Dear Sir,

We are an Engineering Construction Company primarily engaged in construction of Power


Projects, Refineries, Fertilizer Plants and Pipe Line activities

For one of our upcoming jobs of 1 MWp Solar Photovoltaic Power Plant at Gujarat, we would
require the following:

1)c ½ransformer 415/33 KVA (1.25MVA ½F) - 2 Nos


Data Details :
a)c Service: Distribution
b)c Operation: Parallel
c)c ½ype of Protection Weather Proof
d)c ½ype: Oil Immersed
e)c Rating: 1250 KVA

Also let us know with regards to the other products that you are dealing with for the SPV Power
Plant.

Please note all materials to be in accordance with the latest IES/BIS Standards.

Kindly send us your best rates along with the technical literature / catalogues at the earliest.

Your early action in this matter will be highly appreciated.


c
c
c
c
c
c
c
c
c
c
c
c
Dear Sir,

We are an Engineering Construction Company primarily engaged in construction of Power


Projects, Refineries, Fertilizer Plants and Pipe Line activities

For one of our upcoming jobs of 1 MWp Solar Photovoltaic Power Plant at Gujarat, we would
require the following:

1)c Aaray Junction Box 5 in 1 out - 1 Set


2)c Main Junction Box 5 in 1 out - 1 Set

Please note all materials to be in accordance with the latest IES/BIS Standards.
Kindly send us your best rates along with the technical literature / catalogues at the earliest.
Your early action in this matter will be highly appreciated.
c
Dear Sir,

We are an Engineering Construction Company primarily engaged in construction of Power


Projects, Refineries, Fertilizer Plants and Pipe Line activities

For one of our upcoming jobs of 1 MWp Solar Photovoltaic Power Plant at Gujarat, we would
require the following:

1)c Central Grid connect Inverter

250 KVA - 4 Nos


or
500 KVA - 2 Nos

2c ½he Inverter to operate in a Grid Interactive mode to export power supplied from the
solar arrays directly into the utility grid supply.
2c Software controlled MPP½ (Maximum Power Point ½racking) techniques are required to
be utilized in the control system to optimize the solar energy fed into the grid.
2c ½he inverters should be of indoor installation type with suitable protective measures
incorporated.
2c All materials to be in accordance with the latest IES/BIS Standards.
Kindly send us your best rates along with the technical literature / catalogues at the earliest.

Your early action in this matter will be highly appreciated.


c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
Dear Sir,

We are an Engineering Construction Company primarily engaged in construction of Power


Projects, Refineries, Fertilizer Plants and Pipe Line activities

For one of our upcoming jobs of 1 MWp Solar Photovoltaic Power Plant at Gujarat, we would
require the following:

1)c L½ Panel
2)c H½ Panel with protective equipment

Please note all materials to be in accordance with the latest IES/BIS Standards.
Kindly send us your best rates along with the technical literature / catalogues at the earliest.

Your early action in this matter will be highly appreciated.


c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
c
Dear Sir,

We are an Engineering Construction Company primarily engaged in construction of Power


Projects, Refineries, Fertilizer Plants and Pipe Line activities

For one of our upcoming jobs of 1 MWp Solar Photovoltaic Power Plant at Gujarat, we would
require the following:

1.c SCADA System (Remote Data Monitoring System) - 1 Set


½he Supervisory Control and Data Acquisition Plant Monitoring System should
comprise of:
2c A remote monitoring station - Should be a server based high-end
application software with client server architecture to support multiple
clients.
2c A local monitoring station - Should comprise of a PC based SCADA
software with industry standard features and be a standalone system.
2c Data-logger hardware - Should be either a typical R½ hardware or a PLC
hardware. With minimum requirement of a) 1 MByte of user Memory, b)
2 port of RS-485 serial interface with Modbus R½ , c) 4 analog inputs of
4-20 ma, d) 4 R½D inputs, d) 16 digital inputs, e) 4 digital outputs.

Please note all materials to be in accordance with the latest IES/BIS Standards.
Kindly send us your best rates along with the technical literature / catalogues at the earliest.

Your early action in this matter will be highly appreciated.


c
c
c
c
c
c
c
c
c

You might also like