TERMINAL

Upper structure – procurement

1. Pricurement of ballast…………………………7497,76 m3
2. Procurement of concrete sleepers wit fastening……4078 kom
3. Procurement of rails 49E1………………………………………241.86 t
4. Procurement of switches 49-180—7 on wooden………4 kom
5. Mathe sprave……………………………………………………………..862 kom
6. Kape protiv bočnog pomeranja…………………………………….366 kom

Radovi:

1. Ugradnja svega nabavljenog


2. Ugradnja koloseka ………………………………………………….2446,5 m1
3. Zavarivanje koloseka (ET računato)…………………………….38 kom
4. Finalno zavarivanje………………………………………………………14 kom
5. AT zavarivanje skretnica………………………………………………..56 kom

ŽELEZNIČKA VEZA

1. Pricurement of ballast…………………………1715,36 m3
2. Procurement of concrete sleepers wit fastening……893 kom
Eooden sleepers……………………………………………………..58 kom
3. Procurement of rails 49E1………………………………………56,38 t
4. Procurement of switches 49-180—7 on wooden………2 kom
5. Mathe sprave……………………………………………………………..498 kom
6. Kape protiv bočnog pomeranja…………………………………….913kom

Radovi:

1. Ugradnja svega nabavljenog


2. Ugradnja koloseka ………………………………………………….535,34 m1
Ugradnja na drvenim pragovima……………………………35 m1
3. Zavarivanje koloseka (ET računato)……………………………12 kom
4. Finalno zavarivanje………………………………………………………4 kom
5. AT zavarivanje skretnica………………………………………………..25 kom

Oprema:

1. Hectometre, kilometer, labels………………………………………..19 kom


2. Bumper (grudobran)……………………………………………………….2 kom
3. Fouling point (međik)……………………………………………………… 6 kom
4. Railwaz line slope (padokaz)………………………………………………1 kom

III RAILWAY SIGNALING