You are on page 1of 1
a = @ iH a 7 2 = z z DELVE 100 Dia E | 7 oosteR set ore ou am csrawonon rene 1) CUSTOUER To PROWDE PRO®ER SUPPORT FOR WANFOLDS AT STE To AVOID ANY STRESS ON 2) PRESSURE TANK (NOT SHOWN) TO BE MOUNTED SUITABLY AT SITE NEAR TO SYSTEM SUPPLIED. 9) AL ese EMEA s.OVETEO TO ATOLEDCE OF «/= 5 ww UMESE SOEOFED FroM 2 1/2" a ABOVE BUTIENRLY VAIME & SANG CHECK VALVE, 18) THE ORAWNG SHELL BE USED FOR REFERENCE ONLY #ND SHOULD NOT BE USED FOR CONSTRUCTION PURPOSE UNLESS CERTIED. REFER GA DRAWING OF CONTROL PANEL - GABS120008 FOR DIMENSION DETAILS PRODUCT SETS BOOSTER TST lem ony. oe Fan GENERAL ARRANGE aoe Tas nana Te RV oF [OHD._—_[2? hoon Fons suv overex senate seo fae fra oesen, | FORE PUMP sysTeM CHSHAL SSE Tera re waren sums now pro reno. WO PO SEE sinGie vip OPERATED ev. no.| __DESCRITION OF REVISION sow | oare -OE4- GABS120007 2 i a 2 : os © 7 a oo Ded

You might also like