4-3-1.

Calculation of the floor area of the cargo terminal building and required land area
2007 2012 2017 For my own reference (Dipendra)
A: Annual cargo handling volume (ton) 18,830 21,840 23,230 A: Given data
Layout Scheme is Separate, if Cargo
Layout scheme for cargo facilities Separate Separate Separate handling volume is >=10,000 tons/year
(p-23 of textbook)
b=2.20 Ln A-8.78 for Cargo handling
volume 10,000 to 50,000 tons/year
Cargo b: basic unit (Cargo handling vol per unit) (ton/m2) 12.8751 13.2013 13.3370
(p-23 of textbook and precondition for
Terminal
Cargo Terminal in question sheet p-4)
(Building
C=A/b
Plan) C: Area of airline shed (m2) 1462.5181 1654.3830 1741.7658
(p-23 of textbook)
d=0.5
d: Composition ratio of agent's building 0.5 0.5 0.5
(p-23 of textbook)
E=Cxd
E: Area of agents building (m2) 731.259 827.191 870.883
(p-23 of textbook)
The total floor area of cargo terminal building (m2) 2193.7771 2481.5744 2612.6488 C+E
f1: Depth of airline shed (m) 20 20 20
G: Frontage of land area for cargo terminal (m) 83.1259 92.7191 97.0883 (C/f)+10m
f2: Depth of agent's building (m) 10 10 10
Agent's building to Landside depth
h1: Landside area 1 depth (m) 40 40 40 (p-25 of textbook)
Case 2: Separate
Airline shed to Agent's building depth
h2: Landside area 2 depth (m) # 10 10 10 (p-25 of textbook)
Case 2: Separate
Cargo Gxh
Terminal J: landside area (m2) 4156.2952 4635.9574 4854.4146
(p-23 of textbook)
(Land Plan)
With no GSE lane in front of shed
i: Airside depth (m) 20 20 20 (p-25 of textbook)
Case 2: Separate
Gxi
K: Airside area (m2) 1662.518073 1854.382956 1941.765839
(p-23 of textbook)
Depth of land area for cargo terminal (m)
100 100 100
(f1+f2+h1+h2+i)
Land area for cargo terminal (m2)
L: 8312.590367 9271.914779 9708.829196
(Gx(f1+f2+h1+h2+i))

# Although the standard depth of the landside area 2 is 15 m, it shall be 10m here