BEAM SCHEDULE (C21:Fy415) (GROUND BEAM) CONTINUATION OF BEAM SCHEDULE (C21:Fy415) (SECOND FLOOR) CONTINUATION OF BEAM SCHEDULE (C21:Fy415)

CONTINUATION OF BEAM SCHEDULE (C21:Fy415) (SECOND FLOOR) CONTINUATION OF BEAM SCHEDULE (C21:Fy415) (THIRD FLOOR)
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
SHEAR STIRRUPS SFR SHEAR STIRRUPS SFR SHEAR STIRRUPS SFR
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
B33 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B70 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B58 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF

B34 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B71 200 400 2-#16 2-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B61 200 400 2-#16 2-#16 3-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#10EF

B36 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B72 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B62 200 400 2-#16 3-#16 2-#16 3-#20 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
-
B37 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B73 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B67 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
-
B38 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B74 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B79 200 400 3-#16 2-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
+ + + +
2-#16 3-#16 3-#16 3-#16
B41 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B75 200 400 2-#16 2-#16 2-#16 3-#16 2-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
B80 200 400 3-#16 3-#16 3-#16 3-#16 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST@100 1-#16EF
B42 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B76 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF + +
- 3-#16 3-#16
B43 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B77 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 - B81 200 400 3-#16 3-#16 2-#16 3-#20 2-#20 3-#20 10MM SPACED 1@50, 4@80, REST@120 1-#12EF
+
B63 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - 2-#16
B78 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
- B82 200 400 2-#16 2-#16 2-#16 3-#20 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 -
B64 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B79 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 -
B65 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - - B83 200 450 3-#16 2-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 -
B92 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF + + + +
2-#16 3-#16 3-#16 3-#16
+ + +
B66 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B99 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - 2-#16 2-#16 2-#16

B67 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 - B102 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@120 1-#16EF B84 200 450 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#12EF
+ + + + +
2-#16 3-#16 3-#16 3-#16 3-#16
- + + + +
BEAM SCHEDULE (C21:Fy415) (UPPER GROUND FLOOR) B103 200 400 2-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 1-#12EF 2-#16 2-#16 2-#16 2-#16
B104 200 400 2-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 1-#12EF B85 200 400 2-#16 2-#16 3-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@100 1-#12EF
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
SHEAR STIRRUPS SFR B106 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B86 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 1-#12EF
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT B107 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@120 - B87 200 450 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#16EF
+ + + + +
B29 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 3-#16 2-#16 3-#16 3-#16 3-#16
B110 200 400 3-#16 2-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
+
B37 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#20 10MM SPACED 1@50, 4@80, REST @ 150 2-#16 B88 200 450 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
+
3-#16
B38 200 400 2-#16 3-#16 3-#16 2-#20 2-#20 2-#20 10MM SPACED 1@50, 4@80, REST @ 150 (GRID C-D) 1-#16EF B111 200 400 2-#16 3-#16 2-#16 3-#20 2-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
+ + B89 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
3-#16 2-#20 10MM SPACED 1@50, REST @ 100 (GRID D-E) 10MM SPACED 1@50, 4@80, REST@150
B112 200 400 2-#16 3-#16 2-#16 3-#20 3-#16 3-#16 1-#12EF
+
B39 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 2-#16 B90 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 -

B40 200 400 2-#16 3-#16 3-#16 2-#20 2-#20 2-#20 10MM SPACED 1@50, 4@80, REST @ 150 (GRID C-D) 1-#16EF B113 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B91 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
+ + -
3-#16 2-#16 10MM SPACED 1@50, REST @ 100 (GRID D-E) 10MM SPACED 1@50, 4@80, REST@150
B114 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 - B92 200 400 2-#16 3-#16 2-#16 3-#16 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST@120 1-#12EF
B42 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST @ 150 B115 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@120 1-#10EF B93 200 400 2-#16 3-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@120 1-#16EF
+
B43 250 450 2-#16 2-#16 2-#16 3-#16 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 2-#16
B116 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 1-#12EF
B44 250 450 2-#16 3-#16 3-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 (GRID C-D) 1-#16EF B94 200 400 3-#16 2-#16 3-#16 2-#20 2-#20 2-#20 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
+ + + - B117 200 400 3-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 2-#20EF + + + +
3-#16 2-#16 3-#20 10MM SPACED 1@50, REST @ 80 (GRID D-E) 2-#16 2-#20 2-#20 2-#20
+ + + +
3-#16 B118 200 400 3-#16 2-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@120 1-#16EF 2-#20 2-#20 2-#20
+ +
3-#16 3-#16
B45 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 - B95 250 450 3-#16 3-#16 3-#16 2-#20 2-#20 2-#20 10MM SPACED 1@50, 4@80, REST@100 1-#20EF
+ + + + +
B119 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 - 2-#16 3-#16 2-#20 2-#20 2-#20
B46 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF + + + +
3-#16 3-#16 2-#20 2-#16
B47 200 450 2-#20 2-#20 2-#20 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 (GRID C-D) 1-#16EF B96 200 400 3-#16 2-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#20EF
+
2-#20
+
2-#20 10MM SPACED 1@50, REST @ 100 (GRID D-E) BEAM SCHEDULE (C21:Fy415) (THIRD FLOOR)
B97 200 400 2-#16 3-#16 2-#16 3-#20 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#10EF
B48 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#16EF
BEAM BEAMSIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
B98 200 400 2-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
SHEAR STIRRUPS SFR
B49 250 500 3-#16 3-#16 3-#16 3-#16 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 1-#16EF NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT B100 250 450 2-#20 2-#20 2-#20 3-#16 3-#20 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#16EF
B50 250 500 3-#16 3-#16 3-#16 3-#20 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 (GRID C-D) 1-#16EF + + + +
+ + + + 2-#20 2-#20 3-#16 2-#16
3-#16 2-#16 2-#16 3-#20 10MM SPACED 1@50, REST @ 80 (GRID D-E) B2 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 -
+
3-#16
B26 200 400 2-#16 3-#16 2-#16 3-#20 3-#20 3-#20 - BEAM SCHEDULE (C21:Fy415) (ROOF BEAM )
B55 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF 10MM SPACED 1@50, 4@80, REST@100
B27 200 400 3-#16 2-#16 3-#16 3-#20 3-#20 3-#20 1-#12EF
BEAM SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT
B56 200 400 2-#16 2-#16 3-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST @ 150
B29 200 400 2-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 - SHEAR STIRRUPS SFR
B57 200 400 3-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST @ 150 2-#20EF NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT
+ + B30 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#12EF
3-#16 2-#16
B31 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B1 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 -
B75 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF
B32 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B2 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B76 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150
B33 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF B3 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 -
B77 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF
B34 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B4 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 -
B78 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150
B35 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B5 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B79 200 400 3-#16 2-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF
B36 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B6 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B80 200 400 2-#16 3-#16 2-#16 3-#20 2-#20 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF
B37 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B7 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B81 200 400 2-#16 3-#16 2-#16 3-#20 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF
B38 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 - B8 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B82 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF
B39 200 400 3-#16 2-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#16EF B9 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B83 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#16EF + +
3-#16 3-#16 B10 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B84 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF 10MM SPACED 1@50, 4@80, REST@100
B40 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 1-#16EF B11 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#16EF
B85 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#12EF 10MM SPACED 1@50, 4@80, REST@150
B41 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 - B12 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B86 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#16EF 10MM SPACED 1@50, 4@80, REST@150
B42 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 1-#16EF B13 200 400 3-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#20EF
B87 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST @ 150 - 10MM SPACED 1@50, 4@80, REST@100
B43 200 400 3-#16 3-#16 2-#16 3-#16 3-#16 3-#16 1-#16EF B14 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#20 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
+
B88 200 400 3-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST @ 150 1-#16EF 2-#16
+ + + + B15 200 400 2-#16 2-#16 3-#16 3-#20 3-#16 3-#20 10MMØ SPACED 1@50, 4@80, REST@150 -
2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150
B44 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 1-#12EF
+
B89 200 400 2-#16 2-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST @ 150 1-#20EF 3-#16 B16 200 400 2-#20 2-#20 2-#20 3-#20 2-#20 3-#20 10MMØ SPACED 1@50, 4@80, REST@150 2-#20EF
+
2-#20
B45 200 400 3-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#12EF
BEAM SCHEDULE (C21:Fy415) (SECOND FLOOR) +
3-#16
+
3-#16
+
3-#16
+
3-#16 B17 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#20EF

SIZE BOTTOM REINFORCEMENT TOP REINFORCEMENT B46 250 450 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#16EF B18 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
BEAM + + + +
SHEAR STIRRUPS SFR 3-#16 3-#16 3-#16 3-#16
+ + + + B19 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
NUMBERS B D LEFT MID SPAN RIGHT LEFT MID SPAN RIGHT 2-#16 2-#16 2-#16 2-#16

