ENDORSEMENT SHEET FOR QP ~


ST ANDARDI REFERENCE QUALITY PLAN (RQP I
TO BE FILLED IN BY SUPPLIER AT TIME OF SUBMISSION To be filled in by NTPC
PROJECT NAME Talcher Super Thermal Power Station Vendor Quality Plan No.
CONTRACT NO
CONTRACT NAME
MAIN SUPPLIER
MANUFACTURER WORKS & ADDRESS
ITEM !EQUIPMENT I SYSTEMI 11/0.433KV, 500KV A ,
SUB-SYSTEM DETAILS i.e. MODEL TYPE I 11/0.433KV, 630 KV A , and
SIZE IRA T1NG etc.
3.3/0.433KV, 630 KV A TRANSFORMER FORs
SEEPAGE WATER RECmCULATION
/ SYSTEM
APPROVED QP NO.: RQP/SQP 0000-999-qoe-s-036, Rev 0 Dated: 20.02.2013
Confirmation by Main Supplier (TICK WHICHEVER APPLICABLE)
L That the item! component is identical to that considered for QP approval OR. Tick as Applicable
IL That there are minor changes in the item! component with respect to that consideredfor QP The QP is endorsed for this project without any change
approval, however the same do change not affect the contents of QP. OR /
IlL That tit ere are minor changes in the item! component with respect to that considered for QP ;rfie QP is endorsed for this project with changes as
approval, however the same affect the QP sliKlttly, as indicated below / in attached sheet. indicated

Sr. No. 4 (a) of this Quality plan for "Type & Special Test" shall be followed as per PO specification.

SIGN.: (Main Supplier) DATE SIGN.: (Manufacturer) DATE: NTPC (Reviewed IA.JlP-I'6ved byl Date & Seal)
-' ,,, -'
-~~
~

,
l .r. VAf,.{ \. _~9-<
\..(,Mw~, I
bV'O
To be followed as per PO