You are on page 1of 1

SCHEDULE OF COLUMN (DESIGNED FOR G+2 = 3 SLAB)

COLUMN SIZE STEEL


01
LATERAL TIES / RINGS SHAPE & ARRANGEMENT OF TIES
GROUP COLUMN NOS. R/F SKETCH
CONTINUOUS STRAP BEAM CONNECTING FOOTING TO FOOTING B D NOS. - DIA ( Ends L/4 & Mid zone )
300XDEPTH OF FOOTING, 3-16MM AT TOP & BOTTOM
a
RINGS, 08@100mm +
CG1 C13,C14 230 380 08 - 12 dia 8 mm @ 125 / 175 c/c
b
Alternate Ring details
12 16 a
04 - 16 dia + +
C13 230X380 C14 230X380 1200 CG2 C9,C12 230 380 8 mm @ 125 / 175 c/c b
02 - 12 dia Alternate Ring details
Beam Beam Beam
16 a
+
1200

1200

Beam
F1 1500 CG3 C10 230 380 06- 16 dia 8 mm @ 125 / 175 c/c
F1 b

2200
1500 1500 C12 230X380 Alternate Ring details

1800
COMPOUND TOP LEV EL ONLY

a
C11 230X450 +
CG4 C3,C4,C5,C7,C8 230 450 08 - 16 dia 8 mm @ 125 / 175 c/c
ALL CC COLUMNS ARE UPTO

Beam
b
F6 F2 Alternate Ring details
C9 230X380 F5 12 16 a
+
CG5 C11 230 450 04 - 16 dia +
8 mm @ 100 / 150 c/c
1350
1200

F2 04 - 12 dia b
Alternate Ring details
2200 1500 a
+
CG6 C6 150 530 08 - 16 dia 8 mm @ 125 / 175 c/c
b
C10 230X380 Alternate Ring details
a
+
CG7 C1,C2 300 600 12 - 16 dia 8 mm @ 100 / 150 c/c
b
Alternate Ring details
C7 230X450 CC1 TO CC8
CG8 04 - 12 dia 8 mm @ 100 / 150 c/c

Beam
1500 230 300
1350 C8 230X450 (Upto compound top only) Ring details Throughout
1200

1500

1800
F2
CONTINUOUS STRAP BEAM CONNECTING FOOTING TO FOOTING

2200 SCHEDULE OF FOOTING (DESIGNED FOR G+2=3 SLAB )

Beam
F5
C6 150X530 F7
BOTTOM FACE STEEL TOP FACE STEEL
300XDEPTH OF FOOTING, 3-16MM AT TOP & BOTTOM

FOOTING COLUMN PCC RCC SIZE DEPTH


SIZE REMARKS
GROUP NOS. (LXB) (D ) ALONG SHORT ALONG LONG ALONG SHORT ALONG LONG
( L1 X B1 )
ECCENTRIC
1350 F1 C13,C14 1700 x 1400 1500 x 1200 450 10 mm @ 150 mm c/c 10 mm @ 150 mm c/c 10 mm @ 150 mm c/c 10 mm @ 150 mm c/c
Beam

BOX FOOTING
F2
1500

ECCENTRIC
1200

C5 230X450 CC5+C4, CC6+C6


F2 2300 x 1400 2200 x 1200 500 10 mm @ 150 mm c/c 10 mm @ 175 mm c/c 10 mm @ 150 mm c/c 10 mm @ 125 mm c/c BOX FOOTING
CC7+C9, CC8+C12
2200
Beam

F5
RINGS, 08@100mm

AS SHOWN + ECCENTRIC
F3 CC1+C1 AS SHOWN 600 10 mm @ 100 mm c/c 10 mm @ 125 mm c/c 10 mm @ 100 mm c/c 10 mm @ 125 mm c/c
C4 230X450 4" ALL SIDES BOX FOOTING
ECCENTRIC
Beam

1950 1800 C3 230X450 F4 CC4+C3 3400 x 1400 3200 x 1200 450 10 mm @ 150 mm c/c 10 mm @ 150 mm c/c 10 mm @ 150 mm c/c 10 mm @ 150 mm c/c
BOX FOOTING
Beam

