1"

8'-82
SCHEDULE OF FLOOR BEAMS:- #16-6 NOS.
B7 B7a Floating column
BEAM BOTTOM STEEL TOP EXTRA TOP(4) EXTRA TOP(5) STIRRUPS
B6 camber 1" SIZE FC1( 9" x 15")
UP FULL (1) CURTAIL(2) (3) (CONTI. END) (DISCONTI. END)
NEAR SUPPORT AT REST Top bar must be
REMARK #25-8 NOS.
S4 DESIG.

B15
B14
elled in B8
B D NOS. # NOS. # NOS. # SUPPORT NOS. # AT END NOS. # NOS. # C/C # C/C
B8 B2 B2a

8
B1
S7 B1 9" 24" 2 16 - - 2 16 - - - - - - 8 6" 8 6" FLOOR BEAM
B10

S3

2'
B5 B5a camber 1" 3 20 4 25
1" B2 24" 24" - - - - - - - - 10 10 4" 10 6" 1'
8'-62 3 20 4 25
B4
B2a 24" 24" 3 20 4 25 from B2 and bars elled in B2- or weld
- - 10 4" 10 4" CANTILEVER BEAM #20-6 NOS.
B13 3 20 from B2 4 25 4 legged stirrups
S2

7
column C2

B1
B3 9" 24" 3 16 - - 4 20 - - - - - - 8 6" 8 6"
B11

S6 S4
B9

NOTE: Provide 1" camber to B2a


8'-2" B3a 9" 18" 3 16 from B3 4 20 from B3 - - - 8 4" 8 4" CANTILEVER BEAM
Grade of concrete should be M25
B3b 9" 24" 3 16 from B3 4 20 from B3 - - - 8 4" 8 4" CANTILEVER BEAM
B3a B3 B3b camber 1"
- - 2 12 - - - - DETAILS OF FLOATING COLUMN
B4 9" 18" 3 12 - - 8 6" 8 8"
B8

S1 10
S7 S1
B2
B12

B5 9" 24" 3 16 - - 4 20 - - - - - - 8 6" 8 6"


6

FC1: Floating column


B1

B2 B5a 9" 24" 3 16 from B5 4 20 from B5 - - - 8 4" 8 4" CANTILEVER BEAM


S5
a Size: 9" x 15"
camber 1" B6 9" 18" 2 12 1 12 2 16 - - - - - - 10 8 6" 8 8" Vertical Steel: 6- #16
B1 FLOATING COLUMN 4 16 Stirrups: #8@8"
B7 9" 21" 2 16 - - - - - - - - 8 6" 8 8"
FC1
B7a 9" 21" 2 16 from B7 4 16 from B7 - - - 8 6" 8 6" CANTILEVER BEAM
Remark: Floating on B2a
RCC KEY PLAN AT FIRST FLOOR LVL
(ABOVE GROUND FLOOR) B8 9" 24" 3 20 - - 3 20 - - - - - - 8 4" 8 4"

SCHEDULE OF SLABS:- B9 9" 18" 2 12 - - 2 10 B9-B10 2 12 - - - 10 8 6" 8 8"

SLAB THICK. DISTRIBUTION B10 9" 18" 2 12 1 12 2 10 - - - B10 1 12 10 8 6" 8 8"


MAIN STEEL REMARK
STEEL
B11 6" 18" 2 12 - - 2 10 - - - - - - 8 8" 8 8"
S1 5" # 10 @ 6" C/C # 8 @ 8" C/C ONE WAY SLAB
B12 9" 24" 2 16 - - 2 16 - - - - - - 10 8 6" 8 8"
S2 5" # 10 @ 7" C/C # 10 @ 7" C/C TWO WAY SLAB
B13 9" 18" 2 16 1 12 2 10 B13-B14 2 16 - - - 10 8 6" 8 8"
S3 6" # 8 @ 7" C/C # 8 @ 8" C/C TWO WAY SLAB
B14 9" 15" 2 12 - - 2 16 - - - - - - 8 8" 8 8"
S4 5" # 8 @ 6" C/C # 8 @ 9" C/C ONE WAY SLAB
B15 9" 15" 3 12 - - 2 12 - - - - - - 8 6" 8 6"
#8 @ 8" C/C # 8 @ 8" C/C ONE WAY SLAB
S5 5" B16 9" 18" 2 12 1 12 2 10 B16-B17 2 12 - - - 10 8 6" 8 8"
Top/Bottom Top/Bottom no bent up NOTE:
#8 @ 4" C/C ONE WAY SLAB A) DO NOT CAST ANY R.C.C. WORK UNLESS IT IS CHECKED
S6 5" # 8 @ 8" C/C B17 9" 18" 2 12 2 12 2 10 B17-B18 2 12 - - - 10 8 6" 8 8"
plain mesh sunk by 10" AND CONFIRMED BY CONCERNED AUTHORITY.

