NOTIFICATION
anda use PA eo
i ‘era (Secretary General): 491 (11) 26185303
sare ri Sea er BP ‘wfBata (Sectt): 2618 $315, 2618 S319, 2617 1548,
74 felt — $10 022 (nen) 2618 5273, 2671 6778
(FH Fax} 491 (1) 2583660
INDIAN ROADS CONGRESS
Kama Koei Mog, Sector 6, RK. Puram,
"New Delt 110.02 (lia)
Dated the 28" March, 2012
NOTIFICATION NO. 77
Subject: Withdrawal of IRC Put
tions.
}) Following publications of IRC have been amalgamated with IRC:15:2011 “Standard Specifications
and Code of Practice for Construction of Concrete Road” (Fourth Revision),
i) IRC: 61:1976 “Tentative Guidelines for the Construction of Cement Concrete Pavements in Hot
Weather"
fi) IRC:84:1983 “Code of Practice for Curing of Cement withdrawal of Conerete Pavements” &
iii) IRC:91:1985 “Tentative Guidelines for Construction of Cement Conerete Pavements i Cold
Weather”
1RC:61-1976, IRC:84-1983 and IRC:91-1985 stand withdrawn with immediate effect, These
Publications shall not be revised and printed henceforth,
MW) Recently, new Limit State Method Code IRC:112-2011 “Code of Practice for Concrete Bridges" was
Published by IRC. On publication of this Code, the following IRC Codes based on “Working Loads/
Allowable Stresses” method (WL/AS) stands withdrawn with immediate effect,
IRC:AS “Design Criteria for Prestressed Concete Road Bridge” (Post Tensioned Concrete)
(Third Revision)
IRC:21 “Standard Specification and Code of Pract.ce for Rosd Bridge-Section III Cement Concrete”
(Plain and Reinforced) (Third Revision)
IRC:18
IRC:21 stands withdrawn with immediate effect,
However, the designs based on Working Load (WLYAllowable Stress (AS) method described in
Annexure A-4 Structural Design by “WLIAS” of IRC:112-2011 can be followed as an alternative to
following verification of limit state or ultimate strength for reinforced concrete members, For prestressed
concrete members, in addition to WL/AS check, ultimate strength check is also required
Secretary General
a aD TAS PRETO