1. slag removal
improper
1. Blow hole
2.Degating
2.shrinkage/cold
improper
shut
1 XXX xxx Adaptor 3.Die
3.As cast
maintenance
damage
improper
4.Chip off
4.part handling
not ok
Activity and Effectiveness
Action
Area Actions
REJ%
5. Radius increased at pipe to avoid air leak.
6.New die manufactured.
15
1. after every shot die coating and water sprayed on die cavity followed, to 13.78
reduce and soldering
2. closing velocity of movable die monitored and followed as per pre-define.
3. slag removal frequency defined as after every 15 min instead of 1Hr 10
4. .die lubtricant use as per require level, avoid excess use of it.
Method 5. Degassing process improve
6. Degating method improved by training and awareness regarding air leak 5
issue.
0
No any change in material APR.18 MAY
Material
Rejection Trend
30
XXX_REJ % TREND_APR.18 ~JUN.19
28.47
25
20
REJ%
15
13.78
12.45
10
9.33
8.31 7.9
6.73 6.24
6.08
5 5.39
3.76 3.67 3
2.55 2.96
0
APR.18 MAY.18 JUN.18 JULY.18 AUG.18 SEPT.18 OCT.18 NOV.18 DEC.18 JAN.19 FEB.19 MAR.19 APR.19 MAY.19 JUN.19
MONTHS
Photos / Evidences
REJ%
LIMI
T
7.9
6.24
NEW DIE MANUFACTURED
3.61
2.96
CTURED