ROOF DECK BEAM SCHEDULE

1 2 3 4
3770 3920 3770

BEAM SCHEDULE (C21:Fy414) (LEVEL: ROOF DECK)

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


B1 B2 B3 SFR DIAGONAL REMARKS
A NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
C9 C13
C8 C14 B1,B2,B3 300 500 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 11-2L-#10@100 C/C 8-2L-#10@150 C/C 11-2L-#10@100 C/C - - -

B4,B5,B6 250 300 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 11-2L-#10@125 C/C 11-2L-#10@100 C/C 13-2L-#10@100 C/C - - -
B4 B5 B6
B7 300 500 2-#20 3-#20 3-#20 3-#20 3-#20 3-#20 11-2L-#10@100 C/C 9-2L-#10@150 C/C 11-2L-#10@100 C/C - - -
+ +

B16

B18
3-#20 3-#20

4500

B14

B20
B8 300 500 3-#20 3-#20 3-#20 3-#20 3-#20 3-#20 11-2L-#10@100 C/C 12-2L-#10@125 C/C 11-2L-#10@100 C/C - - -
+ +
3-#20 3-#20
+
2-#20

B9 300 500 3-#20 2-#20 2-#20 3-#20 3-#20 3-#20 11-2L-#10@100 C/C 9-2L-#10@150 C/C 11-2L-#10@100 C/C - - -
+
B7 B8 B9 3-#20
+
B 2-#20
C15 C18 C16 C17
B10,B11,B12 300 500 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 7-2L-#10@200 C/C 7-2L-#10@150 C/C 9-2L-#10@150 C/C - - -
1850

B15

B17

B19
B13

B13,B19 300 500 2-#20 2-#20 2-#20 3-#20 3-#20 3-#20 6-2L-#10@150 C/C - 6-2L-#10@150 C/C - - CANTILEVERED
+ + +
B10 B11 B12 2-#20 2-#20 2-#20
C B14,B20 300 500 2-#20 2-#20 3-#20 3-#20 3-#20 3-#20 8-2L-#10@150 C/C 10-2L-#10@150 C/C 8-2L-#10@150 C/C 1-#16EF - -
+
2-#20

ROOF DECK FRAMING PLAN B15 300 500 2-#20 2-#20 2-#20 3-#20 3-#20 3-#20 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - - CANTILEVERED

B16 300 500 2-#20 2-#20 2-#20 3-#20 3-#20 3-#20 11-2L-#10@100 C/C 13-2L-#10@150 C/C 11-2L-#10@100 C/C - - -
+
2-#20

B17 300 500 2-#20 2-#20 2-#20 3-#20 3-#20 3-#20 5-2L-#10@150 C/C 3-2L-#10@150 C/C 5-2L-#10@150 C/C - - CANTILEVERED
+ + +
2-#20 2-#20 2-#20

B18 300 500 2-#20 2-#20 2-#20 3-#20 3-#20 3-#20 11-2L-#10@100 C/C 13-2L-#10@150 C/C 11-2L-#10@100 C/C - - -
+
2-#20

1 2 3 4
3770 3920 3770

B1 B2 B3
A
C8
C9 C13
C14 ROOF BEAM SCHEDULE
B7

B8
4500

BEAM SCHEDULE (C21:Fy414) (LEVEL: ROOF APEX)


B6

B9

BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT SHEAR STIRRUPS


SFR DIAGONAL REMARKS
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
B4 B5
B B1,B2,B3 250 300 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 13-2L-#10@50 C/C 20-2L-#10@100 C/C 13-2L-#10@50 C/C - - -
C15 C18 C16 C17 B4 250 300 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 13-2L-#10@50 C/C 61-2L-#10@100 C/C 13-2L-#10@50 C/C - - -
1850

B5 250 300 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 13-2L-#10@50 C/C 22-2L-#10@100 C/C 13-2L-#10@50 C/C - - -

B6,B7,B8,B9 250 300 2-#20 2-#20 2-#20 2-#20 2-#20 2-#20 13-2L-#10@50 C/C 23-2L-#10@100 C/C 13-2L-#10@50 C/C - - -
C

ROOF FRAMING PLAN

1 2 3 4
3770 3920 3770

B1 B2 B3
A C9 C13
C8 C14
SLAB SCHEDULE
B4 B5 B6
4500

B14

B16
B12

B18

S4 S5 S6 SLAB SCHEDULE (C21 : FY276) (LEVEL : 2F)


BOTTOM REINFORCEMENT TOP REINFORCEMENT

SLAB SLAB ALONG SHORT SPAN ALONG LONG SPAN OVER LONG SUPPORT OVER SHORT SUPPORT REMARKS
B7 B8
B C16
MARKED THICKNESS DISTRIBUTION
C15 S7 S8 S9 C17 FULL LENGTH CURTAILED FULL LENGTH CURTAILED CONTINUOUS END CONTINUOUS END
SUPPORT SUPPORT SUPPORT SUPPORT
B13

B15
1850

B17
B11

B9 B10 S4, S5, S6 125 #10 @ 175 C/C --- #10 @ 175 C/C --- #10 @ 175 C/C #10 @ 175 C/C #10 @ 175 C/C #10 @ 175 C/C #10 @ 175 C/C ---
C S7, S8, S9 125 #10 @ 175 C/C --- #10 @ 175 C/C --- #10 @ 175 C/C #10 @ 175 C/C --- #10 @ 175 C/C #10 @ 175 C/C ---

SLAB DETAILS 2F TO RD

BUILDING PERMIT: APPROVED BY: DESIGNED BY: SHEET CONTENT SHEET NUMBER
PROJECT TITLE: INTELLECTUAL PROPERTY LAW
PROPOSED THREE (3) STOREY RENOVATION MR. ARLONE M. AQUINO
CADD BY:
THESE DRAWINGS AS INSTRUMENTS OF
SERVICE ARE THE PROPERTY &

REG. NO.: VALIDITY:


WITH ROOFDECK, 3 UNITS RESIDENCES OWNER DATE:
DOCUMENTS OF THE ARCHITECT AND IT
SHALL BE UNLAWFUL FOR ANY PERSON
TO DUPLICATE OR COPY THE SAME
PTR NO.: DATE: WITHOUT WRITTEN THE CONSENT OF THE
UPDATE:
TIN NO.: PLACE: LOCATION: 1575 ELPIDIO SANTOS ST. PALATIW PASIG CITY 1600 ADDRESS: ARCHITECT OR AUTHORS THEREOF