You are on page 1of 2

MT.

LUCK GROW 899


HQXP.6 / HONDURAS

Dept : Engine
Attn : Mr. James as port engineer
You Young Ship management.
Subject : Request intensive / working bonus

Dear Sir,
In this month, I reported our working by engine department crew such as welding, and overhauling
machinery on board as bellow :
DATE ITEM DISCRIBTION REMAK”S
Jan,19-2017 2F Clean up water side & drew out tube chest cleaned
L.O side of M/E
Clean up air cooler sea water side of M/E
Jan ,20-2017 2F Clean up water side & drew out tube chest cleaned
jacket cooler of M/E
Clean up water side & drew out tube chest cleaned
L.O side of G/E no,1
Jan ,21-2017 Clean up water side & drew out tube chest cleaned
jacket cooler of G/E no,1
Clean up water side & drew out tube chest cleaned
L.O side of G/E no,2
Clean up water side & drew out tube chest cleaned
jacket cooler of G/E no,2
Jan ,22-2017 Inspection bolt & nut connecting piston of M/E
cylinder 1-6
Cleaned dray sump tank / sharf crank case of M/E
Jan ,23-2017 Repairing bolt & nut of M/E fresh water cover
cylinder no.1
Change height pressure valve & low pressure valve
of main air compressor no.1
Jan ,24-2017 Clean up water side & drew out tube chest cleaned
jacket cooler of G/E no,3
Clean up water side & drew out tube chest cleaned
L.O side of G/E no,3
Jan ,25-2017 Clean up water side & drew out tube chest cleaned
L.O side of FWD drive unit
Clean up water side & drew out tube chest cleaned
L.O side of after clutch M/E
Jan ,26-2017 Renewed gland packing of jacket cooling pump
no.1 & no . 2
Renewed gland packing sea water cooling pump of
G/E
Jan ,27-2017 Renewed gland packing sea water cooling pump of
M/E
Renewed gland packing of air condition sea water
cooling pump
Jan ,29-2017 Cleaned diesel oil service tank
Cleaned diesel oil , fuel oil filter of G/E & M/E
Jan ,30-2017 Renewed gland packing of fuel oil booster pump
M/E no.1
Clean up water side & drew out tube chest
cleaned fresh water cooler main air compressor
Jan ,31-2017 Renewed sea water pipe line to G/E no.3 . Material
using : Galvanized pipe Ø 2” length 2000mm, flange
Ø 2” 2pcs
Feb ,02-2017 Renewed retaining pipe antenna radio of top bridge
Material using : galvanized pipe Ø 1” length
1700mmx 2pcs
Feb ,04-2017 Renewed disposal pipe of life boat deck Material
using : Ø 2” length 2300mm
Feb ,06-2017 Renewed , doubling &welding of air fan wall A/C
central, Material using :steel plates
900mmx800mmx3mm
Marc ,08-2017 Repaired ,doubling welding slop tank cover ,
Material using : steel plates Ø 5600mm

As per our working above, I hope management have company policy for intensive money to our
working accordance company Announcement about working bonus.
Tanks you for your attention.

Kaohsiung ,marc 20 2017


Regard, Acknowledge,

( HARIYANTO UMAR ) ( MUHAMMAD HISBARON )


Chief Engineer Master

You might also like