You are on page 1of 1

Standard DS-1® Fourth Edition, Volume 3 - ADDENDUM 9

Applies to First, Second, Third and 2018 Printing

In this Volume 3 - Addendum 9, the following items have been modified or added:
Item Page
¶ 3.14.6.j.................................................................................................................................................... 1
¶ 3.25.6.j.................................................................................................................................................... 1

Page 65
¶ 3.14.6.j
CURRENT: CHANGE TO: (Amended text is underlined)

j. Pin Cylinder Diameter: The pin cylinder diameter j. Pin Cylinder Diameter: This is not required for Grant
shall be measured and shall meet the requirements Prideco connections.
shown in table 3.9.5 or 3.9.7, as applicable.

Page 87
¶ 3.25.6.j
CURRENT: CHANGE TO: (Amended text is underlined)

j. Lift sub dimensions: Lift subs for drilling equipment j. Lift sub dimensions: Lift subs for drilling equipment
shall meet the dimensions shown in figure 3.25.4 shall meet the dimensions shown in figure 3.25.4
and the following (in inches): and the following (in inches):
DP (±1/32) DL (+1/8, -0) d (max) DP (±1/32) DL (+1/8, -0) d (max)

2-3/8 3-3/8 1-49/64 2-3/8 3-1/2 1-49/64


2-7/8 4-1/8 2-9/64 2-7/8 4-1/4 2-9/64
3-1/2 4-3/4 2-45/64 3-1/2 5 2-45/64
4 6 3-17/64 4 6 3-17/64
4-1/2 6-1/4 3-49/64 4-1/2 6-1/4 3-49/64
5 6-1/2 3-49/64 5 6-1/2 3-49/64
5-1/2 7 4-1/64 5-1/2 7-1/4 4-1/64
5-7/8 7-9/16 4-17/64 5-7/8 7-9/16 4-17/64
6-5/8 8 5-1/64 6-5/8 8 5-1/64
Note: The taper angle ... Note: The taper angle ...

Issue Date: October 28, 2019 Page 1 of 1