B REINFORCEMENT
COLUMN COLUMN VERTICAL
LATERAL TIES E BEAM SIZE
MKD. SIZE REINFORCEMENT STIRRUP 10-150 C/C
300
A 250X350 TB
75
M SUPPORT SPAN P.L E.G.L.
C - 1,4,9,10,13, 300 X 450 10 - 16 Ø 8 mm Ø@150mm c/c. MKD. SUPPORT SPAN
TOP BOTTOM TOP BOTTOM 250 BK. WALL
14,19,22. .
450
[ 2sets, 1link] B1 250 X 500 6 - 16 Ø 3 - 16 Ø 3 - 16 Ø L L
IN BETWEEN
6 - 16 Ø 2 -8 mm Ø @150 mm c/c. 2 -8 mm Ø @225 mm c/c.
TB & FB
- DO - 8-150 C/C
1350
1500
B2 250 X 500 5 - 16 Ø 3 - 16 Ø 3 - 16 Ø 6 - 16 Ø - DO -
500
300 2 - 20 Ø+ - DO - 12mm @
B3 250 X 500 3 - 16 Ø 3 - 16 Ø 2-20Ø+4-16Ø - DO - 10-150 C/C
650
4 - 16 Ø 200
- DO - 200mm c/c
C - 8,12,15 . 300 X 500 4 - 20 Ø + 6 - 16 Ø - DO - B 250 X 500 6 - 16 Ø 3 - 16 Ø 6 - 16 Ø 3 - 16 Ø - DO - 200
b/w
500
TB 250 X 350 4 - 16 Ø 4 - 16 Ø L L 75
2 - 16 Ø 2 - 16 Ø 2 -8 mm Ø @200 mm c/c. 2 -8 mm Ø @250 mm c/c. 75
300 COMPACT YELLOW SAND
* SCHEDULE OF FOUNDATION BEAM * 12-150 C/C FILLING
300 B REINFORCEMENT 2300
C- 2,5,11,16,20 . 300 X 550 10 - 20 Ø E BEAM SIZE 300 COMPACT YELLOW SAND
- DO - STIRRUP FILLING
A
75 th. C.C
550
M SUPPORT SPAN
MKD. SUPPORT SPAN 75 th. B.F.S
TOP BOTTOM TOP BOTTOM 12 mm@ 100mm TYP. SEC OF CONTINUOUS STRIP
L
300 FB1 500 X 650 5 - 16 Ø 10 - 16 Ø 8 - 16 Ø 5 - 16 Ø 4L -8 mm Ø @100 mm c/c. 4 -8 mm Ø @175 mm c/c. c/c b/w FOOTING
C- 3,6,7,17,18, 300 X 550 12 - 20 Ø 8 mm Ø@150mm c/c.
FB2 500 X 650 5 - 16 Ø 7 - 16 Ø 10 - 16 Ø 5 - 16 Ø - DO - - DO -
SECTIONAL ELEVATION OF LIFT SCALE :- 1:50
21 . FB3 500 X 650 5 - 16 Ø 5 - 16 Ø 5 - 16 Ø 5 - 16 Ø - DO - - DO -
[ 2sets, 2link]
550
250 1500 4085 1500
C- SC 250 X 400 8 - 16 Ø
(from FB to TB) .
PROPOSED FOUR STORIED RESIDENTIAL BUILDING
FB1
400
1500
1500
FB2
8 mm Ø @ 175 mm c/c 8 mm Ø @ 150 mm c/c
C9 PLAN OF SRI SHRI BHAGWAN PANDEY & SMT. INDU
FB1
* SCHEDULE OF SLAB *
PANDEY AT VILL:-SUSUWAHI, P.O.:- ASHOK PURAM
FB1
110
2500
1950
REINFORCEMENT LIFT
SLAB THK. C12 1300X
ALONG SHORTER AXIS
MKD. IN
mm SUPPORT SPAN
ALONG LONGER AXIS
SUPPORT SPAN 8 mm Ø @ 175 mm c/c
1650
FB2 DAFI , P.S.:-LANKA ,DIST:-VARANASI, ARAJEE:-714,
FB1
TOP BOTTOM BOTTOM TOP BOTTOM BOTTOM 8 mm Ø @ 150 mm c/c C13 KHATA NO:-1087.
