SCHEDULE OF RCC COLUMN FOOTING OF AREA 'B'

REINFORCEMENT
DIMENSIONS
BOTTOM BARS TOP BARS
FOOTING REMARKS
MKD L B d D DF "X" DIRECTION "Z" DIRECTION "X" DIRECTION "Z" DIRECTION

F1 2200 2200 300 1000 1500 10 MM # @ 150 C/C 10 MM # @ 150 C/C - - 1. SBC OF SOIL IS AS
MENTIONED IN GENERAL
NOTES
F2 2100 2100 350 1000 1500 10 MM # @ 175 C/C 10 MM # @ 175 C/C - -
F3 2800 2800 400 1000 1500 10 MM # @ 125 C/C 10 MM # @ 125 C/C - - 2. FOR DIMENSION REF DRG
NO -CELZ/TD/ST-3002
SHEET NO-17/17
F4 2100 2100 300 1000 1500 10 MM # @ 150 C/C 10 MM # @ 150 C/C - -
F5 2200 2200 300 1000 1500 10 MM # @ 175 C/C 10 MM # @ 175 C/C - -
F6 1900 1900 300 1000 1500 10 MM # @ 200 C/C 10 MM # @ 200 C/C - -
F7 2500 2500 350 1000 1500 10 MM # @ 150 C/C 10 MM # @ 150 C/C - -

L
J K F3
F1 F2 M F1

F3
F4 F4 F5

SNO. DATE DESCRIPTION INITIAL


REVISIONS

PROVN OF FIRE STN TO INCL GARAGE FOR TFF AND LIVING ACCN FOR
FIRE CREW WITH ALLIED INFRA INSIDE AREA OF 41 FAD

MAIN FIRE STATION


F7
STRUCTURAL DETAILS:- FOUNDATION LAYOUT PLAN AND
F6 F6 F6 DETAILS OF FOOTINGS OF AREA 'B'
DATE 21 JUL 2022
DRN HAV N TAMANG CHIEF ENGINEER SHEET NO.
1
DES BY LEH ZONE 7/8
DF. NO.
SCALE NTS DRG.NO : CELZ/WD/ST/44-01/2022