The work that has been done in Workshop

 Install rack 27 u in the room 2.


 Install UPS APC 5KVA/4.5 KW in the rack.
 Installing 3 main servers Dell PowerEdge 2 (R740 XD) 1 (R740) (IPS , MMABIS
Management ,MMABIS Matching ).
 Create raid 10 in MMABIS Management Server .
 Create raid 5 in MMABIS Matching Server .
 Create raid 5 in IPS Server .
 Setup Debian 9.7 with dicker in all 3 main servers.
 Setup all applications in each server .

 Installing 2 main servers Dell PowerEdge R740(FMS , Powersync).


 Setup Debian 9.7 with Dockers in all 2 main servers
 Create raid 5 in FMS Server.
 Create raid 5 in PowerSync Server.
 Setup all application in each server.

 Create new VM Server Windows server 2019 in ESXi .


 Install Rolls (DHCP, DNS) , NTP and CA in server 2019.

 Waiting for the certificate to be generated from the company to install in all main
servers.

 Activation for MMABIS.


The work that has been done in Workshop

 Install rack 27 u in the server room 2.


 Install UPS APC  5KVA/4.5 KW in the rack.
 Installing 3 main servers Dell PowerEdge  2 (R740 XD) 1 (R740) (IPS ,
MMABIS Management ,MMABIS Matching ).
 Create raid 10 in MMABIS Management Server 103SAS HDD and 1 hot spare.
 Create raid 5 in MMABIS Matching Server, 7SAS HDD and 1 hot spare.
 Create raid 5 in IPS Server, 3SAS HDD and 1 hot spare.
 Setup Debian 9.7 with dicker in all 3 main servers.
 Install and setup MMABIS Management Docker in the MMABIS Management
server.
 Install and setup IPS Docker in the IPS server.
 Install and setup MegaMatcher Docker in the Matching server.
 IP address of the servers was provided from the Test and Pilot IP Schema.

 Installing 2 main servers Dell PowerEdge R740 for (FMS, PowerSync).


 Create raid 5 in FMS Server, 3SAS HDD and 1 hot spare.
 Create raid 5 in PowerSync Server, 3SAS HDD and 1 hot spare.
 Setup Debian 9.7 with Dockers in all 2 main servers.
 Install and setup PowerSync Docker in the PS server.
 Install and setup FMS Docker in the FMS server.
 Check the Cisco Switch configuration.
 Test and check the SonicWall firewall configuration.
 IP address of the servers, Cisco switch, and Firewall (SonicWall) was provided
from the Test and Pilot IP Schema.

The work that has been done in Workshop


 Install rack 27 u in the room 2.
 Install UPS APC 5KVA/4.5 KW in the rack.
 Installing 3 main servers Dell PowerEdge 2 (R740 XD) 1 (R740) (IPS , MMABIS
Management ,MMABIS Matching ).
 Create raid 10 in MMABIS Management Server .
 Create raid 5 in MMABIS Matching Server .
 Create raid 5 in IPS Server .
 Setup Debian 9.7 with dicker in all 3 main servers.
 Setup all applications in each server .

 Installing 2 main servers Dell PowerEdge R740(FMS , Powersync).


 Setup Debian 9.7 with Dockers in all 2 main servers
 Create raid 5 in FMS Server.
 Create raid 5 in PowerSync Server.
 Setup all application in each server.

 Create new VM Server Windows server 2019 in ESXi .


 Install Rolls (DHCP, DNS) , NTP and CA in server 2019.

 Waiting for the certificate to be generated from the company to install in all main
servers.

 Activation for MMABIS.

The work that has been done in Workshop


 

 Install rack 27 u in the server room 2.


 Install UPS APC  5KVA/4.5 KW in the rack.
 Installing 3 main servers Dell PowerEdge  2 (R740 XD) 1 (R740) (IPS ,
MMABIS Management ,MMABIS Matching ).
 Create raid 10 in MMABIS Management Server 103SAS HDD and 1 hot spare.
 Create raid 5 in MMABIS Matching Server, 7SAS HDD and 1 hot spare.
 Create raid 5 in IPS Server, 3SAS HDD and 1 hot spare.
 Setup Debian 9.7 with dicker in all 3 main servers.
 Install and setup MMABIS Management Docker in the MMABIS Management
server.
 Install and setup IPS Docker in the IPS server.
 Install and setup MegaMatcher Docker in the Matching server.
 IP address of the servers was provided from the Test and Pilot IP Schema.

 Installing 2 main servers Dell PowerEdge R740 for (FMS, PowerSync).


 Create raid 5 in FMS Server, 3SAS HDD and 1 hot spare.
 Create raid 5 in PowerSync Server, 3SAS HDD and 1 hot spare.
 Setup Debian 9.7 with Dockers in all 2 main servers.
 Install and setup PowerSync Docker in the PS server.
 Install and setup FMS Docker in the FMS server.
 Check the Cisco Switch configuration.
 Test and check the SonicWall firewall configuration.
 IP address of the servers, Cisco switch, and Firewall (SonicWall) was provided
from the Test and Pilot IP Schema.