 1 1 10.8
8M 3 3 300
10 L 155 7750
10 M 58 331 2900
10 H 118 5900
11 M 8 1440
13
11 H 5 900
13 M 7 7
16
13 H 9 9
19 L 44 15840
19 M 21 90 7560
19 H 25 9000
SKETCH
LANE 1
LANE 2
LANE 3
LANE 4
CDV
85
82
75
75
68
85
15
Serious
q CDV
6 76
5 75
4 79
3 70
2 64
1 58
Max 79
PCI 21
Kondisi Serious
q CDV
6 67
5 67
4 69
3 65
2 60
1 56
Max 69
PCI 31
Kondisi Very Poor
q CDV
6 67
5 65
4 62
3 60
2 66
1 59
Max 67
PCI 33
Kondisi Very Poor