SCHEDULE OF BEAM (M20: Fe500)
O/ALL SIZE BOT. REINF. TOP REINF. STIRRUP SPACING
BEAM NOS. REMARKS
B2 B2 WIDTH DEPTH STR. BAR ANCHOR L. EXTRA R. EXTRA NEAR SUPPORT REST OF BEAM
B2 S1 S1 9" 15" 3 12 2 10 1 12 1 12 6 @ 6" c\c 6 @ 6" c\c
B1
9" 15" 4 12 2 10 2 12 2 12 6 @ 4" c\c 6 @ 6" c\c
B2
B2
B3 9" 15" 2 16 2 10 2 12 2 12 6 @ 4" c\c 6 @ 6" c\c
C11 B3 2 12
C10 S2 S2
C9 6" 15" 2 12 2 10 6 @ 6" c\c 6 @ 6" c\c
B4
B4
B3 B5 B2
B5 6" 15" 4 12 2 10 6 @ 6" c\c 6 @ 6" c\c
S2
B3 9" 15" 4 16 2 10 2 12 2 12 6 @ 4" c\c 6 @ 4" c\c
B6