You are on page 1of 3

PVSYST V5.

74 26/04/20 Page 1/3

Simulacion estacion de bombeo No 1


Simulacion estacion de bombeo No 1

Grid-Connected System: Simulation parameters

Project : Estacion bombeo No 1


Geographical Site Guepsa Country Colombia
Situation Latitude 6.0°N Longitude 73.6°W
Time defined as Legal Time Time zone UT-5 Altitude 1569 m
Albedo 0.20
Meteo data : Guepsa, Synthetic Hourly data

Simulation variant : New simulation variant


Simulation date 26/04/20 16h04

Simulation parameters
Collector Plane Orientation Tilt 30° Azimuth 0°
Horizon Free Horizon
Near Shadings No Shadings

PV Array Characteristics
PV module Si-mono Model JKM 345M-72
Manufacturer Jinkosolar
Number of PV modules In series 12 modules In parallel 15 strings
Total number of PV modules Nb. modules 180 Unit Nom. Power 345 Wp
Array global power Nominal (STC) 62.1 kWp At operating cond. 55.6 kWp (50°C)
Array operating characteristics (50°C) U mpp 418 V I mpp 133 A
Total area Module area 349 m² Cell area 308 m²

Inverter Model CPS SCA28KTL-DO/US-480


Manufacturer ChintPower
Characteristics Operating Voltage 200-850 V Unit Nom. Power 50 kW AC

PV Array loss factors


Thermal Loss factor Uc (const) 20.0 W/m²K Uv (wind) 0.0 W/m²K / m/s
=> Nominal Oper. Coll. Temp. (G=800 W/m², Tamb=20°C, Wind=1 m/s.) NOCT 56 °C
Wiring Ohmic Loss Global array res. 53 mOhm Loss Fraction 1.5 % at STC
Module Quality Loss Loss Fraction 0.1 %
Module Mismatch Losses Loss Fraction 2.0 % at MPP
Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo Parameter 0.05

User's needs : Unlimited load (grid)


PVSYST V5.74 26/04/20 Page 2/3

Simulacion estacion de bombeo No 1


Simulacion estacion de bombeo No 1

Grid-Connected System: Main results


Project : Estacion bombeo No 1
Simulation variant : New simulation variant

Main system parameters System type Grid-Connected


PV Field Orientation tilt 30° azimuth 0°
PV modules Model JKM 345M-72 Pnom 345 Wp
PV Array Nb. of modules 180 Pnom total 62.1 kWp
Inverter Model CPS SCA28KTL-DO/US-480Pnom 50.0 kW ac
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy 90566 kWh/year Specific prod. 1458 kWh/kWp/year
Performance Ratio PR 80.1 %

Normalized productions (per installed kWp): Nominal power 62.1 kWp Performance Ratio PR
7 1.0
PR : Performance Ratio (Yf / Yr) : 0.801
Lc : Collection Loss (PV-array losses) 0.77 kWh/kWp/day
Ls : System Loss (inverter, ...) 0.22 kWh/kWp/day
Yf : Produced useful energy (inverter output) 4 kWh/kWp/day
6
0.8

5
Normalized Energy [kWh/kWp/day]

Performance Ratio PR

0.6
4

3
0.4

0.2
1

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

New simulation variant


Balances and main results

GlobHor T Amb GlobInc GlobEff EArray E_Grid EffArrR EffSysR


kWh/m² °C kWh/m² kWh/m² kWh kWh % %
January 165.2 20.60 190.2 185.6 9729 9224 14.65 13.89
February 150.9 21.70 159.1 154.9 8303 7871 14.94 14.16
March 166.2 21.70 158.6 153.4 8305 7870 14.99 14.21
April 155.1 21.40 134.1 128.8 7074 6692 15.11 14.29
May 162.8 21.00 126.6 121.1 6749 6384 15.26 14.44
June 161.7 20.90 117.8 112.0 6251 5909 15.19 14.36
July 177.3 20.00 130.4 124.2 6950 6582 15.26 14.45
August 177.3 21.30 143.1 137.2 7560 7164 15.13 14.34
September 168.9 21.10 153.0 147.6 8067 7649 15.10 14.31
October 158.7 20.40 160.8 156.2 8499 8066 15.13 14.36
November 149.7 20.20 166.1 161.9 8642 8211 14.89 14.15
December 154.4 20.10 179.9 175.7 9429 8944 15.01 14.23

Year 1948.2 20.86 1819.8 1758.6 95560 90566 15.04 14.25

Legends: GlobHor Horizontal global irradiation EArray Effective energy at the output of the array
T Amb Ambient Temperature E_Grid Energy injected into grid
GlobInc Global incident in coll. plane EffArrR Effic. Eout array / rough area
GlobEff Effective Global, corr. for IAM and shadings EffSysR Effic. Eout system / rough area
PVSYST V5.74 26/04/20 Page 3/3

Simulacion estacion de bombeo No 1


Simulacion estacion de bombeo No 1

Grid-Connected System: Loss diagram


Project : Estacion bombeo No 1
Simulation variant : New simulation variant

Main system parameters System type Grid-Connected


PV Field Orientation tilt 30° azimuth 0°
PV modules Model JKM 345M-72 Pnom 345 Wp
PV Array Nb. of modules 180 Pnom total 62.1 kWp
Inverter Model CPS SCA28KTL-DO/US-480Pnom 50.0 kW ac
User's needs Unlimited load (grid)

Loss diagram over the whole year

1948 kWh/m² Horizontal global irradiation

-6.6% Global incident in coll. plane


-3.4% IAM factor on global

1759 kWh/m² * 349 m² coll. Effective irradiance on collectors


efficiency at STC = 17.79% PV conversion

109269 kWh Array nominal energy (at STC effic.)


-0.5% PV loss due to irradiance level

-9.0% PV loss due to temperature

-0.1% Module quality loss


-2.0% Module array mismatch loss
-0.9% Ohmic wiring loss
95991 kWh Array virtual energy at MPP

-5.2% Inverter Loss during operation (efficiency)


-0.0% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss over nominal inv. voltage
-0.5% Inverter Loss due to voltage threshold
90566 kWh Available Energy at Inverter Output

90566 kWh Energy injected into grid