Approximate Bill of Quantities - Phase 1B

March 2019 | 100%DD Update

Basement Construction
(Provisional Lump Sum Price)

in connection with the

Faisaliah Redevelopment Upgrade Project

located at

Riyadh, Kingdom of Saudi Arabia


Date : March 2019
###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
-
-
NOTES -
-
A As part of the Lump Sum Fixed Price for the Works, the Note -
Contractor shall include in this section for all items deemed
necessary to complete the Works.
-
B Attention is drawn to the following drawings and Note -
specifications, including but not limited to Architects
Specification - Division 3 Concrete & Structural
Specifications.
-
C The rates / prices in this section shall take cognizance of and Note -
shall be deemed to include but may not be limited to the
following:
-
D All Concrete Works to foundations, beds, pits, soft spots, Note -
walls, columns, beams, slabs, stairs, upstands.
-
E Any / all necessary special concrete finishes to conform with Note -
the Specifications, including; fair faced finishes to exposed
surfaces, touching up finishes, repairs to finishes etc.

-
F Contractor is responsible for temporary stability during Note -
construction and for all temporary works design
-
G All necessary steel reinforcements, treaded couplers, chairs, Note -
spacers, tying wire, accessories and all necessary cutting and
bending.
-
H All necessary, tamping, vibrating, surface treatments (power Note -
floating, trowelling etc.), curing, protection etc.
-
J All / any necessary construction joints (Transverse, Note -
Longitudinal, contraction, isolation etc.), joint filler, mastics.

-
K Integration/forming of all necessary service openings. Note -
-
L All necessary platforms for Mechanical and Electrical Note -
Equipment/Plant, incl any base hardeners or slab thickening
for plant and equipment.
-
M All necessary lifting, hoisting, cranage etc. Note -
-
N The layout for all construction joints must be submitted to the Note -
Engineer prior to commencement. Construction joints are not
measured separately and are deemed to be included within
the rates.
-
P Allow for liaising with the Steel Contractor as required; note Note -
the Cast-In Fixing Inserts for the Steel Frame are to be
installed by the Steel Contractor as part of the steel works.
The below is deemed to include all costs associated with
progress on same.
-

05/12/2020 - DIVISION 03 - CONCRETE Page 3 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
Q All BOQ Items shall be priced by the Contractor on a Lump Note -
Sum Basis. As such, the Contractor shall satisfy himself as to
the adequacy of all BOQ Quantities.
-
-
-
-
-
-
-
To Collection
SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 4 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

-
NOTES (Cont'n) -
-
A The contractor shall note the requirement for noise and Note -
vibration monitoring throughout the Excavation Works. The
Contractor is deemed to have included all costs associated
with same within their tender.
-
B The Contractor is requested to insert quantities for items of Note -
work where he thinks applicable and appropriate; hence, no
claim for additional quantities will be entertained
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

05/12/2020 - DIVISION 03 - CONCRETE Page 5 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
-
-
-
-
-
-
-

To Collection
-

05/12/2020 - DIVISION 03 - CONCRETE Page 6 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

Concrete Formwork

Concrete formwork, comprising of fabrication and


manufacture, construction and erection, shoring together
with associated removal; all in accordance with the
drawings and Specification Section 03 10 00

A To sides of Matt Foundation 1,036 m2 -


-
B To sides of RC Footing 3,528 m2 -
-
C To sides of Pits 559 m2 -
-
D To sides of Retaining Wall 10,724 m2 -
-
F To sides of Flat Slab 292 m2 -
-
G To underside of Flat Slab 40,502 m2 -
-
H To sides of Drop Panel 440 m2 -
-
J To underside of Drop Panel 2,221 m2 -
-
K To sides of Beam 1,578 m2 -
-
L To underside of Beam 485 m2 -
-
M To soffits of Ramp Slab 1,704 m2 -
-
N To edges of concrete sidewalk; 100mm thick 93 m2 -
-
P To sides of Shear Wall 6,104 m2 -
-
Q To sides of Columns 9,404 m2 -
-
R To Ramp Walls 2,298 m2 -
-
S To sides of Upstand Wall 226 m2 -
-
-
-

05/12/2020 - DIVISION 03 - CONCRETE Page 7 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

