Professional Documents
Culture Documents
L1/3 L2/3
BEAM SCHEDULE
110
BEAM DESIGNATION
GRAVEL FILL B H TOP BAR BOT BAR TOP BAR BOT BAR (Use 10mmØ Stirrups spaced from supports to C.L.)
EARTH SLAB DETAIL
FTB-1 FOOTING TIE BEAM 150 350 VERIFY 2D16 2D16 2D16 2D16 5 @ 50mm, 5 @ 100mm, REST @ 150mm O.C.
1D12 1D12 1D12 1D12
FTB-2 FOOTING TIE BEAM 200 350 VERIFY 2D16 2D16 2D16 2D16 5 @ 50mm, 5 @ 100mm, REST @ 150mm O.C.
A SOF ( SLAB ON FILL ) 1D12 1D12 1D12 1D12
FTB-3 FOOTING TIE BEAM 250 350 VERIFY 2D16 2D16 2D16 2D16 5 @ 50mm, 5 @ 100mm, REST @ 150mm O.C.
- SCALE NTS
1D12 1D12 1D12 1D12
RB-1 ROOF BEAM 150 350 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, 3@150mm REST @
2D16
1D12 1D12 200mm O.C.
RB-2 ROOF BEAM 200 350 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, 3@150mm REST @
2D16
1D12 1D12 200mm O.C.
LATERAL TIE RB-3 ROOF BEAM 250 350 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, 3@150mm REST @
2D16
1D12 1D12 200mm O.C.
LONGITUDINAL BAR LB LINTEL BEAM 150 300 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, REST @ 200mm O.C.
2D16
1D10 1D10
400
400
400
150
cc