Professional Documents
Culture Documents
GRAH Nestor
56 80 33 92/49 92 25 46
E-mail: cedricgrah33@gmail.com
OBJECT
COMPETENCES
Battery wiring
PROFESSIONAL EXPERIENCES
Jan 11 - Feb 8, 2015: 950-MPR installation with HOBNET on behalf of the YOOMEE CI project.
3G Moov project (transmission and BTS) equipment Ericsson Abidjan and inland.
NOVEMBER - FEBRUARY 2012: Technician at PRIME (ex: SWAP) technologies for the 3G project (MTN
and MOOV).
From 04/06 to 14/06/2011: Technician at CP-Technologies for the MTN CI swap inside the country (1st
round).
From 04/11/2009 to 21/02/2010: Team leader at SATEC for the Green network project with ZTE
Corporation (Abidjan and San Pedro).
From 10/09 to 21/10/2009: Technician at SERVETEK for the MTN WIMAX and CDMA project and
installation of cabinets in the BSC (HLR-ODF-UMG and others) Abidjan and Yamoussoukro.
From 08/09 to 21/12/2008: Technician at SERVETEK for the Green network project 1st phase (Abidjan-
Anyama-Bingerville-San-Pedro-Méagui-Daloa).
TRAINING
From 24 to 25/01/2011: Training on BS60 indor Siémens system with Nokia Siemens.
March 01 - 03, 2010: Training on the BTS 8112 and Macrowave system at ZTE Corporation.
From February 15 to 18, 2008: Training on the BTS 312,3012 system, energy bay (Emerson) and Macrowave
at Huawei Technologie.
DIPLOMAS OBTAINED
COMPUTER KNOWLEDGE
HOBBIES