B18 9" 18" 2 12 - - - - - - - - 8 6" 8 8" B) STRUCTURAL CONSULTANT WILL NOT RESPONSIBLE FOR QUALITY
# 8 @ 9" C/C CANTILEVER SLAB 2 10 10
S7 6" #10 @ 6" C/C OF CONCRETE, QUALITY OF MATERIALS USED FOR CONSTRUCTION,
alt. bar spring
POOR WORKMANSHIP, FAULTY CONSTRUCTION PROCEDURE, CRACKS
IN WALLS, SETTLEMENT OF BED CONCRETE.

L2 L1(BIGGER SPAN) L(CANT)

L2/3 L 1/3 L 1/3 LX1.5


PROJECT:- RESIDENTIAL HOUSE

NOTE
300
1) USE CONCRETE MIX 'M-20' FOR ALL R.C.C. WORK CLIENT:-
2) USE CEMENT OF 43 GRADE. 2XD 2XD 2XD 2XD
2"
MR. SHIVAJI PATIL AND FAMILY, KOLHAPUR
0.1L1 0.1L1
3) USE 'TMT' STEEL OF Fe 500 GRADE. (TYP) (TYP)
STIRRUPS
STIRRUPS
CLEAR SPAN
TITLE OF SHEET:-

GROUND FLOOR TOP SLAB LVL RCC DETAILS


TYPICAL DETAIL OF CONTINUOUS FRAMING BEAM.

DATE: 06-07-2023 JOB NO: RS/23-15 REVISION :00

SHEET NO: 03 DRAWN BY: DAB CHECKED BY: ALB


NOTE: 6) CLEAR COVER TO MAIN REINFORCEMENT 9) FOR BEAMS, COLUMNS, SLABS LARGER DIA BARS SHALL BE
13) CONCRETE MIX QUALITY, SHUTTERING/DESHUTTERING, CURING IS
COLUMN FOOTING BEAM SLAB TOWARDS OUTER SURFACE / CORNER.
SOLELY CONTRACTOR'S RESPONSIBILITY DESIGN BY:-
1) ALL DIMENSIONS ARE IN INCH AND FEET 1.5" 2" 1" 3/4"
7) DEVELOPMENT/LAP LENGTH 10) REINFORCEMENT BARS SHALL BE BENT AS PER IS 2502:1963. AJAYKUMAR BHOSALE.
14) REFERENCE: IS 456:2000, IS13920:2016, IS 1893:2016
2) DO NOT SCALE THE DRG. REFER ONLY WRITTEN DIMENSIONS. B.E.(CIVIL), M.TECH(STRUCTURE), A.M.I.E.
(reg. no.AM3046748)
DIA. OF BAR #8 # 10 # 12 # 16 11) LAPS IN REINFORCEMENT SHALL BE STAGGERED SUCH THET NOT 15) OUR RESPONSIBILITY IS LIMITED TO SAFE AND SOUND DESIGN.
3) ALL REINFORCED CONCRETE SHALL BE CONFORMING TO IS
LENGTH MM 18" 24" 28" 36" MORE THAN 50% OF STEEL IS LAPPED AT ANY SECTION.
456:2000, IS 13920:2016, IS1893:2016. 16) THIS DRAWING IS NOT USED FOR EXECUTION UNLESS IT IS STAMPED BHUSHAN PATIL
4) ALL R.C.C. WORK IN M20 GRADE 8) DESHUTTERING PERIOD 12) REFER ARCHITECTURAL DRAWINGS FOR POSITIONS AND AND SIGNED BY ME. ARCHITECT:-
ENGG & CONTRACTOR
5) # DENOTES DIA. OF STEEL BAR OF GRADE FE-500. COLUMN FOOTING BEAM(bottom) SLAB DIMENSIONS OF OPENINGS IN WALLS AND COORDINATE WITH THOSE
CONFIRMING TO IS: 1786-85 (TEST CERTIFICATE REQD) 24 hrs 24 hrs 28 days 7 days
ON STRUCTURAL DRAWINGS.
A/P- ANAJE ,RADHANAGARI