N

C1 C2 C3 C4 B

F1 F2 F3 F4

F1 F3 F4
F2 C4
C2 C3
A
C1

X
1 2 3 3'

Foundation Lay Out Z

Schedule of Foundation:
Reinforcement
FDN MKD. Length width Depth Bottom Bottom Top Top
B.O.Foundation
mm mm mm (X Dirn) (Z Dirn) (X Dirn) (Z Dirn)
F1 RL-466.9 2650 2650 500 13@125C/C 13@125C/C 13@150C/C 13@150C/C
F2 RL-466.9 3000 3000 600 13@100C/C 13@100C/C 13@125C/C 13@125C/C
F3 RL-466.9 3000 3000 600 13@125C/C 13@125C/C 13@125C/C 13@125C/C
F4 RL-466.9 2500 2500 500 13@150C/C 13@150C/C 13@150C/C 13@150C/C

Column Schedule:
10T column ties

Longitudinal Transverse Reinforcement


Col. Mkd. Column Size
Reinforcement (Column Ties)

B(mm) D(mm)
C1 450 450 8Nos.-20 Dia 10 Dia. @ 200 C/C Main Bar
C2 450 450 8Nos.-25 Dia 10 Dia. @ 175 C/C
C3 450 450 8Nos.-25 Dia 10 Dia. @ 175 C/C
C4 450 450 8Nos.-20 Dia 10 Dia. @ 200 C/C Typical column Detail