You are on page 1of 5

Outlet Header

Upper Riser Tubes

Lower Riser Tubes

Bifurcations

Figure 1 The top section od the low temperature superheater. The locations at which the test an inspection
are to be done are indicated.

Calaca Power Station Number 2 Boiler - Inspection and Assessment of the Boiler High Temperature HLC/2019/213
Headers and Tubing Part 1 2018 Inspection Program
Page 8 of 12
Prepared for Calaca Power Station
Figure 2 The final superheater (S34)and the final reheater (R11 and
R13).

Calaca Power Station Number 2 Boiler - Inspection and Assessment of the Boiler High Temperature HLC/2019/213
Headers and Tubing Part 1 2018 Inspection Program
Page 9 of 12
Prepared for Calaca Power Station

You might also like