CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI
2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
GENERAL NOTES,
REINFORCEMENT NOTES: INDEX OF SHEET
1. ALL REINFORCEMENT IS OF GRADE A615/60 (U.O.N.) &
2. TYPICAL CLEARANCES ARE AS FOLLOWS: LAP SCHEDULE
CONCRETE AND OTHER MEMBERS PLACED DIRECTLY ON GROUND = 3"
CONCRETE EXPOSED TO EARTH OR WEATHER FOR BAR LARGER THAN #5 = 2"
CONCRETE EXPOSED TO EARTH OR WEATHER FOR #5 BAR OR SMALLER = 11 2"
BEAMS & GIRDERS NOT EXPOSED TO WEATHER OR GROUND = 11 2"
SLABS & WALLS NOT EXPOSED TO WEATHER OR GROUND = 3 4"
3. BARS TO BE PLACED AT EQUAL SPACING U.O.N.
R0
1 2 4 5 11 10
R-3A R-3
L2
L1
SOG
7'-8"
K M
3'-9"
J H
4'
G
3'-9"
F
8'-2"
E1
D
E
2'-5"
B
17'-0 9 "
R-3B
16
A2
1"
3'-24
A1
1 2 3 4 6 7 8 9 10
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
FOUNDATION
LAYOUT PLAN
R1
1 2 4 5 11 10
L2
L1
.
(6) #8 8B01
5'-2 3 "
16
(5) #8 @ 12" 8B06
(7) #8 x 10'-3" @ 12"
(5) #8 x 30-0" @ 12" H.Y. 08.23.2019
.
.
.
(4) #8 x 24'-3" @ 12"
K . (4) #8 @ 12" 8B03 M
.
J H
.
.
(4) #8 x 24'-3" @ 12" (11) #8 @ 12" 8B02
.
4'-7" MIN.
.
.
.
E1
D
E
C (18) #8 x 23'-9" @ 12"
.
.
.
(18) #8 @ 12" 8B03
A1
(1) #8 8B01
1 2 3 4 6 7 8 9 10
18 T1
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
R2
1 2 4 5 11 10
L2
L1
G
.
B
(36) #8 @ 12" 8B11
.
A2
A1
1 2 3 4 6 7 8 9 10
18 T1 161 T8
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
R2A
1 2 4 5 11 10
L2
L1
H.Y. 08.23.2019
K M
(8) #8 x 8'-0" @ 12"
.
J H
.
(8) #8 x 8'-0" @ 12"
G (8) #8 x 8'-0" @ 12"
.
.
(8) #8 x 8'-0" @ 12"
(8) #8 x 8'-0" @ 12"
.
(8) #8 x 8'-0" @ 12" (8) #8 x 8'-0" @ 12"
. .
(8) #8 x 8'-0" @ 12"
.
E1
.
D
(8) #8 x 8'-0" @ 12"
.
.
E
.
C (8) #8 x 8'-0" @ 12" (8) #8 x 8'-0" @ 12"
(8) #8 x 8'-0" @ 12"
A2
A1
1 2 3 4 6 7 8 9 10
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
R2B
1 2 4 5 11 10
L2
L1
.
(7) #8 x 21'-3" @ 12" (4) #8 @ 12" 8T05 H.Y. 08.23.2019
K M
.
(9) #8 x 30'-0" @ 12"
.
(50) #8 @ 12" 8T01
J H
.
F (8) #8 @ 12" 8T03
.
.
E1
D
.
E
C
.
B
(28) #8 x 30'-0" @ 12"
A2
A1
1 2 3 4 6 7 8 9 10
18
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
R2C
1 2 4 5 11 10
L2
L1
H.Y. 08.23.2019
K M
(15) #8 @ 12" 8T18 (9) #8 @ 12" 8T16
.
.
J H
(36) #8 @ 12" 8T17
.
. (30) #8 x 26'-6" @ 12"
.
E1
D
E
C
B
(36) #8 @ 12" 8T12
.
(9) #8 @ 12" 8T15
.
