Professional Documents
Culture Documents
WF
WF
FTB 200 350 16 3-TOP, 4-BOTT. 4-TOP, 3-BOTT. 3-TOP, 4-BOTT. 1@50, 5@ 100 REST @ 200 TO C.L.
WF WF
FTB
WF S-1 S-1 S-1
FTB
B1
B1
B1
B1
SCHEDULE OF SLAB REINFORCEMENT
FTB
FTB
C1-F1 C1-F1 C1-F1 C1-F1 SHORT SPAN(MM) LONG SPAN(MM) THICKNESS
FTB FTB FTB
C1
B1 B1
C1
B1
C1 MARK
3 3 TOP BOTTOM TOP TOP BOTTOM TOP
100
S-1 10 @0.20 10 @0.20 10 @0.20 10 @0.20 10 @0.20 10 @0.20
CB
WF CB
SCHEDULE OF FOOTING
FTB
FTB
FTB
FTB
B1
B1
B1
B1
S-1 S-1 S-1
CB
CB
DIMENSIONS(MM) REINFORCEMENTS EMBEDMENT DEPTH REMARKS
WF
MARK
OPEN
C1-F1
CB
FTB
C1-F1
FTB
C1-F1 C1-F1
C1
B1 B1 C1 B1
L W T ALONG "L" ALONG "W" m ISOLATED
FTB C1 B1 C1
2 2 F1 1200 1200 350 8-16 MM DIA. 8-16 MM DIA. 1.5
SLAB ON GRADE C2-F1 SUSPENDED SLAB
SCHEDULE OF COLUMN
WF
B1
B1
B1
B1
1OOMM THICK WITH
FTB
FTB
FTB
1OOMM THICK WITH
10MM DIA. RSB @ S-1 10MM DIA. RSB @ C2
400MM BOTHWAYS 400MM BOTHWAYS
OPEN
C1-F1 C1-F1
C1 COLUMN DIMENSION(MM) MAIN BAR TIES SPACING OF TIES
FTB
FTB FTB B1 PC B1 C1 B1
C1-F1
1 FTB
C2-F1
1 C1 B1 C2
MARK B D DIA. MM.
S-1
C1 250 450 8-16 mm 10 3@50, 8 @100 REST @ 200 TO C.L.
1' 1'
CB
FTB
FTB
B1
B1
CB
S-1
PC 200 300 6-16 mm 10
C2-F1 C2-F1
FTB C2 B1 C2
SCHEDULE OF WALL FOOTING
MARK DIMENSION(MM) LONG. BAR SHORT BAR
W T DIA. DIA.
1 FOUNDATION PLAN 2 SECOND FLOOR FRAMING PLAN WF 600 250 3-12 MM 12 MM DIA. SPACED @ 300 MM O.C.
S1 S1
C COLUMN
COLUMN
A' A B C D D' A' A B C D D' WL
100mm THK SLAB
W/2 W/2 ON GRADE
GROUND FFL
150
FGL
L/2
100mm THK
COLUMN
GRAVEL BASE
CL
D
FOOTING TIE BEAM
L
(WHERE OCCURS)
RB RB RB
4 4 BAR "A" (TRANSVERSE
L/2
T
100mm THK
BAR "B" GRAVEL BASE
BAR "B" (LONGITUDINAL BAR "A" VERIFY SOIL CONDITION
NOTE: UNDERNEATH. REPLACE
SOFT SOIL WITH
RB
RB
RB
RB
RB
RB
RB
STEEL COLUMN
(SEE SCHEDULE)
RB
RB
TOP BAR
RB
S-1
GENERAL : 12Ø
A. MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE CONCRETE HOLLOW BLOCKS :
REQUIREMENTS OF THE FOLLOWING BUILDING CODES. REINFORCEMENT AS TABULATED IN SCHEDULE SHALL BE PROVIDED UNLESS 150MM
CONF'T
1. ACI 318 - 89
ZONE
L1
1 CONSTRUCTION NOTES
OTHERWISE SPECIFIED IN THE PLAN . SEE SCHEDULE -1.
