Table of Content
Equipment Dimension……………………………………………….......................16
LT Openings………………………………………………………………………...17
DB Box………………………………………………………………………………19
Trap Door…………………………………………………………………………...20
Lightings…………………………………………………………………………….24
Isolator………………………………………………………………………………25
Transformer Plinth…………………………………………………………………32
7.0 Fencing………………………………………………………………………………………41
Butterfly Lock………………………………………………………………………….44
10.0 Others
10.1 Signage……………………………………………………………………………46
10.2 MCT………………………………………………………………………………47
Switchgear Room
100mm
SP POWERGRID LTD
50mm
SP POWERGRID LTD
Reference: Appendix 12
55mm
150mm
40mm 55mm
18mm
65mm
15mm
20mm
SP POWERGRID LTD
30mm
1m
SP POWERGRID LTD
All doors to be fitted with good quality door hook and must be able to open fully.
SP POWERGRID LTD
SP POWERGRID LTD
Screed the floor 5mm below the floor frame, after the floor frame had been fixed
SP POWERGRID LTD
IDS
RTU
Marshalling
Pilot Box
Battery
Box
Charger
Tools & Key Cabinet
SP POWERGRID LTD
Equipment Dimension
DIMENSION
Item
(L X B X H)mm
LT Openings
To provide (2x25mm2)+16mm2 cu cable with 1m of flexi hose and hot gland from DB box to
right side of the LT opening.
Distribution Box
Trap Door
860mm x 860mm
760mm x 760mm
opening
250mm
SP POWERGRID LTD
375mm
1500mm
SP POWERGRID LTD
200mm
SP POWERGRID LTD
300mm
200mm
SP POWERGRID LTD
Lightings
Wall Lighting
2.4m
Ceiling Lighting – 3m
SP POWERGRID LTD
Isolator
Isolator
1.5m
SP POWERGRID LTD
Cable Basement
30mm
SP POWERGRID LTD
To paint front and back of all beam with 50mm Red Luminous Paint
SP POWERGRID LTD
SP POWERGRID LTD
200mm
Less or equal to 30 degrees
150mm
SP POWERGRID LTD
200mm
SP POWERGRID LTD
Reference: Appendix 12, Transformer Room Louvred Door with Hasp & Staple
2x50mm
SP POWERGRID LTD
Transformer Plinth
75mm x 25mm
Deep Grove
SP POWERGRID LTD
Angled-iron to be
solidly welded
across the trench
All cable trenches to be covered by removable hot-dipped galvanized mild steel gratings
Angled-iron to be
solidly welded
across the trench
SP POWERGRID LTD
Temporary Substation
SP POWERGRID LTD
LT Opening (OGB)
200mm
SP POWERGRID LTD
Trap Door
SP POWERGRID LTD
SP POWERGRID LTD
To DB Box
Fencing
Draw Pit
SP POWERGRID LTD
Butterfly Lock
Signage
SP POWERGRID LTD
MCT
SP POWERGRID LTD
Cable Lugs
Hot Gland
SP POWERGRID LTD
Arrangement of 500mm2 or 1000mm2 Cu single core cables is carried out as shown below so
that the current in each phase is evenly distributed between the cables for that phase.
Arrangement 1
L3 L2 L1 N L1 L2 L3
Arrangement 2
L3 L3
L2 L1 N L1 L2
**All the 7 item below need to be done by the main contractor after the substation work had
been completed
For handover of substation, kindly liaise with the Project Officer of the respective section using