You are on page 1of 4

Appendix C

Drawings for Coal Bin, Coal Hopper, Holding Basins, and Pier
Structure, CAP Acero Steel Plant

Source: Courtesy of CAP Acero; reproduced with permission

Note: This appendix is part of Chile Earthquake of 2010: Assessment of Industrial Facilities around
Downloaded from ascelibrary.org by 200.27.173.122 on 04/30/20. Copyright ASCE. For personal use only; all rights reserved.

Concepción, by J.G. (Greg) Soules, P.E., S.E.; Robert E. Bachman, P.E., S.E.; and John F. Silva, S.E.
American Society of Civil Engineers: Reston, VA. http://dx.doi.org/10.1061/9780784413647

Chile Earthquake of 2010


Downloaded from ascelibrary.org by 200.27.173.122 on 04/30/20. Copyright ASCE. For personal use only; all rights reserved.

Figure C.1 - Coal Bin

Figure C.2 - Coal Hopper

Chile Earthquake of 2010


Downloaded from ascelibrary.org by 200.27.173.122 on 04/30/20. Copyright ASCE. For personal use only; all rights reserved.

Figure C.3 – Holding Basins

Figure C.4 – Holding Basin Repair

Chile Earthquake of 2010


Downloaded from ascelibrary.org by 200.27.173.122 on 04/30/20. Copyright ASCE. For personal use only; all rights reserved.

Figure C.5 – Pier Structure

Chile Earthquake of 2010

You might also like