2. ASEP SEISMIC DESIGN GUIDE
3. NSCP - 2010
4. UBC 1997 CONCRETE WALLS :
100MM
B. ALL DRAWINGS SHALL NOT BE SCALED FOR CONSTRUCTION UNLESS OTHERWISE INDICATED IN THE PLANS , WALL REINFORCEMENT SHALL BEAM
S2
INTERMEDIATE ZONE
PURPOSES UNLESS OTHERWISE INDICATED. BE FOLLOWED AS TABULATED IN SCHEDULE -2. SEE SCHEDULE -2. 5-10MMØ BARS
Lo
SPACED AT 200 MM O.C.
C. FOR ALL OTHER REQUIREMENTS , REFER TO ARCHITECTURAL ,
SANITARY , ELECTRICAL AND MECHANICAL WORKING DRAWINGS. STRUCTURAL STEEL : 1 1
CONF'T
2. WELDING SHALL CONFORM TO AWS STANDARDS.
ZONE
L1
1. FOOTINGS ARE DESIGNED TO REST ON FIRM SUBGRADE
WITH MINIMUM BEARING CAPACITY OF 2,500 psf ) 3. FABRICATOR SHALL SUBMIT SHOP DRAWINGS FOR APPROVAL BY 1. ALL MILD STEEL REINFORCEMENT SHALL CONFORM TO ASTM A-1562 -2T
CONNECTION
2. NO FOOTING SHALL REST ON FILL. THE ENGINEER AND THE OWNER. AND DEFORMATIONS TO A-305-56 OR LATEST REVISIONS. (Fy = 40,000 Psi)
BEAM-COL
SEE NOTE
5-10MMØ BARS
D&E
3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL SPACED AT 200 MM O.C. 2. DEVELOPMENT LENGTH FOR ALL BARS SHALL BE A MINIMUM OF 40 BARS
BE 70 MM CLEAR FOR CONCRETE DEPOSITED AGAINST THE 2h 2h DIAMETERS UNLESS OTHERWISE SPECIFIED. h 500MM
Sh1/2
lb1 lb2
FORMWORK.
SEE NOTE
CONF'T
ZONE
L1
B&C
SEE NOTE A SEE NOTE A
INTERMEDIATE ZONE
DISTANCE (MINIMUM)
1 2 20MM
1. UNLESS OTHERWISE SPECIFIED , THE MINIMUM 28-DAY CYLINDER
SEE NOTE C
Lo
COMPRESSIVE STRENGTH ARE AS FOLLOWS : LAPS SEE
NOTE F
Sh2 LAP SEE
h
CALCULATED BOND NOTE E
FOOTINGS AND BEAMS ON GRADE 3,000 psi LENGTH BUT
COLUMNS 3,000 psi 40MM CLEAR DIST.
(MINIMUM) FOR 40MM CLEAR 30Ø OR 600MM
10
DISTANCE (MINIMUM)
SLABS , BEAMS AND GIRDERS 3,000 psi BEAMS & GIRDERS
0.2 Sh1
00
SEE NOTE - A SEE NOTE - A
CONF'T
ZONE
BEARING AND RETAINING WALLS 3,000 psi
L1
50MM
10
TRIMMERS MAY BE
BEDDED SLABS , CATCH BASINS AND SIDEWALK 2,500 psi DETAIL - 1
00
OMITTED WHERE
Sh
SEE NOTES 500MM
OPENING IS FRAMED NO LAPS ZONE SEE NOTE D 10MMØ TIES AT 150MM O.C.
