Corrective Work
(if any)
Post Concreting Checks Acceptability Comments
Acceptable
Not Acceptable (5)
(3)
CONCRETE CURING
- Curing membrane in place? Y/N*
- Water curing adequate?
CONCRETE STRENGTH
Is cube strength > minimum requirement for
removal of formwork Y/N*
CONCRETE FINISH
Shrinkage Cracks Y/N*
Segregation Y/N*
Honeycombing Y/N*
ALIGNMENT
Visual check of alignment O. K. / Not O. K. *
Signature : Signature :
Project Manager/Construction Manager * Engineer / QAE / Asst. QAE *
Name : Name :
Date : / / Date : / /