A2
A1
1 2 3 4 6 7 8 9 10
18
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
R2D
1 2 4 5 11 10
L2
L1
6'
(7) #6 @ 12" 6A01
M H.Y. 08.23.2019
K
3'
(9) #6 @ 12" 6A03 (4) #6 @ 12" 6A02
8'
J H
7'
(30) #8 x 14'-0" @ 12"
29'
4'
A2
A1
1 2 3 4 6 7 8 9 10
18
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
R2E
5 11 10
REF. R5
(4H) #8 x 30'-0" @ 12"
REF. R5A
(6H + 2V) #8 @ 12" 8S13
#8 @ 12" 8S15
1"
1"
L2 REF. R-2A
1'-114
1'-114
REF. R-2
. CELLER T.O.S.
.
23.24'
.
4'-7" MIN. TYP UON #8 @ 12" 8S02
2'
BOTTOM OF FOOTING
.
M 3 SECTION A-A
R3 SCALE:- 3 8"" = 1'-0"
REF. R5
STEPPED FOOTING BOTTOM REINFORCEMENT DETAILS
REF. R5A
1 (GRID L2) (4) #8 x 30'-0" @ 12"
R3 SCALE:- 14" = 1'-0"
#8 @ 12" 8S17
(1H+2V) #8 @ 12" 8S12
1"
1"
REF. R-2A
1'-114
1'-114
1'-6"
REF. R-2
CELLER T.O.S.
#8 @ 12" 8S02
2'
BOTTOM OF FOOTING
#8 @ 12" 8S03
REF. R-2C 4'-0"
4 SECTION B-B
R3 SCALE:- 3 8"" = 1'-0"
11 10
L2
.
23
.
. .
.
.
.
18 33 T46 31
CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI STEP FOOTING
2. COLUMN, SHEARWALL: 5000PSI REINFORCEMENT DETAILS
3. SLABS, BEAMS: 5000PSI
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING R3
REF. R5 REF. R5
1'
1'
BOTTOM OF FOOTING
(5) #8 8A05 @ 12" 21.74'
1'
(6) #8 8A06 @ 12" (5) #8 8A05 @ 12" (6) #8 8A06 @ 12"
PIER BOTTOM
16.75'
PIER BOTTOM
16.33'
PIER BOTTOM
3 PIER REINFORCEMENT DETAILS (2 NOS)
12.67' R3A SCALE:- 3 8"" = 1'-0" 5 PIER REINFORCEMENT DETAILS
R3A SCALE:- 3 8"" = 1'-0"
CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI 6 PIER REINFORCEMENT DETAILS
2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI R3A SCALE:- 3 8"" = 1'-0"
4 PIER REINFORCEMENT DETAILS
R3A SCALE:- 3 8"" = 1'-0"
2 PIER REINFORCEMENT DETAILS GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
R3A SCALE:- 3 8"" = 1'-0" DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
REF. R5
REF. R5A A
CELLER T.O.S. (2) #7 7A02 (2) #7 7A01
(2) #7 7A01
23.24' REF. R5
(2) #7 7A02
BOTTOM OF FOOTING (29) #4 @ 6" 4A01
21.74' REF. R5A
1'
PIER BOTTOM
16.33'
.
.
.
A2
6 7 8 9 10
CONCRETE STRENGTH:
1 FOUNDATION REINFORCEMENT DETAIL (X DIRECTION) (GRID A2) 1. FOUNDATION WALLS / FOOTING: 5000PSI
R3B SCALE:- 14" = 1'-0" 2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
B 2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
.
.
.
A2
6 7 8 9 10
18 159 T2
FOUNDATION
(GRID A2)
REINFORCEMENT DETAILS
R3B
(4) #8 @ 12" 8E04 TO 8E07
.
. H.Y. 08.26.2019
.
A A
.
.
A A
(4) #8 @ 12" 8E08 TO 8E11 (4) #8 @ 12" 8E08 TO 8E11
.
1 ELEVATOR PIT REINFORCEMENT DETAILS 2 ELEVATOR PIT REINFORCEMENT DETAILS
R3C 3 R3C SCALE:- 3
SCALE:- 8"" = 1'-0" 8"" = 1'-0" (2x8) #5 @ 12" 5A01
CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI
2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI
T1 T12 159
REF. R2D REF. R2D
(2x4) #8 @ 12" 8E12
CELLER T.O.S. REF. R2C REF. R2C
23.24'
BOTTOM OF FOOTING
21.24' REF. R2 REF. R2
5'
3 SECTION A-A
R3C SCALE:- 3 16"" = 1'-0" R3C
C
B . B
.