TYPICAL BEAM-COLUMN 1 D,F&G 2 FOR ALL
2. ALL CONCRETE MUST BE DEPOSITED , VIBRATED AND CORED IN INTERCONNECTION C
BY BEAMS SEE NOTE D MINIMUM STEEL LAPS CALCULATED
SEE NOTE B LAP LENGTH
ACCORDANCE WITH ACI STANDARD 318-89. b BUT 300MM
END SPAN INTERNAL
3. STRIPPING FORMS AND SHORES SHALL BE AS FOLLOWS : NOTE :
2-16MMØ AT MINIMUM 1-16MMØ
SUPPORT SUPPORT
FOUNDATION 1 DAY A. STIRRUP SPACING IN PLASTIC HINGE ZONE OF LENGTH 2h EACH CORNER TOP & BOTTOM FOR SUPPLEMENTARY
COLUMNS & WALLS
BEAMS & GIRDERS
3 DAYS
21 DAYS
SHALL BE THE LEAST OF ; 1. D/4 2. 6Ø 3. 150MM.
B. Ø = DIAMETER OF MAIN LONGITUDINAL BAR FOR DISTANCE
SLABS 125MM THK.
AND OVER
CROSS TIES (SEE
NOTE H)
A. CURTAILMENT OF TOP BARS TO BE TENSION BOND LENGTH BEYOND THE POINT OF TYP. BEAM DEPRESSION DETAIL
OPENING h CONTRAFLEXURE BUT NOT LESS THAN lb/4 FROM SUPPORT , IF SOME BARS ARE
SLABS 17 DAYS UNDER CONSIDERATION IN TOP OR BOTTOM WHICHEVER IS HOOPS CURTAILED AT SHORTER DISTANCES AT LEAST A THIRD OF TOTAL STEEL MUST
4. CONCRETE SHALL BE DEPOSITED IN ITS FINAL POSITION WITHOUT SMALLER. HOOK SLAB EXTENDED TRIMMER BAR b/a > 10 EXTEND THIS DISTANCE.
REINFORCEMENT
SEGREGATION RE-HANDLING OR FLOWING. PLACING SHALL BE C. THIS STIRRUP SPACING CONTINUES WITHIN THE INTERMEDIATE OVER TRIMMER BAR
1000MM BEYOND SIDES b > 300MM
ZONE. OF OPENING OR AS FAR 1-1 B. THE AREA OF BOTTOM OF STEEL PROVIDED AT THE SUPPORTS MUST EQUAL AT
DONE PREFERABLY WITH BUGGIES , BUCKET OR WHEELBARROWS. AS POSSIBLE & HOOK.
135° (Ø) LEAST HALF THE AREA OF THE TOP STEEL AT THAT SECTION.
NO CHUTES WILL BE ALLOWED EXCEPT TO TRANSFER CONCRETE
FROM HOPPERS TO BUGGIES , WHEELBARROWS OR BUCKETS IN
SCHEDULE - 1 6Ø CRANK DETAIL
C. A MIN. OF 1/4 OF THE LARGER AMOUNT OF TOP STEEL REQUIRED AT EITHER END t
WHICH CASE THEY SHALL NOT EXCEED SIX (6.0) IN METER IN CONCRETE HOLLOW BLOCK REINFORCEMENT MUST CONTINUE FOR THE WHOLE LENGTH OF THE SPAN.
AGGREGATE LENGHT. NO DEPOSITING OF CONCRETE SHALL BE REINFORCEMENT
BLOCK NOTES PROVIDE EXTRA BAR ØM r = 2ØM (MILD STEEL)
ALLOWED WITHOUT THE USE OF VIBRATORS. UNLESS AUTHORIZED HORIZONTAL VERTICAL 4ØM (HT. STEEL) D. NO LAPS IN TOP & BOTTOM TO OCCUR WITHIN A DISTANCE OF 2h FROM FACE OF
THICK A. MINIMUM SPLICE AT LAP = 300MM (NOT SHOWN) PARALLEL
IN WRITING BY THE DESIGNERS AND ONLY FOR USUAL CONDITIONS 75 MM 10MM AT 600MM O.C. 10MM AT 600MM O.C.
