Activity Description Procedure/ Specification Doc. Number Testing Frequency Responsibility Remarks
1 Incoming material Visual inspection As per spec. MTD-QF-15-04 100% QCI
inspection
5 Leak test Hydro/ pneumatic ASME Sec-VIII DIV 1 MTD-QF-15-06 100% QCI
6 Painting & blasting With DFT meter Drawing / specification MTD-QF-15-05 SA-2.5 QCI
7 Final piping work Visual inspection Drawing / specification MTD-QF-15-02 100% Production