Professional Documents
Culture Documents
SCALE
1:200
GENERAL NOTES:-
FOOTING LAYOUT
FOOTING SCHEDULE:-
2 DJJ1a 4400 3575 2900 2475 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)
3 DJJ1c 3600 2600 2600 1850 400 400 16Y @ 150 C/C
(BASE LVL -3.60)
4 DJJ2 3600 2600 2600 1850 400 400 16Y @ 150 C/C -
5 DJJ2a 4400 3575 2900 2475 400 400 16Y @ 150 C/C -
-
6 DJJ3 2600 1500 - - 600 - 16Y @ 150 C/C
-
7 DJJ4 3000 2400 2000 1700 400 400 16Y @ 150 C/C
8 DJJ6 5200 4100 3300 2950 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)
9 DJJ7 5200 3150 3300 2050 400 400 16Y @ 150 C/C -
(BASE LVL -3.00)
*NGL / FGL:-
1. BASE LVL FROM NGL - IF NGL LEVEL LESS THAN FGL LVL
2. BASE LVL FROM FGL - FOR NGL LEVEL HIGHER THAN FGL LVL
REVISION LOG
PROJECT
CONSTRUCTION OF CRRC
BASE PHASE I
INDIA MANUFACTURING
DRAWING TITLE
WS-II / 1 R1