B. PROVIDE RIGHT ANGLE REINF.
AT CORNERS 1000MM LONG.
TO SIDES OF EQUAL AREA
OF INTERRUPTED SLAB
1000
SUPPORT . TYP. SLAB CONSTRUCTION JOINT
WHERE VIBRATORS IS EXTREMELY DIFFICULT TO ACCOMPLISH. 100MM 10MM AT 600MM O.C. 10MM AT 600MM O.C. C. WHERE CHB WALLS ADJOINING COLS.
R.C. BEAMS. WALL DOWELS W/ SAME
REINFORCEMENT LESS DETAIL OF HOOP AND E. LAPS ARE TO BE KEPT TO A MINIMUM AND CRANKS IF REQUIRED TO BE AS FOR
AREA TRIMMER BARS.
BEAMS AND GIRDERS : 150MM
200MM
12MM AT 600MM O.C.
12MM AT 600MM O.C.
12MM AT 600MM O.C.
12MM AT 600MM O.C.
SIZE AS VERT. REINF. SHALL BE
PROVIDED.
TIE ANCHORAGE DIMENSIONS COLUMNS.
1. CAMBER ALL BEAMS AND GIRDERS AT LEAST 6.50 MM FOR EVERY DETAIL - 4 DETAIL - 5 F. IF h > 750MM PROVIDE EXTRA LONGITUDINAL BARS FOR 2/3 OF THE BEAM DEPTH
FROM THE TENSION FACE WITH SPACING > 250MM.
3.0 M. OF SPAN. SCHEDULE - 2
2. FOR TWO OR MORE LAYERS OF REINFORCING BARS USE SEPARATORS G. LAPS IN FRAMING BARS TO BE STAGGERED RELATIVE TO LAPS IN MAIN TOP AND
SPACED AT 1.0 M. O.C. AND IN NO CASE SHALL BE LESS THAN WALL REINFORCEMENT VERTICAL BOTTOM BARS.
REMARKS SECTION
TWO (2) SEPARATORS. THK. HORIZONTAL VERTICAL b
100MM 10MM AT 250MM O.C. 10MM AT 300MM O.C. HORIZONTAL & CENTER VERTICAL
BARS STAGGERED OUTSIDE. b b ANCHORAGE OUTSIDE
PANEL ZONE PQRS
3. NO SPLICE SHALL BE PERMITTED ON BEAMS AND GIRDERS WHERE 125MM 10MM AT 250MM O.C. 10MM AT 250MM O.C. - DO -
BOTH FACES HORIZONTAL
CRITICAL BENDING STRESSES IS OCCUR. TENSION SPLICE SO PERMI- 150MM 12MM AT 250MM O.C. 12MM AT 300MM O.C SHALL BE INSIDE.
P Q
175MM 12MM AT 200MM O.C. 12MM AT 250MM O.C. - DO -
TTED SHALL BE 60 DIAMETER FOR PLAIN BARS AND 40 DIAMETER BOTH FACES HORIZONTAL PLAN
FOR DEFORMED BARS. 200MM 12MM AT 300MM O.C. E.F. 12MM AT 300MM O.C. SHALL BE OUTSIDE.
7.
DISCONTINOUS EDGE ) AS SHOWN ON DETAIL-3.
PROVIDE SUPPLEMENTARY REINFORCEMENT AT SMALL UNFRAMED OPENING
FOR 6" CHB FOR 4" CHB
2 PERIMETER FENCE DETAIL 12MM , IF ØM>28MM
ØM = THE DIAMETER OF LONGITUDINAL BAR.
METER OR WIDTHS ON CENTER.
IN FLOOR SLABS AS SHOWN ON DETAIL-4. TYPICAL DETAIL OF LINTEL BEAM AND STIFFENER COLUMN S2 SEE DETAIL - 5. TYPICAL PIPE SLEEVE DETAIL
S-2