1500
1500
S1 130 10 Ø @150c/c upto L/4 10 Ø @150 c/c 10 Ø @150 c/c 8 Ø @ 175 c/c upto L/4 8 Ø @ 175 C/C 8 Ø @175 C/C COL. COL.
FB1
S2 110 8 Ø @150c/c upto L/4 8 Ø @150 c/c 8 Ø @150 c/c 8 Ø @ 175 c/c upto L/4 8 Ø @ 175 C/C 8 Ø @175 C/C L STRUCTURAL DRAWING
1500 4085 1500
S3 130 10 Ø @150c/c althrough 8 Ø @150 c/c _ 8 Ø @ 150 c/c althrough 8 Ø @ 150 C/C _
SECTION OF SLAB (S1) OWNER'S SIGNATURE
DETAILS OF FOUNDATION OF LIFT +
COL. 9-12-13
6-16 Ø 3 - 16 Ø
* SCHEDULE OF STAIR CASE * 165 mm.THK.
165 mm.THK. R.C.C. SLAB
THICKNESS OF WAIST SLAB = 175 mm.
WAIST SLAB
THICKNESS OF LANDING SLAB = 175 mm.
500
MAIN REINFORCEMENT = 12 mm.Ø @ 150 mm.c/c 12 mm.Ø@150 mm.c/c 2 L -8 Ø@150c/c. 2L - 8 Ø @ 225c/c. 1. SRI SHRI BHAGWAN PANDEY 2. SMT. INDU PANDEY
DISTRIBUTION BAR = 8 mm. Ø @ 150 mm. c /c. 8 mm.Ø @150 mm.c/c 3 - 16 Ø 6-16 Ø
12 mm.Ø@150 mm.c/c 250 250
AT SUPPORT AT SPAN
B2
FB1
3624
3624
3624
FB1
TB
B3
B3
B3
FB2
TB
S1
TB
B1
4700
SC
4700
4700
S1
TB
S2 N O T E S
FB3
FB1 FB1
C6 C6 C7 C5 C6 C7 1. ALL DIMENSIONS ARE IN m.m.
C5 C7 2 C5 2
TB TB B B1 2. GRADE OF CONCRETE M-20 .
FB2 B1
C8 TB B2 3. GRADE OF REINFORCEMENT Fe - 500 .
C8 C8
3 3 4. NET SAFE BEARING CAPACITY OF
FB1
TB
FB1
FB3
B3
B3
SOIL HAS BEEN CONSIDERED 9.0 T / SQM. FOR
1725
S2
4051
FB1
1725
1725
4051
4051
TB
S2
TB
B3
CONTINEOUS STRIP FOOTING .
TB
B1
FB2 FB2 S1
C9 C10 B2 C10
TB C9 C10 4 C9 4
FB1
B4(HLB)
FB1
FB3
TB TB B
2500
TB
2500
5 LIFT LIFT
TB
B3
C11 C12 1300X 1300X 1300X
FB2 1650 C12 1650 C11 C12 1650 6. CLEAR COVER :-
FB2 FB2 FOUNDATION - 75 MM ,
C14
C13 C14 6 C14 6
FB1
TB B2 BEAM - 25 MM ,
4050
TB
4050
4050
1725
FB3
B1
FB1
TB
1725
1725
B3
S1
TB
S2 SLAB - 15 MM ,
TB
B3
C15 SECTOR OF REINFORCEMENT .
C15 C15 9
FB2 B2 8. BEAM REINFORCEMENT (EXTRA) :
FB1 FB1 C16 C17 C18 B
C16 AT SUPPORT : 0.3 L FROM SUPPORT
C18 7 7
FB3
4693
4693
TB
SC
B3
S2 S1
SOMNATH SANYAL.
FB1
FB1
FB1
B1
3617
TB
FB2
3617
3617
TB
B3
S1
TB
B3
FB3