(2x8) #8 @ 12" 8F02 T&B C
.
R3D SCALE:- 3
8"" = 1'-0"
.
REF. R5 C
REF. R5A (1 EACH) #8 @ 12" 8F06 TO 8F08
REF. R2D (2x4) #8 @ 12" 8A10
18 19
REF. R5
REF. R2C
REF. R2D (5) #8 @ 12" 8F15
CELLER T.O.S.
23.24'
(5) #8 @ 12" 8F14
BOTTOM OF FOOTING
21.24' (7) #8 @ 12" 8F12
(1) #8 8F05
4 SECTION C-C
R3D SCALE:- 3 8"" = 1'-0"
R3D
(2x4) #6 @ 6" 6A02 (2) #5 @ 12" 5A02
(2x22) #5 @ 12" 5A02 (2x18) #5 @ 12" 5A02
(2x6) #5 @ 12" 5A01
(4) #5 5A01 CORNERS (2x10) #5 @ 12" 5A01 (2x15) #5 @ 12" 5A02
(2x15) #5 @ 12" 5A01 (2) #5 @ 12" 5A02
(8) #6 @ 6" 6A02
2'
(2) #5 @ 12" 5A05 (2x2) #5 @ 12" 5A05
.
.
(2x5) #5 @ 12" 5A0 (2x4) #6 @ 6" 6A03 (2x3) #5 @ 12" 5A05 (2x2) #5 @ 12" 5A02
(2x3) #5 @ 12" 5A02 (2x6) #5 @ 12" 5A03
(2x5) #5 @ 12" 5A08
5'
(2x9) #5 @ 12" 5A08
(2x4) #6 @ 6" 6A02
.
(2x2) #5 @ 12" 5A06
(2x2) #5 @ 12" 5A05
(1) #5 @ 12" 5A02
.
H.Y. 08.26.2019
.
(1) #5 5A08
(2x13) #5 @ 12" 5A08
(1) #5 5A02
(2x4) #5 @ 12" 5A02
.
(2x2) #5 @ 12" 5A05
(2x2) #5 @ 12" 5A05
(2x4) #5 @ 12" 5A04
.
(2x2) #5 5A09
(1) #5 5A08
(2x2) #5 @ 12" 5A08
.
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
1 FOUNDATION WALL, SHEARWALL AND COLUMN DOWELS DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
R4 STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
SCALE:- 3 16"" = 1'-0"
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
1'-8" 1'-8" 1'-8" WALL AND COLUMN STARTS FROM TOP OF FOOTING
(8) #7 7A03 (8) #7 7A04 (8) #7 7A05
1'
1'
1'
C4,C7
8 (2NOS) 9 C12 10 C15, C19
R4 SCALE:- 3 8" = 1'-0" R4 SCALE:- 3 8" = 1'-0" R4 SCALE:- 3 8" = 1'-0" 18
1'-2"
1'-2"
C1,C5,C8,C9 C2,C3,C10,C11
2 (4NOS) 3 (4NOS) 4 C6
R4 SCALE:- 3 8" = 1'-0" R4 SCALE:- 3 8" = 1'-0" R4 SCALE:- 3 8" = 1'-0"
1'
C18,C20,C21,C22 C13,C14,C16,C17
5
R4
(4 NOS)
3
SCALE:- 8" = 1'-0"
6
R4
(4 NOS)
3
SCALE:- 8" = 1'-0"
R4
(3) #6 @ 6" 6A02
(2x9) #5 @ 12" 5A01 (2x6) #5 @ 12" 5A02 (2x4) #6 x 11'-6" @ 6"
(22) #5 @ 12" 5A03 (2x18) #5 @12" 5A03
(4) #5 5A01 CORNERS (2x10) #5 @ 12" 5A01 (2x9) #5 @ 12" 5A01 5'
(2x15) #5 @ 12" 5A01
(22) #5 x 11'-3" @ 12" (1+2x2) #6 x 11'-9" @ 6"
(2x10) #5 @ 12" 5A03
2'
(2x3) #5 @ 12" 5A03
9'
(2x5) #5 @ 12" 5A01 (2) #5 x 11'-3" @ 12" (2x4) #6 x 11'-9" @ 6"
(2x2) #5 @ 12" 5A04
(2x9) #5 @ 12" 5A01
.
