You are on page 1of 14

Chapter 6: Deliverable (User Interface Design)

6.1 Introduction:
Life Share testing ensures that all the functionality of the project is working properly. All the modules
including user or complainer registration, login form and buttons are working properly.

6.2 Project Overview


The purpose of the Online crime reporting website is to simplify and automate the process of
searching the criminals in the case of emergency and maintain the record of crimes in daily
routine.
Promote and support the establishment of effective website and the elimination of a dependency
on police station.
 Encouraging existing users or compliners.
 Encouraging new users to registred in website and add new complains.
 Promoting low risk behavior so that individuals protect their on users as well as being
safe the complains.

6.3 Scope of testing:


Scope of testing of Life Share include testing of the following functionalities:
 Registration
 Login
 Complinant
 Muharrir
 SHO
 DPO

6.4 Test Plan Strategy:


The test plan ensure that all the functionality is working properly by doing unit testing, integration testing,
and system testing.

6.5 Unit Testing:


All modules functionality is tested separately. It include separate testing of registration, login, complinant
Muharrir,SHO and DPO about us as well as it is tested for all crimes . All the group members participated
in this testing.

6.6 Integration testing:


After the integration testing is done all the modules are combined so that the integration testing of the
software can be done. All the modules including signup, login, users registration form, complainer
database, about us. All the group members participated in integration testing.

6.7 System Testing:


After unit testing the Life Share software is tested as whole software. All the group members participated
in this system testing.
6.8 Function To Be Tested:
 Registered
 Login
 Complinant
 Muharrir
 SHO
 DPO

6.9 Test Case of Use Cases 1 Design and Description:

Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana


Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase1
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is registered.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press Submit button. Database will login the user and all
task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
Successfully passed the registration in first attempt. All team members are satisfied with the
results

Passed Failed Not Executed


Registered test case:
Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase2
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press Go button. Database will login the user and all


task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
Logged in user successfully in website. All team members are satisfied with the results

Passed Failed Not Executed

Login test case:


Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase3
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press Go button. Database will login the user and all


task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
Complainant logged in successfully in complainant dashboard. All team members are
satisfied with the results

Passed Failed Not Executed


Complainant(dashboard) test case:

Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana


Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase4
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press add complaint from navbar . Database will login the user and all
task which were provided to user
will again require login connection
to database after pressing logout.
Comments
After 3-5 attempts we visited add complaints from navbar. All team members are satisfied
with the results

Passed Failed Not Executed


Add and view complaints:

Muharrir(receive complaints) test case:


Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase5
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press GO button and receive complaint from Database will login the user and all
navbar. task which were provided to user
will again require login connection
to database after pressing logout.
Comment
After3_4attempts we visited receive complaint from navbar. All team members are satisfied
with the results

Passed Failed Not Executed

Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana


Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase6
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press add officer from navbar button. Database will login the user and all
task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
No conflict was found during scaling. All team members are satisfied with the results

Passed Failed Not Executed

Add officer test case:


Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase7
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press view officer from navbar. Database will login the user and all
task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
No conflict was found during scaling. All team members are satisfied with the results

Passed Failed Not Executed

View officer test case:


Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase8
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press GO button. Database will login the user and all


task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
No conflict was found during scaling. All team members are satisfied with the results

Passed Failed Not Executed

SHO (dashboard) test case:


Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase9
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press receive cases from SHO navbar. Database will login the user and all
task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
After 1-2 attempts we visit receive cases on SHO navbar. All team members are satisfied with
the results

Passed Failed Not Executed

Receive case:
Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase10
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press Go button. Database will login the user and all


task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
No conflict was found during scaling. All team members are satisfied with the results

Passed Failed Not Executed

DPO(dash board) test case:


Test Case ID: T21 Web Development Team Noor-ul-Ain, Sana
Noureen, Aswa Ahmad
Test Case Version: T21 Reviewed By Team Lead
Test Date: 20-05-2015 Use Case Reference(s) UseCase11
Revision History NO

Objective Disconnecting of user from database.


Product/Ver./ Refer to show both user.
Module
Environment: Necessary and desired properties of the test environment. (hardware,
software)
Assumptions: User is logged in.
Pre-Requisite: Internet connection is required
Step # Execution description Procedure result

1. Press receive case from DPO navbar . Database will login the user and all
task which were provided to user
will again require login connection
to database after pressing logout.
Comments:
No conflict was found during scaling. All team members are satisfied with the results

Passed Failed Not Executed

Receive cases: