10. Set FLAPS 15 1. Verify all switches & lever posi on 1. Close all doors 11. Set TRANSPONDER 2. Connect Ground Power 2. Set BEACON to ON 12. Set BRG1 & BRG2 3. Set BAT to ON 3. ENG2 start 13. Set GUST LOCK to OFF 4. Set EXT PWR to ON a. Set HYD AUX PUMP 14. Set MONITOR 5. Set NAV to ON b. Set PROP BRAKE to OFF 6. Check all HYDPWR to ON c. Check NP% 7. Set PROP BRAKE to ON d. NP% > 10%, Set CONDITION2 to AUTO AFTER TAKE OFF & CRUISING 8. Set SIGNS 4. ENG1 Start 9. Set all WINDSHIELD HTG a. Set Igni on knob to START A 1. A er take off 10. Set ANNLT to BRT b. Set START1 to ON a. Set PWR MGT to CLB/CRZ 11. Set OXYGEN – Main Supply to ON c. Monitor NH% b. GEAR UP d. NH% > 10%, Set CONDITION2 to FTHR c. FLAP UP e. Check NP% d. Set LAND LT to OFF NAVIGATION PREPARATION f. NP% > 10%, Set CONDITION1 to AUTO 2. Cruising g. Set Igni on knob to OFF & START a. > FL100 set SIGNS 1. FCGP ABORT b. At CRZ ALT, set PWR MGT to CRZ a. Set NAV SOURCE to V/ILS1 5. Set TRU to ON b. Set HDG 6. Set all PROBES HTG to ON c. Set COURSE APPROACH & LANDING d. Set ALTITUDE 2. FMS 1. Approach TAXI a. Set POS INIT a. < FL100 set SIGNS b. Set PERF INIT 1. Open MAP b. Set ILS FREQ c. Set WEIGHT 2. Set TAXI & external lights to ON c. Set HDG d. Set FPLN INIT 3. Remove WHEEL CHOCKS d. Set DH/MDA 4. Set PARK BRAKE to OFF 2. Landing a. Set NAV SOURCE to V/ILS1 HOTEL MODE b. Set COURSE BEFORE TAKE OFF c. FLAPS MAX 1. Set ENG1 & ENG2 PUMP to ON d. GEAR DOWN 2. Set Igni on knob to START A 1. Set EFIS to MFD PERF e. Set PWR MGT to TO 3. Set START2 to ON 2. CONFIRM T/O DATA f. Set LAND LT to ON 4. Monitor NH% 3. Check V1 5. NH% > 10%, Set CONDITION2 to FTHR 4. Set Al meter 6. Set Igni on knob to OFF & START ABORT 5. Set ELEVATOR TRIM 7. Set EXT PWT to OFF 6. Set TAXI LT to OFF 8. Remove Ground Power 7. Set LAND LT to ON 8. Set NAV SOURCE to FM1
Transport Infrastructure and Systems - Proceedings of The AIIT International Congress On Transport Infrastructure and Systems (TIS 2017), Rome, Italy, 10-12 April 2017 (PDFDrive)