-
-

To Collection -

Concrete Reinforcement and Embedded Assemblies -


-
Deformed Bars; ASTM A615 Grade 60 with minimum -
yield strength of 420 Mpa (60 ksi); all in accordance with
the Drawings and Specification Section 03 20 00
-
A to Matt/Raft Foundation 1,210 t -
-
B to RC Footing 384 t -
-
C to Pits 19 t -
-
D to Retaining Wall 867 t -
-
F to Flat Slab 1,288 t -
-
G to Drop Panel 29 t -
-
H to Beam 181 t -
-
J to Ramp Slab 58 t -
-
K to Shear Wall 145 t -
-
L to Columns 448 t -
-
M to Ramp Wall 44 t -
-
N to Upstand Wall 5 t -
-
-
-
Welded wire reinforcement; ASTM A185 and A82; all in -
accordance with the drawings and Specification (FRUP-
THT-ST-00-DWG-0000002)
-
P To Concrete sidewalks 2,205 m2 -

05/12/2020 - DIVISION 03 - CONCRETE Page 8 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

To Collection -

05/12/2020 - DIVISION 03 - CONCRETE Page 9 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

Cast-in-Place Concrete

Cast-in-place concrete comprising of placement of


materials, joints, surface finish, curing and protection
together in accordance with the Drawings and
Specification Section 03 30 00

Blinding

A To horizontal, 100mm thick 12,475 m2 -


-

Reinforced in situ concrete; 30MPA; portland cement -


American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification Section 03 30 00

B Mass Concrete Fill Between Walls 7 m3 -


-
Reinforced in situ concrete; 40MPA; portland cement -
American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification Section with the
Drawings and Specification Section 03 30 00

-
C Mat/Raft Foundation; 600 mm thick 6,935 m3 -
-
D Mat/Raft Foundation; 1200 mm thick 174 m3 -
-
E Mat/Raft Foundation; 1600 mm thick 298 m3 -
-
F Mat/Raft Foundation; 2400 mm thick 1,236 m3 -
-
G Reinforced Concrete Footing; refer to FRUP-THT-ST-00- 2,261 m3 -
DWG-1105000 Series
-
H Pits 114 m3 -
-
J Retaining Wall 4,815 m3 -
-
K Extra-over allowance for Breakout Panels to Retaining Wall 197 m3 -

-
-
Reinforced in situ concrete; 45MPA; portland cement -
American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification Section FRUP-THT-ST-
1B-SPC-0033000

-
L Flat Slab 11,194 m3 -
M Drop Panel 352 m3 -
N Beam 455 m3 -
O Ramp Slab 500 m3 -

05/12/2020 - DIVISION 03 - CONCRETE Page 10 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
P Concrete sidewalks 221 m3 -

To Collection -

05/12/2020 - DIVISION 03 - CONCRETE Page 11 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

Cast-in-Place Concrete [cont'd]

Reinforced in situ concrete; 60MPA; portland cement


American Concrete Institute (ACI 318M-2008); include for
all construction joints as required; all in accordance with
the Drawings and Specification Section FRUP-THT-ST-
1B-SPC-0033000

A Shear Wall 1,208 m3 -


-
B Columns 2,035 m3 -
-
C Ramp Wall 367 m3 -
-
D Upstand Wall 34 m3 -
-
Plinths/Machine Bases -
-
Supply and installation of Plinths/Machine Bases, -
comprising of concrete, reinforcement, shuttering; all in
accordance with the with the drawings and Specification

-
F To basement 05 1 item -
-
-
Concrete Construction Joints -
-
G Continuous Water stops at Construction Joints 2,667 m -

Trench; including all associated works; all in accordance -


with the drawings and specifications
-
H Trench 183 m -
-
Concrete finishes and repair works, including associated -
bonding agent and surface finish; all in accordance with
the Drawings and Specification Section

-
J Extra-over; for powder floated finish to receive floor finish 48,832 m2 -

05/12/2020 - DIVISION 03 - CONCRETE Page 12 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

To Collection -

05/12/2020 - DIVISION 03 - CONCRETE Page 13 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

