You are on page 1of 1

296400 296800 297200

PETA RENCANA PENAMBANGAN TRIWULAN II


TAHUN 2020

PT. ENERGI BUMI TAPIN


9663550

9663550
Desa Baramban-Kecamatan Piani
Kabupaten Tapin-Kalimantan Selatan

SKALA 1 : 1.500
UTM 50 S
TOP SOIL AREA
Area ± 0,4 HA
Top Elevation 44 mdpl 0 50 150 250 m

LEGENDA

DISPOSAL AREA
9663150

9663150
TOP SOIL AREA

STOCKROOM AREA

PIT AREA 5,1 HA

KOLAM PENGENDAPAN

JALAN TAMBANG

DISPOSAL AREA POS SECURITY


Area ± 2 HA
Top Elevation 67 mdpl KANTOR & WORKSHOP
Capacity 563.000 Bcm
IUP PT. EBT DENGAN LUAS 196,10 HA

SEAMB, B1
9662750

9662750
INDEKS PETA

Lokasi
Penambangan
DEPARTEMENT ENGINEERING

STOCKROOM Date :
Area ± 0,5 HA
Level 34-40 m Drawn by : BM
(Kapasitas 150.000 MT) Approved by : PT. EBT
Project File : EBT-2020
296400 296800 297200 Paper Size : A0

You might also like