Professional Documents
Culture Documents
COLUMN FESSIO
COLUMN P
RO N
A
REGISTERED CIVIL ENGINEER DATE L
COLUMN COLUMN D
E
R
E
N
E
G
R E G IS T
IN E E R
No.
PLANS APPROVAL DATE
Exp.
S
T
OG shall not be responsible for the accuracy or A
TE IA
N
completeness of scanned copies of this plan sheet. OF FOR
CALI
The Registered Civil Engineer for the project is responsible for the selection
and proper application of the component design and any modifications shown.
"
-0
4’ "
-0
4’ S
NU N
MI LUM
G
CO SIN
CA TH LEGEND:
ID
W
1’-0" 1’-0" 1’-0" 1’-0"
COLUMN COLUMN
Indicates existing structure
4’-0" 4’-0"
COLUMN
COLUMN GP OR FS
OG OG
TIE ROD TIE ROD
FS PAVEMENT
SEE "ROAD PLAN"
EXISTING CURB, SIDEWALK AND OG SURFACE
BARRIER TO BE REMOVED AND TIE ROD TIE ROD
REPLACED. SEE "ROAD PLANS" PAVEMENT
FS
FOR DETAILS SURFACE
OG OG
GP BASE
MATERIAL
6"
6"
Min
Min
GP MATERIAL
TIE ROD TIE ROD
1’-0" 1’-0"
BRIDGE NO.
BRIDGE STANDARD DETAILS STATE OF
The components of the Bridge Standard DIVISION OF
xs7-030 July 2014 Details have been prepared under the
responsible charge of the Technical Owner,
CALIFORNIA POST MILE
ENGINEERING SERVICES
FILE NO. APPROVAL DATE
a registered civil engineer in the State
of California DEPARTMENT OF TRANSPORTATION LIMITS OF PAYMENT FOR EXCAVATION AND BACKFILL
REVISION DATES SHEET OF
Refer to: http://www.dot.ca.gov/hq/esc/techpubs/manual/bridgemanuals/bridge-standard-detail- FILE => xs7-030.dgn ORIGINAL SCALE IN INCHES UNIT: DISREGARD PRINTS BEARING
sheets/index.html FOR REDUCED PLANS EARLIER REVISION DATES
USERNAME => s136236 TIME PLOTTED => 07:27 DATE PLOTTED => 12-JUL-2016 0 1 2 3 PROJECT NUMBER & PHASE: CONTRACT NO.: 4-14-14 7-8-16