Precast Structural Concrete

Precast concrete; including reinforcement and all


necessary accessories; all in accordance with the
Drawings and Specification Section 03 41 00
-
A Curb; To sidewalks, 150 x 150mm size 921 m -
-
B Wheel stopper; 1800 x 180 x 150mm size 1,117 Nr -
-
Precast Concrete stair; comprising of tread, risers, -
stringer, sloping soffit of all standard module to
manufacturer's instructions; epoxy grout; fair face
surface finish; all in accordance with the drawings and
specifications
-
Stair RS-02A and HS-02 -
-
C 1220mm wide x 2598mm High; 14 stair treads/risers 4 nr -
-
D 1220mm wide x 1852mm High; 10 stair treads/risers 8 nr -
-
E 1220mm wide x 1347mm High; 8 stair treads/risers 4 nr -
-
F 1220mm wide x 2408mm High; 13 stair treads/risers 2 nr -
-
G 1220mm wide x 1892mm High; 11 stair treads/risers 2 nr -
-
H 1500mm x 1520mm; landing 4 nr -
-
Stair HS01-A -
-
J 1220mm wide x 1300mm High; 7 stair treads/risers 1 nr -
-
K 1220mm wide x 1600mm High; 9 stair treads/risers 6 nr -
-
L 1220mm wide x 1617mm High; 8 stair treads/risers 1 nr -
-
M 1220mm wide x 1976mm High; 8 stair treads/risers 1 nr -
-
N 1220mm wide x 2150mm High; 11 stair treads/risers 1 nr -
-
P 1500mm x 1520mm; landing 5 nr -

Stair RS01-A
-
Q 1220mm wide x 1347mm High; 8 stair treads/risers 3 nr -
-
R 1220mm wide x 1853mm High;10 stair treads/risers 2 nr -
-
S 1220mm wide x 2039mm High;11 stair treads/risers 2 nr -
-
T 1220mm wide x 2236mm High;12 stair treads/risers 2 nr -
-
U 1220mm wide x 2369mm High;13 stair treads/risers 1 nr -
-

05/12/2020 - DIVISION 03 - CONCRETE Page 14 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
V 1500mm x 1520mm; landing 5 nr -
-

To Collection -

05/12/2020 - DIVISION 03 - CONCRETE Page 15 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
-
-
Precast Structural Concrete [cont'd] -
-
Precast concrete lintels; including reinforcement and all -
necessary accessories; all in accordance with the
Drawings and Specification Section

-
A 100mm x 200mm size 10 m -
-
B 150mm x 200mm size 61 m -
-
C 200mm x 200mm size 3 m -
-
D 250mm x 200mm size 16 m -
-
E To walls exceeding 3m height; 100mm x 200mm size 1 item -
-
-
Concrete Topping (Screed) -
-
Proprietary quick drying bonded levelling screed; basis -
of design: Flowcrete UK, Isocrete Heavy Duty "K" screed
or similar by Flowcrete or approved equal; including
fabric reinforcement and all necessary accessories; all in
accordance with the drawings and Specification Section
03 53 00

-
F To basement floors, 100mm thick 5,419 m2 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

05/12/2020 - DIVISION 03 - CONCRETE Page 16 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works
-
-
-
-

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 17 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

-
Additional Items -
-
-
The Contractor shall describe and price below the items
necessary for the full and proper Completion of the
Works as described in the Specifications or shown on
the Drawings and for which either expressed or implied
provision is required and which are not covered by either
the items or the rates in the Bills of Quantities and
whether arising from the class of work, Conditions of
Contract or any other matter whatsoever. Anything not
so separately described shall be deemed to be covered
in the items and rates inserted in the Bills of Quantities.

-
A _______________________________________________ -
-
B _______________________________________________ -
-
C _______________________________________________ -
-
D _______________________________________________ -
-
E _______________________________________________ -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

05/12/2020 - DIVISION 03 - CONCRETE Page 18 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

To Collection SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 19 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

COLLECTION

#REF! SAR -

#REF! SAR -

#REF! SAR -

#REF! SAR -

#REF! SAR -

#REF! SAR -

#REF! SAR -

#REF! SAR -

#REF! SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 20 of 21


###
#REF!
Bill of Quantities ''D''
Code Description Quantity Unit Rate Total
Division 03 - Concrete Works

Carried to BOQ "D" General Summary SAR -

05/12/2020 - DIVISION 03 - CONCRETE Page 21 of 21