CONTINUOUS BAR
@ 300MM O.C BOTH WAYS B BEAM DETAIL
- SCALE NTS

BEAM SCHEDULE
110

SIZE (mm) SPAN SUPPORT MIDSPAN SHEAR REINFORCEMENT


100

BEAM DESIGNATION
GRAVEL FILL B H TOP BAR BOT BAR TOP BAR BOT BAR (Use 10mmØ Stirrups spaced from supports to C.L.)
EARTH SLAB DETAIL
FTB-1 FOOTING TIE BEAM 150 350 VERIFY 2D16 2D16 2D16 2D16 5 @ 50mm, 5 @ 100mm, REST @ 150mm O.C.
1D12 1D12 1D12 1D12
FTB-2 FOOTING TIE BEAM 200 350 VERIFY 2D16 2D16 2D16 2D16 5 @ 50mm, 5 @ 100mm, REST @ 150mm O.C.
A SOF ( SLAB ON FILL ) 1D12 1D12 1D12 1D12
FTB-3 FOOTING TIE BEAM 250 350 VERIFY 2D16 2D16 2D16 2D16 5 @ 50mm, 5 @ 100mm, REST @ 150mm O.C.
- SCALE NTS
1D12 1D12 1D12 1D12
RB-1 ROOF BEAM 150 350 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, 3@150mm REST @
2D16
1D12 1D12 200mm O.C.
RB-2 ROOF BEAM 200 350 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, 3@150mm REST @
2D16
1D12 1D12 200mm O.C.
LATERAL TIE RB-3 ROOF BEAM 250 350 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, 3@150mm REST @
2D16
1D12 1D12 200mm O.C.
LONGITUDINAL BAR LB LINTEL BEAM 150 300 VERIFY 2D16 2D16 2D16 2 @ 50mm, 3 @ 100mm, REST @ 200mm O.C.
2D16
1D10 1D10

CONC. COVER 40mm 150 200 250 200

400

400

400

150
cc

16MM DIA REBAR


10MM DIA @ 200 O.C
C1 C2 C3 C4
COLUMN SCHEDULE
SHEAR REINFORCEMENT
(Use 10mm∅ Stirrups spaced from supports to C.L.)
MAIN BARS (2- SET OF LATERAL TIES)

C-1 5 @ 50mm, 5@ 75mm, 4 @ 100mm, REST @


8D16
150mm O.C.
C-2 5 @ 50mm, 5@ 75mm, 4 @ 100mm, REST @
8D16
150mm O.C.
C COLUMN DETAIL C-3 8D16
5 @ 50mm, 5@ 75mm, 4 @ 100mm, REST @
150mm O.C.
- SCALE NTS
FOR PERMIT
This drawing or print is a CADD DESIGN BY: NO.: REVISIONS: DATE: FILE NAME REFERENCE:
PROJECT TITLE: OWNER: SHEET CONTENT:
CONSULTANT: property of the architect and 1
ARJAY MERLE
PRIME PACIFIC CONSULTANT AND JOSHUA O. RAMISCAL such must not be copied,
reproduced and used as an SLAB ON FILL 2 PASTOR PAT TONDO
CHECKED BY:
PROJECT MANAGEMENT GROUP INC. CIVIL ENGINEER instrument for construction or
exhibited without their prior MESSIAH CHRISTIAN BAPTIST CHURCH PASTOR PAT TONDO
COLUMN DETAIL 3
ENGR. JOSHUA RAMISCAL COLUMN SCHEDULE 4 PROJECT NO.: SHEET NO.:
2nd/F, Emporio Bldg. Cor. Orense St. & Sgt Yabut Sts. notice and permission.All
Guadalupe Nuevo, Makati City 6000 Philippines PRC. NO. 0169495 DATE ISSUED 11/19/2020 drawings should be returned BLOOMING HILLS SUBD, OLIHADA ST. BARANGAY DOLORES, BEAM DETAIL 5
Tels.: (02) 412-6378 DATE: BLOOMING HILLS SUBD, OLIHADA ST. BARANGAY DOLORES,
upon request. TAYTAY RIZAL BEAM SCHEDULE
PTR. NO. 8498301 PLACE ISSUED MAKATI CITY
TAYTAY RIZAL 6 PPC-00-004 S-3
TIN NO. 756-584-704 RA 545
DECEMBER 11, 2020 7