CAPPING BEAM
1000
75
APPROVED
terminated in
D
capping beam.
Extend the last bar
till the toe. RUBBER WATERSTOP
EXCAVATION FACE
SECTION A - A
Remove 1 bar BASE SLAB
Include D in the
table
TABLE 1 : QUANTITY TAKE-OFF FOR DIAPHRAGM WALL, CAPPING BEAM & SKIN WALL
DIAPHRAGM WALL CAPPING BEAM SKIN WALL
LOCATION REBAR VOLUME CONCRETE REBAR VOLUME CONCRETE REBAR VOLUME CONCRETE
3 3 3
(TONNAGE) VOLUME (m ) (TONNAGE) VOLUME (m ) (TONNAGE) VOLUME (m )
W D
5800/2800
EXCAVATION FACE LATERAL SECTION