Contractor / Turnkey Contractor *: DEBESSA PROPOSED CONSTRUCTION OF NANGA MAKUT / NANGA ENGKUAH ROAD,

DEVELOPMENT SDN BHD Project : KATIBAS

JURUTERA MINSAR CONSULT SDN. BHD.


Consulting Engineer/Engineer/S.O.R *
Contract No. : RECODA/2019/U009

JOINT INSPECTION REPORT Report No :


(Post Concreting Works)

Structure : Date of Concreting :

Component/Element : Date of Inspection : (Post Concreting) - / /

Location : (Corrective Work) - / /

Corrective Work
(if any)
Post Concreting Checks Acceptability Comments
Acceptable
Not Acceptable (5)
(3)

CONCRETE CURING
- Curing membrane in place? Y/N*
- Water curing adequate?

CONCRETE STRENGTH
Is cube strength > minimum requirement for
removal of formwork Y/N*

CONCRETE FINISH
Shrinkage Cracks Y/N*

Structural Cracks Y/N*

Segregation Y/N*

Honeycombing Y/N*

Serious Discoloration / Blemishes due to Y/N*


cement grout leakage/blow holes

ALIGNMENT
Visual check of alignment O. K. / Not O. K. *

ROUGHENING (Construction Joints) O. K. / Not O. K. *

STARTER BAR CLEANLINESS O. K. / Not O. K. *

VOID FORMERS REMOVED Y/N*

REMOVAL OF GROUT HOSES & SPILT Y/N *


GROUT

Remarks on Corrective Work (if any) :

Signature : Signature :
Project Manager/Construction Manager * Engineer / QAE / Asst. QAE *

Name : Name :

Date : / / Date : / /

* Select as appropriate