You are on page 1of 1

1324397

LUBRICATION CHART Street Force M/MA


Lubricate Daily or Every
Daily Lubrication Points 10 Hours
E G A1 F A3
Ref. No. Description No. of Fittings Comments Models
A1 Arm Horizontal Rollers (2) Two Rollers MA Only
A2 Arm Vertical Rollers (2) Two Rollers MA Only
A3 Arm Horizontal Roller (1) Arm Assembly Retracted To Grease MA Only
B1 Arm Reach Cylinder - Rod End (1) Arm Assembly Extended To Grease MA Only
K
B2 Arm Reach Cylinder - Base End (1) MA Only
®
C Grabber Cylinder - Base End (1) MA Only
C Grabber Cylinder - Rod End (1) MA Only
D Grabber Finger Pivot (2) Two Pins MA Only

Lubricate Weekly or
Weekly Lubrication Points Every 50 Hours
Ref. No. Description No. of Fittings Comments Models
E Arm Rotary Actuator (2) MA Only
F Body Lift Cylinder - Mounting (4) One Cylinder - Two Per Side M/MA
G Packer Assist Cylinder - Base End (1) M/MA
G Packer Assist Cylinder - Rod End (1) M/MA
H Pack and Sweep Cylinders - (2) Two Cylinders M/MA
Rod End
J1 Pack and Sweep Cylinder - (1) M/MA
Base End - Curb Side
J2 Pack and Sweep Cylinder - (1) M/MA
Base End - Street Side
K Tailgate Cylinder - Base End (2) Two Cylinders - One Per Side M/MA
D C B1 A2 J1 N J2 H B2 M L K Tailgate Cylinder - Rod End (2) Two Cylinders - One Per Side M/MA
L Body Pivot Pins (2) Two Pivot Pins - One Per Side M/MA
M Packer Assist Panel (2) Two Bearing Blocks - One Per Side M/MA
A1 A2 A3 B1 N PTO Shaft U-Joints (3) M/MA

Lubricate Every
Scheduled PM Lubrication Points 3 Weeks or 150 Hours
Ref. Description No. of Fittings Comments Models

B2 C D E F G H

J1 J2 K L M N

© 05/2007 McNeilus Truck and Manufacturing, Inc. All Rights Reserved.

You might also like