FLOOR BEAM SCHEDULE ISOLATED FOOTING SCHEDULE H.L.

GRADE OF CONCRETE-M25
850 00 500
3

AS/ARCH.
BEAM SIZE STIRRUPS SIZE PEDESTAL ALONG SHORTER ALONG LONGER
BEAM SUPPORT SPAN FDN. d D DIRECTION DIRECTION
MARKED MKD. a b (HEIGHT)
WIDE DEPTH TOP BOTTOM TOP BOTTOM SUPPORT SPAN (e) (f)

B-1 300 500 3-20 3-16 2-20 2L-8 @ 100 C/C 2L-8 @ 150 C/C
3-16
AS/ARCH.
4-20 2-16 4-20 2-16
B-2 300 500 2L-8 @ 100 C/C 2L-8 @ 100 C/C

B-3 300 500 4-20 3-16 2-20 3-16 2L-8 @ 150 C/C
2L-8 @ 100 C/C 850

15
TYPICAL REINFORCEMENT CURTAILMENT DETAILS OF BEAM

0
B-4 300 500 2-16 2-16 2-16 3-16 2L-8 @ 150 C/C 500
2L-8 @ 100 C/C
SECTION B-B
(+) 0.450 LEV.
B-1A 300 400 2-16 2-16 2-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C
2-16

HLB 300 500 3-16 3-16 2-16 3-16 2L-8 @ 150 C/C

300
2L-8 @ 100 C/C

TIE BEAM SCHEDULE 200


FL.B
(±) 0.00 LEV.
SL TIE TIE BEAM
SUPPORT SPAN STIRRUPS
NO. BEAM SIZE 0.3L
8
MARKED WIDE DEPTH TOP BOTTOM TOP BOTTOM SUPPORT SPAN TB-1
500 300 50

AS/ARCH.
3-16 3-16 3-16 3-16
2L-8 @ 100 C/C 2L-8 @ 150 C/C
SPACING SHALL BE AS PER BEAM SCHEDULE
50D(LAP)
2-20 3-16 2-20 3-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C

AS/ARCH.
COLUMN SCHEDULE
850

0
15
4-20 + H.L.B

4-16

10 @ 75 C/C AT CONFINING ZONE REST 8 @ 150 C/C COMBINED FOOTING SCHEDULE


300
300X500 GRADE OF CONCRETE-M25
500
ALL COL. SIZE ALONG SHORTER ALONG LONGER
FDN. d D DIRECTION DIRECTION
MKD. a b (e) (f) SECTION C-C
SPACING SHALL BE AS PER BEAM SCHEDULE

G.A AT 1ST FLOOR LEVEL G.A AT 3RD FLOOR LEVEL


G.A AT 2ND FLOOR LEVEL

PROJECT:-
CONSTRUCTION OF OFFICE BUILDING (G+III) OF BIRSINGHA
DEVELOPEMENT AUTHORITY AT GHATAL S.D.O PREMISES,
MOUZA-KONNAGAR, J.L. NO-147, GHATAL, PASCHIM MEDINIPUR

ARCHITECTS & CONSULTANTS :


MONDAL ENTERPRISE BEHALA, KOLKATA 700060.
CONTACT NO: 8888369350

DRAWN BY- RKM DATE -30.08.2022 SHEET NO. - 01


CHECKED BY - SB SCALE - 1:100, 1:25
JOB NO.
DRG.NO.
G.A AT FOUNDATION G.A AT TIE BEAM G.A AT ROOF LEVEL STATUS TENDER APPROVAL CORPORATION