You are on page 1of 1

KEY PLAN:

SCALE

1:200

GENERAL NOTES:-

FOOTING LAYOUT

FOOTING SCHEDULE:-

FOOTING SIZE FOOTING DEPTH FOOTING REINFORCEMENT


S.NO FOOTING

COMBINED WORK SHOP II - FOOTING LAYOUT & DETAILS


TYPE STEP-1 STEP-2 STEP-1 STEP-2 BOTTOM RODS TOP RODS
LENGTH - L1 BREADTH - B1 LENGTH - L2 BREADTH - B2 D1 D2 (BOTHWAYS) (BOTHWAYS)
1 DJJ1 3600 2600 2600 1850 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)

2 DJJ1a 4400 3575 2900 2475 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)

3 DJJ1c 3600 2600 2600 1850 400 400 16Y @ 150 C/C
(BASE LVL -3.60)

4 DJJ2 3600 2600 2600 1850 400 400 16Y @ 150 C/C -

5 DJJ2a 4400 3575 2900 2475 400 400 16Y @ 150 C/C -

-
6 DJJ3 2600 1500 - - 600 - 16Y @ 150 C/C
-
7 DJJ4 3000 2400 2000 1700 400 400 16Y @ 150 C/C

8 DJJ6 5200 4100 3300 2950 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)

9 DJJ7 5200 3150 3300 2050 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)

*NGL / FGL:-
1. BASE LVL FROM NGL - IF NGL LEVEL LESS THAN FGL LVL
2. BASE LVL FROM FGL - FOR NGL LEVEL HIGHER THAN FGL LVL

NO. REVISION DATE

REVISION LOG
PROJECT

CONSTRUCTION OF CRRC
BASE PHASE I
INDIA MANUFACTURING
DRAWING TITLE

COMBINED WORK SHOP II


TYPICAL SECTION OF FOOTING AT -2.0M LVL
FOOTING LAYOUT & DETAILS
TYPICAL SECTION OF FOOTING AT -3.0M / -3.6M LVL

OCEAN LIFESPACES PVT.LTD

DATE DESIGN APPROVED


NORTH
19.03.2021
DRAWN ARUN ARUN
NITHIN
DRAWING No. REV

WS-II / 1 R1

You might also like