Subject : Errata No. 1 to IRC:18-2000 “Design Criteria for Prestressed Concrete
Road Bridges (Post-Tensioned Concrete”) (Third Revision)
Third Revision of IRC:18-2000 “Design Criteria for Prestressed Concrete Road
Bridges (Post-Tensioned Concrete)” was published in October, 2000 and Reprinted
in September, 2002 with Amendment No.1 published in October, 2002 issue of
“Indian Highways” and Amendment No.2 published in February, 2005 issue of ‘Indian
Highways’.
Errata No. 1 to IRC:18-2000 was issued vide notification No.4 dated 28% June,
2005 (published in the July 2005 issue of Indian Highways). Some typographical
errors have been observed in the Errata published. Therefore, in supersession of the
earlier Errata, corrected Errata No. 1 is notified herewith.
Qnidrans
(R.S. Sharma)
Secretary General
Encl: As above
INDIAN HIGHWAYS, OCTOBER 2005 7
aERRATA TO IRC PUBLICATION
ERRATA NO. 1 TO IRC: 18-2000 DESIGN CRITERIA FOR PRESTRESSED
CONCRETE ROAD BRIDGES (POST-TENSIONED CONCRETE)
(THIRD REVISION)
Clause No. For Read
(Clause 14.1.2.2/ For bridge decks with precast| For bridge decks with precast
(Page 23) Prestressed beams and cast-in-situ| prestressed beams and cast-in-situ
deck slab, V., can be evaluated as} deck slab, V,, can be evaluated as
given below : given below:
M,, “ultimate design moment| M4, =ultimate design moment
acting on the precast acting on the precast
section alone section alone
¥, =vultimate design shear force| V,, =ultimate design shear force
acting on the precast acting on the precast
section alone section alone
4, —=Second moment of area of| =Second moment of area of
precast section alone Precast section alone
Z, _=Second moment of area of| J, _=Second moment of area of
composite section composite section
(Ay), = first moment of area above| (4y), =first moment of area above
composite centroid for| composite centroid for
Precast section alone Precast section alone
(Ay), = first moment of area above (Ay), =first moment of area above
composite centroid for composite centroid for
Precast section alone composite section
Som = St¥€SS at composite centroid =stress at composite centroid
due to M,, due to M,. Compressive
stress taken as positive
Sq =stress at composite centoid|, =Compressive stress at
due to prestress composite centroid due to
prestress
Sp OBL +Sy Bf thy
if tress at composite centroid| =shear stress at composite
due to V,, centroid due to V,,
= Vy (Ayp V., Ay),
HEL Eh = HL 2S,
Ipb 1p
then section revision is then section revision is
required required
2B INDIAN HIGHWAYS, OCTOBER 2005ERRATA TO IRC PUBLICATION
Clause No. For Read
V, = additional ultimate shear = additional ultimate shear
force which can be carried force which can be carried
by the composite section by the composite section
before the principal tensile before the principal tensile
stress” at composite stress at composite centroid
centroid reaches reaches
Gp=0.24 (feb! S, = 0.24 (f,)"? taken as
rece
i) ge ie
e CP +hyh-f)]| Va [rao “4
Ave Ave
Veo = VatVe Veo = Vat Vig
(Clause 14.1.4 | Shear reinforcement
0.87F, A 0. 8%,
Equation 1 — = 0.4 MPa
6 , 6
Ae: VV,
Equation 2 any
Ss, 0.87, d,