You are on page 1of 2

Ericsson Internal

1 (2)
Prepared (Subject resp) No.

Abhay Pathak
Approved (Document resp) Checked Date Rev Reference

2019-10-23

1 Introduction and Purpose of Automation...............................1


2 BOT request Details........................................................................1
3 Logic Details......................................................................................2
4 Formulae.............................................................................................2
5 Result...................................................................................................2

1 Introduction and Purpose of Automation


UMTS Pre-Post Report Preparation.

After any activity, we must compare the average value of pre KPIs with the average
value of Post KPIs from counter data extracted from 2 OSS. Currently it’s taking lot
of time to combine and formulating the data. We need a simple solution to make
the Pre-Post KPI summary in agreed format
Ericsson Internal
2 (2)
Prepared (Subject resp) No.

Abhay Pathak
Approved (Document resp) Checked Date Rev Reference

2019-10-23

2 BOT request Details


Name & SIGNUM of SPOC- Abhay Pathak
RPA Request ID -

3 Logic Details
 Combine Raw input files

 Select raw data for the desired cells list

 KPI Calculation with the help of formula.

 Date wise KPI Value in agreed format.

4 Formula
Multiple formulas involved to calculate the KPI value. Details will be shared later.

5 Result
Final Output File attached.

Huawei UMTS KPI


Pre Post_Template.xlsx

You might also like