You are on page 1of 1

Assignment no 5

Solve the question for:


a. Cost minimization through Hungarian Method
b. Profit Maximization through Hungarian Method

1)
Work\ Job I II III IV
A 42 35 28 21
B 30 25 20 15
C 30 25 20 15
D 24 20 16 12

2)

Work\ Job I II III


A 50 43 22
B 34 65 61
C 36 77 57
D 40 24 25