ACTIVITY DESCRIPTION QUANTITY OF WORK UNIT ESTIMATED TIME ACTUAL TIME

EARTHWORK IN EXCAVATION 31.35 cu.m 8 9


EARTWORK IN FILLING 25.61 cu.m 6 6
LIME CONCRETE IN FOUNDATION 10.74 cu.m 5 7
13
FIRST CLASS BRICK WORK IN FOUNDATION 22.32 cu.m 9 9
DAMP PROOF COURSE 10.52 sq.m 4 3 11

FIRST CLASS BRICK WORK IN SUPERSTRUCTURE 30.1 cu.m 20 20 9


RCC WORK IN SLAB 10.1 cu.m 8 8 7
LIME CONCRETE IN ROOF TERRACING 53.6 sq.m 5 5
5
WOOD WORK IN CHAUKHAT 0.735 cu.m 8 6
WOOD PANALLED DOOR AND SHUTTER 16.27 sq.m 8 8 3
PLASTERING IN WALL 285.6 sq.m 12 12 1
WHITE WASHING 203.64 sq.m 14 15
0
COLOUR WASHING 171.58 sq.m 15 15
PAINTING DOOR AND WINDOW 65.77 sq.m 8 8