(2x3) #5 @ 12" 5A04
(1) #5 5A01
(2x13) #5 @ 12" 5A01
18
R5
(1) #5 x 22'-9"
(1) #5 x 24'-0"
(1) #5 5A01
CONCRETE STRENGTH:
(1) #5 5A23 (1) #5 5A09
1. FOUNDATION WALLS / FOOTING: 5000PSI
(1) #5 5A19 2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI
(1) #5 5A20 (9) #5 x 22'-9" @ 12"
(9) #5 @ 12" 5A08
(11) #5 x 30'-0" @ 12"
(11) #5 x 27'-3" @ 12"
(9) #5 @ 12" 5A09
(9) #5 @ 12" 5A06 (9) #5 @ 12" 5A07
(11) #5 @ 12" 5A05
(11) #5 @ 12" 5A04 (9) #5 @ 12" 5A01
(10) #4 @ 12" 4A02
(10) #4 @ 12" 4A01 (1) #5 5A01
18
T1
19
R5A
21
CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI
2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI
1'
1'
3'
3'
. 5'-9" .
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
18 T1 19 21 SHEAR WALL 2
REINFORCEMENT DETAILS
R6
(2) #7 7A04 DOWELS
2'-3" MIN.
2'-3" MIN.
2'-3" MIN.
2'-3" MIN.
1st FLOOR T.O.S.
1st FLOOR T.O.S. 1st FLOOR T.O.S.
7"
33.87'
32.99'
8"
32.99'
8"
1st FLOOR T.O.S.
33.87' 7" (4) #4 @ 6" 4A01 TIES +
.
(4) #4 @ 6" 4A01 TIES +
.
(2x4) #4 @ 6" 4A02 TIES
.
(8) #7 7A02 VERT. (2x4) #4 @ 6" 4A02 TIES (4) #4 @ 6" 4A03 TIES +
(4) #4 @ 6" 4A01 TIES + (8) #7 7A02 VERT.
.
(2x4) #4 @ 6" 4A02 TIES (2x4) #4 @ 6" 4A04 TIES (8) #7 7A05 VERT.
B B C C F
(8) #7 7A01 VERT.
10'-012"
(4) #4 @ 12" 4A01 TIES + F
9'-1"
9'-1"
(5) #4 @ 12" 4A01 TIES + (5) #4 @ 12" 4A03 TIES +
1"
.
8'-14
.
.
(2x4) #4 @ 12" 4A02 TIES (2x5) #4 @ 12" 4A02 TIES (6) #4 @ 12" 4A01 TIES +
(2x5) #4 @ 12" 4A04 TIES
.
A A (2x6) #4 @ 12" 4A02 TIES
.
CELLER T.O.S. (2x4) #4 @ 6" 4A02 TIES (2x4) #4 @ 6" 4A02 TIES (4) #4 @ 6" 4A01 TIES +
CELLER T.O.S.
.
CELLER T.O.S.
25.23' 23.24' CELLER T.O.S. (2x4) #4 @ 6" 4A02 TIES
(2) #4 4A01 TIES + 23.24'
(2) #4 4A01 TIES + (2) #4 4A03 TIES + 23.24'
(2x2) #4 4A02 TIES (2x2) #4 4A02 TIES (2x2) #4 4A04 TIES (2) #4 4A01 TIES +
BOTTOM OF FOOTING BOTTOM OF FOOTING BOTTOM OF FOOTING (2x2) #4 4A02 TIES
23.25' FOR COLUMN DOWELS REF/R4 21.24' FOR COLUMN DOWELS REF/R4 21.24' BOTTOM OF FOOTING
21.24' FOR COLUMN DOWELS REF/R4
FOR COLUMN DOWELS REF/R4
1'
(2x15) #4 4A04 TIES (16) #4 4A01 TIES
1'
(2x14) #4 4A02 TIES (2x15) #4 4A02 TIES (8) #7 7A02
1'-2"
(2) #7 7A04 DOWELS (2x16) #4 4A02 TIES
2'-3" MIN.
8"
NOTE
1. FOUNDATION WALLS / FOOTING: 5000PSI 1. FOR COLUMN ORIENTATION REF. STRUCTURAL DRAWINGS
2. COLUMN, SHEARWALL: 5000PSI
.
3. SLABS, BEAMS: 5000PSI 2. CLEAR COVER TO STIRRUPS = 11 2"
.
