You are on page 1of 1

SCHEDULE OF FOOTINGS DETAIL OF STEEL COLUMN

SIZE REINFORCEMENT CODE MEMBER SIZE (MM) REMARKS


NAME OF REMARKS SL NO
S NO FOOTING NO
Lx X Lz d D Lx DIRECTION Lz DIRECTION
1 C1 COLUMN ISMB 200
1 F1 4'-0" x 4'-0" 10" 6'-0" 10# @ 7" C/C 10# @ 7" C/C
2 C2 COLUMN ISMB 250
2 F2 5'-0" x 5'-0" 10" 6'-0" 10# @ 6" C/C 10# @ 6" C/C
3 F3 5'-6" x 6'-6" 10" 6'-0" 10# @ 6" C/C 10# @ 5" C/C

A B C D E G H
STEEL COLUMN ISMB 200
FFL 6MMTH BASE PLATE

1 1
6NOS 12Ø BOLT 450MM LONG
PLINTH BEAM (9" X 12")
EMBEDDED WITH PEDESTAL
F2/C1 F2/C2 F2/C2 F2/C2 F2/C1
4-16#

GL GL

2
10# @ 6" C/C
BOTHWAY
F2/C1 3
4"TH PCC 1:4:8
F1/C1 F1/C1 F1/C1
SECTION AT A-A

4
5
F2/C1
F1/C1

PEDESTAL
F3/C2 F3/C1 9"X12"
F2/C1 F2/C2 F1/C1 F1/C1
2'-9" 2'-9"

2'-9" 2'-9"

STEEL COLUMN
6 6 ISMB 200 A A

3' 3'-6" 2'-6" 1' 2'-9"


6MM THICK
BASE PLATE

A B C D E F G H

FOUNDATION LAYOUT PLAN OF PEDESTAL FOOTING