F3 1200
F8 FULL
F4 F5 C5,C7 1700 x 1550 1500 x 1350 500 10 mm @ 125 mm c/c 10 mm @ 125 mm c/c - -
2400

2100

BOX FOOTING
FULL
C1 300X600 F6 C11 2000 x 1700 1800 x 1500 600 10 mm @ 100 mm c/c 10 mm @ 100 mm c/c - - BOX FOOTING
3200

C2 300X600 ECCENTRIC
Beam

Beam

1050 F7 10 mm @ 100 mm c/c 10 mm @ 175 mm c/c 10 mm @ 100 mm c/c 10 mm @ 175 mm c/c


C8 2000 x 1700 1800 x 1500 500 BOX FOOTING
FULL
1200

900 900
F8 C2 2300 x 2000 2100 x 1800 600 10 mm @ 100 mm c/c 10 mm @ 100 mm c/c 10 mm @ 350 mm c/c 10 mm @ 350 mm c/c
F9 F9 BOX FOOTING
600 600
ECCENTRIC
F9 CC2,CC3 1100 x 800 900 x 600 350 08 mm @ 150 mm c/c 08 mm @ 150 mm c/c 08 mm @ 150 mm c/c 08 mm @ 150 mm c/c
900 1 BOX FOOTING
16'-72" IMPORTANT NOTES :-
GL
Main steel as 1. All work shall be strictly executed as per the drawing.
STRUCTURAL LAYOUT OF COLUMNS & FOOTINGS Chimta bars BEAM 2. Structure is designed for G+2 (3 SLABS) only.
Column 300 X depth of
UP TO HARD STRATA

3. Concrete Grade M20 and Steel Fe500 shall be used.

150
footing
4. Load of Bricks for partition walls are considered for design.
(Min. 1.8m)

First Link Position


At top 5. Take permission from structural engineer before concreting at site.
NOTE : FOUNDATION IS DESIGNED AS PER S.B.C. 300 kN/m2, MUST BE 3 Nos 16 dia
6. Clear Cover to R/F bars shall be - Column 40mm , Footings 50mm
CHECKED AND VERIFIED AT SITE. Stirrups
End bent

7. Developement/Lap length shall be used as 50 times dia of bar.


100mm

450 D 08mm @100mm c/c


DEPTH OF FOUNDATION SHOULD BE MIN. 1.8M OR UP TO HARD STRATA. 100 mm 8. Stripping time of formwork Shall be as per I.S.456-2000.
100MM THICK PCC IS COMPULSORY BELOW ALL FOOTINGS. PCC = 100 mm Thk. D 9. False work/ Shuttering Stability is responsibility of contractor.
450 10. Live load considered over these slab is 2.25 kN/m2
Steel R/F both ways at Bottom 100mm 11. If any Special Loads are there kindly inform to structural engineer before applying.
TYP. SECTION OF BOX FOOTING
Development Length (Ld=50*d) : PCC
=100mm THK.
12. Any descripency shall be asked and discussed to Structural Engineer.
Main steel as
13. Structure is designed only for Gravity Loads.
BAR DIAMETER MIN. LAP LENGTH Chimta bars Distribution 3 Nos 16 dia TITLE
10 mm 500 mm Along Short steel at Bottom
OF THE STRUCTURAL SCHEDULE OF
Along long
SHEET COLUMN FOOTING
12 mm 600 mm SECTION X-X OF ONE SIDE BOX FOOTING

16 mm 800 mm
PCC TITLE PROPOSED CONSTRUCTION OF

Beam
20 mm 1000 mm PROJECTION
PCC OF THE
RESIDENTIAL BUILDING
L

PROJECTION PROJECT
FOR MR. SAMEER

L
RCC
PROJECTION RCC
STRUCTURAL DYNEEMA ENGINEERING PVT.LTD.

Beam
PROJECTION
100mm CONSULTANT An ISO 9001:2015 COMPONY
ALL AROUND 100mm
OFFICE F2, F3, KS EMPIRE, BYPASS, AURANGABAD

TYPICAL RING / STIRRUP


B
B
TYP. PLAN OF BOX FOOTING PLAN OF ONE SIDE BOX FOOTING DATE 17.10.2023 REVISIONS R0