SCHEDULE OF PLINTH BEAMS :-

`2'

`1' `1'

NOTE:- EXTENDED ALL STEEL UP TO END FOR CANTILEVER BEAM FROM BACK BEAM.
PROVIDE "EXTRA AT TOP OF SUPPORT" BAR AT COLUMN JUNCTIONS ONLY.
C-2,4,6,8,10
C-1,3,5,7,9

`2'

A C

STRUCTURAL NOTES:-

C1 C2 C1 C2
C-1,2 1

C3 C4 C3 C4
C-3,4 2

C5 C6 C5 C6
C-5,6 3
STEEL IN COLUMN

COLUMNS FROM SIZE OF COLUMN (b x d) 230 x 450


FOOTING TO
ROOF LEVEL
COLUMN LINKS
L1 & L2
'3'
MAIN STEEL BOTH WAYS AT
SHOE TOP & BOTTOM
C7 C8 C7 C8 FOOTINGS
C-7,8 4 DEPTH OF FOOTING (DF) 425 475
DETAILS
'3' '3'
SIZE OF FOOTING (Lf x Bf) 1300 x 1100 1500 x 1300
Owner Name :-
SIZE OF FOOTING BEAM (b x d) 300 x 530 300 x 530
Mr. PANDIT SIR HOME
FOOTING STEEL AT BOTTOM
C9 C10 C10 BEAM
C-9,10 5 C9
DETAILS STEEL AT TOP Drawing Title :-
RCC DRAWING OF BUNGALOW
STIRUPS AT POST: PUNE
'3' '3' 2L STIRRUPS 2L STIRRUPS
THK. OF P.C.C. 100 mm THK. Drawing Number :- ---- Sheet No :- A2 (1 of 3)
PLAN AT FOUNDATION '3'
COLUMN NUMBERS C1, C2, C9, C10 C3, C4, C5, C6, C7, C8 Scale :- AS SHOWN Drawn By :- --- Checked By :- --- Date:- 12 / 10 / 2022
& CENTER LINE PLAN
PLAN AT PLINTH BEAM LEVEL FOOTING F1 F2
Drawing Status :- FOR CONSTRUCTION Approved By :- --- Rev :- R0
'A' 'B'

'A' 'B' TYP. BEAM BAR ANCHORED


SECTION ' A - A ' SECTION ' B - B ' IN COLUMN
TYP. DETAILS OF CONTINUOUS BEAM

SCHEDULE OF ROOF SLABS :-

TYP.DETAILS OF CONTINUOUS SLAB


SCHEDULE OF 1st, 2nd & 3rd FLOOR SLABS :-

C1 C2 C1 C2

SCHEDULE OF ROOF BEAMS :-

C3 C4 C3 C4

NOTE:- EXTENDED ALL STEEL UP TO END FOR CANTILEVER BEAM FROM BACK BEAM.
PROVIDE "EXTRA AT TOP OF SUPPORT" BAR AT COLUMN JUNCTIONS ONLY.
NOTE : - ROOF BEAM RB3,4,12,13 IS MISSING

SCHEDULE OF 1st, 2nd & 3rd FLOOR BEAMS :-


C5 C6 C5 C6

'3' '3'

C7 C8 C7 C8

'3' '3' '3' '3'

NOTE:- EXTENDED ALL STEEL UP TO END FOR CANTILEVER BEAM FROM BACK BEAM.
PROVIDE "EXTRA AT TOP OF SUPPORT" BAR AT COLUMN JUNCTIONS ONLY. Owner Name :-
C10 C10 Mr. PANDIT SIR HOME
C9 C9

Drawing Title :-
'3' '3' '3' '3' RCC DRAWING OF BUNGALOW
AT POST: PUNE
'3' '3'
Drawing Number :- ---- Sheet No :- A2 (2 of 3)
PLAN AT 1st, 2nd & 3rd FLOOR BEAM LEVEL PLAN AT ROOF BEAM LEVEL
Scale :- AS SHOWN Drawn By :- --- Checked By :- --- Date:- 12 / 10 / 2022

Drawing Status :- FOR CONSTRUCTION Approved By :- --- Rev :- R0


3rd FLIGHT

'4' #16-2nos.+ #12-2nos.


#16-2nos. + #12-2nos. TH'OUT AT TOP
TH'OUT AT TOP

# 8 @ 100 C/C
FLIGHT NO. - 3 2L STIRRUPS

#12-2nos.

COLUMN -C9
TH'OUT AT
BOTTOM #12-2nos.
TH'OUT AT
BOTTOM
SECTION 4 - 4
SCALE=1:25 '4'

L-SECTIONAL DETAILS OF
CANTILEVER MID LANDING BEAM (MB2)
FROM COLUMN C9
SCALE=1:25

2nd FLIGHT

FLIGHT NO. - 2

1st FLIGHT

DETAILS OF
MID LANDING BEAM (MB1)
FROM COLUMN C7 TO C9
Owner Name :-
Mr. PANDIT SIR HOME

FLIGHT NO. - 1 Drawing Title :-


RCC DRAWING OF BUNGALOW
AT POST: PUNE

Drawing Number :- ---- Sheet No :- A2 (3 of 3)

SECTION ' 3 - 3 '


Scale :- AS SHOWN Drawn By :- --- Checked By :- --- Date:- 12 / 10 / 2022
SECTIONAL DETAILS OF STAIR CASE-ST1
Drawing Status :- FOR CONSTRUCTION Approved By :- --- Rev :- R0