Project: UOB Tower 2

Details for the pile testing - Option 1

Main Building

Ref. Dwg No. AJ137/SCL/1.0

SBP Secondary Pile Number details for Inclinometer

SBP Secondary Pile


Number
S-8
S-26
S-45
S-66
S-88
S-100
S-128
S-150

SBP Secondary Pile Number details for Sonic Logging Test

SBP Secondary Pile


Number
S-5
S-29
S-55
S-76
S-83
S-102
S-113
S-126
S-157

file:///conversion/tmp/scratch/475259419.xlsx 05/11/2020
05/11/2020

Project: UOB2

Lab Test Schedule:

Core Laboratory Test


BH. No. Depth CRR (%) RQD (%)
Number UCS PLT
10.5 C2 100 72 1
ABH-44
12.0 C3 100 100 1
13.5 C1 100 94 1
ABH-45
15.0 C2 100 85 1
ABH-49 18.0 C1 80 24 1
10.0 C2 100 33 1
ABH-50
14.7 C5 100 32 1
ABH-51 21.5 C2 100 48 1
ABH-52 16.0 C7 100 70 1
14.5 C4 100 36 1
ABH-53
16.0 C5 100 64 1
14.7 C1 100 10 1
ABH-54
23.5 C4 100 14 1

file:///conversion/tmp/scratch/475259419.xlsx 7
05/11/2020

Project: UOB2

Lab Test Schedule:

Core Laboratory Test


BH. No. Depth CRR (%) RQD (%)
Number UCS PLT
35.8 C4 100 66 1
ABH-25
38.8 C6 100 100 1
14.5 C1 100 56 1
ABH-26
17.5 C3 100 80 1
12.3 C1 100 100 1
ABH-27
18.3 C5 100 64 1
12.8 C3 100 50 1
ABH-28
15.8 C5 100 23 1
11.5 C1 100 52 1
ABH-29 19.0 C5 100 60 1
22.0 C7 100 80 1
40.0 C3 100 53 1
ABH-32
44.5 C6 100 100 1
25.0 C1 100 33 1
ABH-33
29.5 C4 100 100 1
27.5 C2 100 78 1
ABH-34 30.5 C4 100 50 1
38.0 C9 100 100 1
16.5 C3 100 42 1
31.3 C7 100 36 1
46.5 C12 100 15 1
ABH-2
49.5 C14 66 39 1
57.0 C19 100 60 1
58.5 C20 100 13 1
ABH-6 37.0 C3 100 73 1
13.0 C5 100 24 1
16.0 C7 100 66 1
ABH-8
20.5 C10 100 60 1
29.5 C16 100 19 1
14.0 C2 100 19 1
22.0 C4 100 33 1
ABH-17
26.5 C7 100 24 1
34.0 C12 100 13 1

file:///conversion/tmp/scratch/475259419.xlsx 7
05/11/2020

Project: UOB Tower 2

Details for the pile testing - Option 1

Location : Main Building

Ref. Dwg No. AJ137/SCL/1.0

SBP Secondary Pile Number details for Standpipe piezometer to monitor during earthworks

Min. offset from SBP pile outer edge to towards Site boundary = 1.2m

SBP Secondary Pile


Number
S-8
S-26
S-45
S-66
S-88
S-128
S-150

file:///conversion/tmp/scratch/475259419.xlsx 7
05/11/2020

Project: UOB Tower 2

SBP Secondary Pile Number details for Low strain Pile


Integrity Test (PIT)

SBP Secondary
S.No. Remarks
Pile Number

1 S-6 NO

2 S-16 NO

3 S-28 NO

4 S-38 NO

5 S-47 NO

6 S-58 NO

7 S-72 NO

8 S-84 NO

9 S-92 NO

10 S104 NO

11 S132 NO

12 S141 NO

13 S147 NO

14 S154 YES

15 S164 NO

Priority Area BP-05 NO

SBP Secondary Pile Number details for Sonic Logging


Test

SBP Secondary
Remarks
Pile Number

S-5 YES

S-29 YES
Remedial works has to caaried out prior to
S-55 YES
excavation started
S-76 YES

S-83 YES

S-102 YES

S-113 YES

S-126 YES

S-157 YES

file:///conversion/tmp/scratch/475259419.xlsx 7
05/11/2020

Sonic Logging Test on BP

SBP Number Pile Number Remarks


SLT-1 BN-26 YES Remedial works has to caaried out
prior to excavation started
SLT-1 BN-26 NO
After grouting carried out
SLT-2 BN-24 YES

SLT-3 BN-10 NO

SLT-4 BN-13 YES

SLT-5 BN-40 NO

SLT-6 PTP YES

SLT-7 BN-03 NO

SLT-8 BN-76 NO

BP-02 NO
Priority Area
BP-05 NO

INS Reports

INS Report
Remarks
Number
INS-11 NO

INS-12 NO

INS-13 NO

INS-14 NO

INS-15 NO

INS-16 NO

INS-17 NO

INS-18 YES

INS-19 NO

INS-20 NO

INS-21 NO

INS-22 NO

INS-23 NO

INS-24 NO

INS-25 NO

INS-26 NO

file:///conversion/tmp/scratch/475259419.xlsx 7
05/11/2020

Proof Coring

Location Pile Number Remarks

Priority Area BP-05 NO


TOWER PILE BN-03 NO

As Built Drawings

Drawing
Location Remarks
Reference
Priority Area CBP NO
SBP NO
Main Building
TCBP NO

IJM Submitted
Report Number Description Date Remarks

UCS TEST REPORT FOR ROCK


IJMC/UOB2/TS/FOU//TST/GCU/63 NO
PROBING WORKS
5/2/2018
MS ON REMEDIAL WORKS ON
IJMC/UOB2/TS/FOU/MOS/GCU/10 NO
SECANT PILE WALL -

file:///conversion/tmp/scratch/475259419.xlsx 7