You are on page 1of 3
IRC NOTIFICATION 2 Phone: Secy. Gen. +91+11-26185303 Set: +91411-26185313, 26185319, 26185273 INDIAN ROADS CONGRESS **™ *91+11-26183669 Kama Koti Marg, Sector-6, RK. Puram New Delhi-110022 NOTIFICATION NO. 13 dated 30% August, 2005 Subject : Errata No. 1 to IRC:18-2000 “Design Criteria for Prestressed Concrete Road Bridges (Post-Tensioned Concrete”) (Third Revision) Third Revision of IRC:18-2000 “Design Criteria for Prestressed Concrete Road Bridges (Post-Tensioned Concrete)” was published in October, 2000 and Reprinted in September, 2002 with Amendment No.1 published in October, 2002 issue of “Indian Highways” and Amendment No.2 published in February, 2005 issue of ‘Indian Highways’. Errata No. 1 to IRC:18-2000 was issued vide notification No.4 dated 28% June, 2005 (published in the July 2005 issue of Indian Highways). Some typographical errors have been observed in the Errata published. Therefore, in supersession of the earlier Errata, corrected Errata No. 1 is notified herewith. Qnidrans (R.S. Sharma) Secretary General Encl: As above INDIAN HIGHWAYS, OCTOBER 2005 7 a ERRATA TO IRC PUBLICATION ERRATA NO. 1 TO IRC: 18-2000 DESIGN CRITERIA FOR PRESTRESSED CONCRETE ROAD BRIDGES (POST-TENSIONED CONCRETE) (THIRD REVISION) Clause No. For Read (Clause 14.1.2.2/ For bridge decks with precast| For bridge decks with precast (Page 23) Prestressed beams and cast-in-situ| prestressed beams and cast-in-situ deck slab, V., can be evaluated as} deck slab, V,, can be evaluated as given below : given below: M,, “ultimate design moment| M4, =ultimate design moment acting on the precast acting on the precast section alone section alone ¥, =vultimate design shear force| V,, =ultimate design shear force acting on the precast acting on the precast section alone section alone 4, —=Second moment of area of| =Second moment of area of precast section alone Precast section alone Z, _=Second moment of area of| J, _=Second moment of area of composite section composite section (Ay), = first moment of area above| (4y), =first moment of area above composite centroid for| composite centroid for Precast section alone Precast section alone (Ay), = first moment of area above (Ay), =first moment of area above composite centroid for composite centroid for Precast section alone composite section Som = St¥€SS at composite centroid =stress at composite centroid due to M,, due to M,. Compressive stress taken as positive Sq =stress at composite centoid|, =Compressive stress at due to prestress composite centroid due to prestress Sp OBL +Sy Bf thy if tress at composite centroid| =shear stress at composite due to V,, centroid due to V,, = Vy (Ayp V., Ay), HEL Eh = HL 2S, Ipb 1p then section revision is then section revision is required required 2B INDIAN HIGHWAYS, OCTOBER 2005 ERRATA TO IRC PUBLICATION Clause No. For Read V, = additional ultimate shear = additional ultimate shear force which can be carried force which can be carried by the composite section by the composite section before the principal tensile before the principal tensile stress” at composite stress at composite centroid centroid reaches reaches Gp=0.24 (feb! S, = 0.24 (f,)"? taken as rece i) ge ie e CP +hyh-f)]| Va [rao “4 Ave Ave Veo = VatVe Veo = Vat Vig (Clause 14.1.4 | Shear reinforcement 0.87F, A 0. 8%, Equation 1 — = 0.4 MPa 6 , 6 Ae: VV, Equation 2 any Ss, 0.87, d, INDIAN HIGHWAYS, OCTOBER 2005 79

You might also like