FOOTING LYT.

FOOTING SCHEDULE (M25:Fe500)

FOOTING DIMENSIONS FOOTING REINF. BOTTOM


FOOTING COLUMN FOOTING

BOUNDARY
REMARKS

1'-4" THK

WALL
NUMBERS NUMBERS TYPE L B D1 D2 ALONG L ALONG B

27' F1 C1,C7,C10 Sloped 4'2" 3'6" 12" 6" T10@7" C/C T10@7" C/C REFER SECTION 1-1
F2 C2,C12 Pad 4'6" 4'4" 18" - T12@7" C/C T12@7" C/C REFER SECTION 2-2
A B C D Pad
F3 C3,C4 4'0" 4'0" 17" - T10@5" C/C T10@5" C/C REFER SECTION 2-2
3'-4" 9'-6" 7'-10" 3' 3'-4" F4 C5,C9,C11 Sloped 5'2" 4'6" 16" 6" T10@9" C/C T10@9" C/C REFER SECTION 1-1
F5 C6,C8 Pad 6'6" 5'10" 14" - T10@7" C/C T10@7" C/C REFER SECTION 2-2
1'-9"
4'-4"

2'-2" 2'-2"
3'-4"
C3 C4

2'

2'
1 1
C2 6" 6"

2'

2'
1'-10" F2 F3 F3 6" P.C.C
C1 6" P.C.C Steel along shorter span
Steel along shorter span
F1 2'-5" 3'-8" 3'-4"
2'-5"

1'-9" 4" 8"

shorter side
2'-1" Steel along longer span

Shorter Span
13'-6" Steel along longer span
2'-11" 2'-11"
2'-3" 2'-3" C
F

3'-3"
2'-7" 2'-7"

4" THK PCC


Longer Span

R
2 2 Longer side

N O
E D *
C6

O F
3'-3"

V
C5 Typical Isolated Column (PAD) Footing

TI D
O Typical Sloped Footing

C E
R

U V
ES * A P P

R O
ST R
F4 F5

E D *
N PP
O A
48'-6" 1'-10" COLUMN SECTION

C N
13'-10" 47'-6"
2'-11"

IG

V
2'-10"

COLUMN SECTION COLUMN (BXD) COLUMN

O
2'-4" 3'-3" 3'-3" 2'-3" 2'-3" COLUMN LINKS
R COLUMN (BXD)

DEPTH
PLINTH BEAM
1'-9"

COLUMN REINF.

D
* A P P LINKS PLINTH BEAM
COLUMN REINF.

DEPTH
REFER PLINTH REFER PLINTH
BEAM DRWG. BEAM DRWG.
GROUND LVL.
3 3 GROUND LVL.

C8
C7 C9
6" 6" 6" 6"
6" 6"

5'-6"
5'-6"
1'-9"

2'-4"

F1 F5 F4
5'-6"

bottom r/f
D2
2'-11"

B/W
1'-9" 11'-6" D1

D
1'-2"
2'-2"

1'-9"
2'-7" 2'-7" 3'-4" 6" THK PCC 6" THK PCC
1'-10"

Longer span LONGER SPAN


2'-4"

SECTION 1-1 SECTION 2-2


4 4
2'-3"

2'-2"

C10 C12
C11
2'-3"

NOTES PROJECT
5'-4" 5'-4"
F1 F4 F2 Size
1.ALL DIMENSIONS ARE IN FEET AND INCHES Brindavan
W 0 Gardenia- #16
330
340
350 10
20
30 2.DO NOT SCALE THE DRAWING
3'-4" 3'-4"
320 4O

Drawing title :
310 50

300 60 3.CONCRETE MIX M25 AND Fe500 STEEL FOR ALL MEMBERS
A B C D
290

280
70

4.T-DENOTES TOR STEEL Fe(500) FOOTING DETAILS A3


S 270
80 N Drawn Checked Authorised
260

250 110
90 5.S.B.C of soil=18Mt/m^2 (Assumed) Original
240 120
100
Scale MD.SIDDIQ RIYAZ UR RAHMAN MD.SIDDIQ
230

220 140
130
6.Foundation designed for G+2 only
210 150

Date: Date: Date:


200 160
190 170
180

27' 7.Lap length=50o 01-07-2023 01-07-2023 10-07-2023


E N.T.S

8.CLEAR COVER FOR FOOTINGS-2",COL-1.5" FOR 8" Drawing Number Rev


AND ABOVE,1" FOR 6",BEAMS-1" ,SLAB-3/4".
S-01 R01