(10) #7 7A02 VERT. (4) #4 @ 6" 4A03 TIES + (10) #7 7A02 VERT. (4) #4 @ 6" 4A05 TIES +
(2x4) #4 @ 6" 4A04 TIES (2x4) #4 @ 6" 4A04 TIES
D E GENERAL NOTE:
D E 1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
9'-1"
9'-1"
7 C10,C11 (2NOS) 9 C6
R7 SCALE:- 3 8" = 1'-0" R7 SCALE:- 3 8" = 1'-0"
COLUMN 1 TO 12
REINFORCEMENT DETAILS
1'-8" 2'
(10) #7 7A01 (10) #7 7A01
(15) #4 4A03 TIES (15) #4 4A05 TIES
(2x14) #4 4A04 TIES (2x15) #4 4A04 TIES
1'-2"
1'-2"
8
R7
SECTION D-D
SCALE:- 3 8" = 1'-0"
10
R7
SECTION E-E
SCALE:- 3 8" = 1'-0"
R7
2'-3" MIN.
2'-3" MIN.
1st FLOOR T.O.S. 1st FLOOR T.O.S.
32.99' 32.99'
8"
8"
(4) #4 @ 6" 4A06 TIES + (4) #4 @ 6" 4A01 TIES +
.
(2x4) #4 @ 6" 4A02 TIES (2x4) #4 @ 6" 4A02 TIES
9'-1"
(5) #4 @ 12" 4A06 TIES + (5) #4 @ 12" 4A01 TIES +
.
(2x5) #4 @ 12" 4A02 TIES (2x5) #4 @ 12" 4A02 TIES
.
CELLER T.O.S. (2x4) #4 @ 6" 4A02 TIES CELLER T.O.S. (2x4) #4 @ 6" 4A02 TIES
23.24' (2) #4 4A06 TIES + 23.24' (2) #4 4A01 TIES +
BOTTOM OF FOOTING (2x2) #4 4A02 TIES BOTTOM OF FOOTING (2x2) #4 4A02 TIES
21.74' FOR COLUMN DOWELS REF/R4 21.74' FOR COLUMN DOWELS REF/R4
3 C13,C14,C15,C16,C17,C19 (6 NOS)
1 C18,C20,C21,C22 (4 NOS) R7A SCALE:- 3 8" = 1'-0"
R7A SCALE:- 3 8" = 1'-0"
1'-6" 1'-8"
(8) #7 7A02 (8) #7 7A02
(15) #4 4A06 TIES (15) #4 4A01 TIES
1'
1'
(2x15) #4 4A02 TIES (2x15) #4 4A02 TIES
CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI
2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR NOTE
WALL AND COLUMN STARTS FROM TOP OF FOOTING 1. FOR COLUMN ORIENTATION REF. STRUCTURAL DRAWINGS
2. CLEAR COVER TO STIRRUPS = 11 2"
T11 21 18 159
COLUMN 13 TO 22
REINFORCEMENT DETAILS
R7A
(2x5) #5 @ 12" 5A01 (18) #5 @12" 5A01
(24) #5 @ 12" 5A01
(50) #5 @ 12" 5A01 4'
(22) #5 x 6'-0" @ 12" DOWELS (2'-6" EMBD.) (3) #6 X 7'-0" @ 6" DOWELS (3' EMBD.)
.
.
(2x4) #5 @ 12" 5A01
.
(2x8) #5 @ 12" 5A01
CONCRETE STRENGTH:
1. FOUNDATION WALLS / FOOTING: 5000PSI
2. COLUMN, SHEARWALL: 5000PSI
3. SLABS, BEAMS: 5000PSI 1 DOWELS CONNECTING FOUNDATION WALL TO 1ST FLOOR SLAB
R8 SCALE:- 3 16"" = 1'-0"
GENERAL NOTE:
1. CONTRACTOR TO VERIFY AND COORDINATE ALL ELEVATIONS,
DIMENSION AND SIZES AS PER ARCHITECTURE DRAWINGS AND
STRUCTURE DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
2. DRAWINGS TO BE USED AFTER ENGINEERS APPROVAL ONLY.
3. VERTICAL REINFORCEMENT FOR FOUNDATION WALL, SHEAR
WALL AND COLUMN STARTS FROM TOP OF FOOTING
8"
REF. R-4
18
R8