B47 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B20 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B52 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 -
B48 200 400 2-#16 2-#16 3-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#16EF B23 200 400 2-#16 3-#16 2-#16 3-#16 2-#16 3-#20 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B53 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 -
B49 200 400 3-#16 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#12EF B24 200 400 2-#16 2-#16 2-#16 3-#20 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 -
B54 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - + +
3-#16 2-#16 B25 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B61 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 -
B50 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 - B26 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#16EF
B62 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF
B51 250 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B27 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B63 200 450 3-#16 2-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#16EF
+ + + + B52 250 450 2-#16 3-#16 3-#16 3-#20 3-#16 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#16EF
2-#16 3-#16 3-#16 3-#16 B28 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 -
B64 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B53 250 500 3-#16 3-#16 3-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@100 -
+ + + B29 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
3-#16 2-#16 3-#20
+
B65 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - 3-#16 B30 200 400 2-#16 3-#16 2-#16 3-#20 3-#20 3-#20 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B66 200 400 2-#16 2-#16 2-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B54 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#16EF B31 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
B67 250 450 3-#16 3-#16 3-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#16EF B55 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 1-#12EF B32 200 400 2-#16 2-#16 2-#16 3-#16 3-#16 3-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
+ + + + +
3-#16 2-#16 3-#16 3-#16 3-#16
+ + + + B56 200 400 2-#16 2-#16 3-#16 3-#20 3-#20 3-#20 10MM SPACED 1@50, 4@80, REST@150 - B33 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#16EF
2-#16 2-#16 2-#16 2-#16
B69 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MM SPACED 1@50, 4@80, REST@150 - B57 200 400 + 3-#16 + 3-#16 2-#16 3-#16 3-#16 3-#16 10MM SPACED 1@50, 4@80, REST@100 1-#12EF B34 200 400 2-#16 2-#16 2-#16 2-#16 2-#16 2-#16 10MMØ SPACED 1@50, 4@80, REST@150 1-#12EF
3-#16 2-#16
CIVIL ENGINEER IMPORTANT NOTES OWNER / CLIENT PROJECT TITLE SHEET CONTENTS REVISIONS PROJECT STATUS PROJECT NO.
AS SHOWN
IN PURSUANCE WITH THE PROVISIONS ON RA 9266, SEC 33, DRAWINGS AND
SPECIFICATIONS AND OTHER CONTRACT DOCUMENTS DULY SIGNED,
PO RESIDENCE FOR BUILDING PERMIT
STAMPED OR SEALED, AS INSTRUMENTS OF SERVICE, ARE THE

DE CHAVEZ DESIGNS
ENGR. JOSEPH B. PONCE INTELLECTUAL PROPERTY AND DOCUMENTS OF THE ARCHITECT, WHETHER
THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. IT SHALL BE
DRAWN BY: HAPEE DATE: SHEET NO.
UNLAWFUL FOR ANY PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID LOCATION
INTERNATIONAL
Unit 18 & 19, Flr 17, Robinsons Victoria Tower C, Timog
REGISTERED CIVIL ENGINEER
DOCUMENTS FOR USE IN THE REPETITION OF AND FOR OTHER PROJECTS MRS. LUZBELLA PO
Corner Panay Avenue, Barangay Paligsahan, Quezon City, OR BUILDINGS, WHETHR EXECUTED IN PART OF IN WHOLE, WITHOUT THE REVISED BY: DATE:
Metro Manila PRC ID# 0161332 PTR: 0782747 OWNER / CLIENT BLK 11, LOT 19, MARINA DRIVE, PENINSULA DE PUNTA FUEGO,
Contact :02-7943-2840
dechdez.international@gmail.com
arkidomdevcorp@gmail.com DATE: 01/15/2021 PLACE: QUEZON CITY
WRITTEN CONSENT OF THE ARCHITECT OR AUTHOR OF THE SAID
DOCUMENTS BARANGAY BALAYTIGUE, NASUGBU, BATANGAS, CALABARZON
CHECKED BY: DATE: S-7

D:\2021-03-16_ParaDraft\2021-04-09_ENGR. JOSEPH\2021-04-10_PO\CAD\2021-05-03_PO-STRUCTURAL-OUT-10.dwg, 5/4/2021 12:04:11 AM

You might also like