You are on page 1of 1

3602 3566 3300 3598 3634

1100 1100 1075 1075 1000 1000 1050 1050 1100 1100

3-20 2-20 3-20 3-20 2-20 3-20 3-20 2-20 3-20 3-20 2-20 3-20 3-20 2-20 3-20

3-16 3-16 3-16 3-16 3-16

50 1100 2L-8 @ 150 C/C 1100 50 50 1100 2L-8 @ 150 C/C 1100 50 50 1000 2L-8 @ 150 C/C 1000 50 50 1100 2L-8 @ 150 C/C 1100 50 50 1100 2L-8 @ 150 C/C 1100 50
2L-8 @ 100 C/C B1(300X500) 2L-8 @ 100 C/C 2L-8 @ 100 C/C B1(300X500) 2L-8 @ 100 C/C 2L-8 @ 100 C/C B1(300X500) 2L-8 @ 100 C/C 2L-8 @ 100 C/C B1(300X500) 2L-8 @ 100 C/C 2L-8 @ 100 C/C B1(300X500) 2L-8 @ 100 C/C

DETAILS OF FLOOR BEAM MKD. B1,B1,B1,B1 & B1 ACROSS COLUMN C13,C134,C15,C16,C17 & C18.

TYPICAL REINFORCEMENT CURTAILMENT DETAILS OF BEAM


FLOOR BEAM SCHEDULE

BEAM BEAM SIZE STIRRUPS


SUPPORT SPAN
MARKED
WIDE DEPTH TOP BOTTOM TOP BOTTOM SUPPORT SPAN

B-1 300 500 3-20 3-16 2-20 3-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C
4-20 2-16 4-20 2-16
B-2 300 500 2L-8 @ 100 C/C 2L-8 @ 100 C/C

B-3 300 500 4-20 3-16 2-20 3-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C

B-4 300 500 2-16 2-16 2-16 3-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C
S2 S2 S2 S2
B-1A 300 400 2-16 2-16 2-16 2-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C

HLB 300 500 3-16 3-16 2-16 3-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C
S2
B-5 300 400 2-16 + 2-16 2L-8 @ 100 C/C 2L-8 @ 150 C/C
2-16 2-16
1-12

PARGOLA 300 500 2-16 + 2L-8 @ 100 C/C 2L-8 @ 150 C/C
2-20 2-16 2-20
BEAM 1-12

S2 S2 S2 S2
S2
SCHEDULE OF R.C.C. SLAB
R E I N F O R C E M E N T
SLAB SLAB SHORTER SPAN LONGER SPAN
MKD. THK.
SUPPORT(TOP) SPAN (BOT.) SUPPORT(TOP) SPAN (BOT.)
S1 125 MM. 8 @ 200 C/C 8 @ 200 C/C 8 @ 200 C/C 8 @ 200 C/C
S2 S2 S2 125 MM. 8 @ 150 C/C 8 @ 150 C/C 8 @ 150 C/C 8 @ 200 C/C
S2 S2 S2
S3 150 MM. 8 @ 150 C/C 8 @ 150 C/C 8 @ 150 C/C 8 @ 200 C/C SECTION 1 - 1
H G

S1 S1 S1 S1 S1

N
G.A AT ROOF LEVEL

S1 S1

S1 S2 S2 S2
S2 S2 S2 S2
S2 S2 S2
S2 S2

S1 S1

S1 S1 S2
S3
S2 S2
S2 S2 S2 S2
S2 S2
S2 S2 S2

S2 PROJECT:-
S2
CONSTRUCTION OF OFFICE BUILDING (G+III) OF BIRSINGHA
DEVELOPEMENT AUTHORITY AT GHATAL S.D.O PREMISES,
S2 MOUZA-KONNAGAR, J.L. NO-147, GHATAL, PASCHIM MEDINIPUR

S2 S2 S2 S2
S2 S2 S2 S2 S2
S2 S2 S2
S1 S1

S1

S1 S1 S1 S1 S1
S1 S1 S1 S1 S1
S1 S1 S1 S1 S1

DRAWN BY- RM DATE -07.09.2022 SHEET NO. - 03 OF 03


CHECKED BY -SB SCALE - 1:100, 1:25
JOB NO.
G.A AT 1ST FLOOR LEVEL
G.A AT 3RD FLOOR LEVEL DRG.NO.
G.A AT 2ND FLOOR LEVEL
STATUS TENDER APPROVAL CORPORATION

You might also like