CAP ANALYSIS

(MUNICIPALITY OF CALINOG)

COMPONENT CURRENT/EXISTING STATUS ISSUES & CONSTRAINT

Poor condition of Farm to Market Roads in Calinog


1. Guiso-Canabajan-Malag-it
2. Lampaya (Sitio Banay-Banay)
3. Cabagiao – Malapawe-San Nicolas
4. San Nicolas, Ulayan
Difficulty in the transport of
5. Libot-Impalidan-Owak
6. Brgy. Cabugao – Impalidan the major commodities
7. Baje San Julian – Balaticon-Nalbugan- Malitbog
Centro
8. Maspasan
9. Datagan-Agcalaga-Garangan-Masaroy

Absence of Pathways in Upland Areas of Calinog


1. Caratagan-Hilwan Pathway
2. Caratagan-Aglonok Pathway
3.Caratagan - Marandig Pathway
4. Caratagan-Marandig Pathway Difficulty in transports of
5.Supanga - Sitio Agbatuan Pathway
6. Supanga - Proper Pathway
major commodities in upland
7. Supanga - Manaripay Pathway areas,
8. Binolusan Peq. - Agtaraw Pathway
9. Cahigon Pathway (Magarang - Alibunggan - Tabliya -
Marari)
10. Binolusan Peq - Magarang - Cahigon Pathway

Absence of Hanging Bridges in Calinog


1. Aglonok
Physical Characteristics 2. Hilwan
and Infrastructure 3. Marandig
Difficulty in the transport of
4. Supanga-Sitio Agbatuan
5. Supanga-Proper the major commodities
(ex. FMR, irrigation, post-
harvest facility , etc.) 6. Badu
7. Malaguinabot-Guiso
8. Gama Grande-Bo. Calinog

Unfinished Unfinished DAR ADB ARCP-Bridge at Brgy. Difficulty in the transport of


Toyungan the major commodities
Absence of Irrigation Facilities
1.Lowland Barangays (Alibunan – Cabugao, Barrio
Calinog-Canbajan, Dalid – Jamin-ay, Toyungan- Difficulty in the transport of
Carvasana) the major commodities
2. Upland Barangay (Supanga,Caratagan,Marandig,
Manaripay, Guinbonyugan, Cahigon)

Lack of Pre and Post Harvest Facilities and Machineries


in Various Barangay of Calinog
Low Productivity

Slaughterhouse Lack of Equipment


1. Non-Operational Design not met the standard
2. Unfinished Building of NMIS

Lack of Processing Center/Facility


1. Banana Processing Facility
Limited source of Income,
2. Vegetable Processing Facility
low production income
3. Coffee Processing Facility
4. Farm Level Grain Center

1. Illegal Cutting of Trees


2. Presence of Kaingin
Unprotected Ecotourism Areas Activities
(Caratagan, Hilwan, Aglonok, Cahigon, 3. Poor condition of access
Guinbonyugan, Binolusan, Marandig, Supanga, roads
Manaripay, Tigbayog) 4. Absence of Trails,
Pathways leading to eco-
tourism areas

1. Flooding in Lowland
Absence of Flood Control Dike Barangays
(Alibunan & Jalaur River) 2. Low Productivity

1. No Proper Waste Disposal


Absence of Sanitary Landfill
2. High Residual Waste

Environment protection &


ecosystem management
1. Scouring/Soil Erosion
along River banks
Presence of Quarry Operation 2. Unregulated quarrying of
sand and gravel and other
Environment protection & aggregates.
ecosystem management
Activities
(ex. ecotourism, soil and water
conservation measures, NGP,
agri-tourism, fish sanctuaries,
declared PAs, tenurial
instruments, etc.)

1. Presence of Informal
Tenurial instruments
Settlers

1. Soil Erosion in Riverbanks


National Greening Program
and Upland Areas

1. Flooding in Poblacions
Absence of Compresensive Drainage System w/
during rainy days
Waste Water Treatment Facility
2. Improper waste disposal

Survey Issues
(Inclusion of FBs not in
Collective CLOA
CLOA but have actual area
of tillage)
Rice - existing VCA
Low productivity 

Investment requirements Non Compliance to


based on value-chain and Existing Slaughter House standards
market study No Equipment
-market information system,
processing and value adding
facilities/ technologies
Non Operation of Bagsakan
Center
Lack of Manpower in
Operation of Bagsakan
Existing Bagsakan Center (Trading Post)
Center
No Equipment for the
operation of Bagsakan
Center

Absence of Coffee, Banana & Vegetable Processing


Low Income for Farmers/Fas
Facilities

No water distribution
Potable Water
pipeline in distant barangays

Socio-economic
Ex. all basic socio-economic
services
Absence of electric Power
Electricity supply in Mountain
Barangays

Lack of organized farmers


association to manage the
Institutional Development
rice processing facilities
Rural based organizations
Product processing facilities Inability of existing FAs to
-LGU
manage and market the rice
-Local alliances
processing facilities
Lack of capital for Fas
ALYSIS
Y OF CALINOG)

AGENCY RESPONSIBLE
PROPOSED INPUTS/
ACTIVITIES/ INTERVENTIONS

OTHERS
DENR

DILG

LGUs
DAR
DA

X
Rehabilitation/Concreting of FMR X X X
DSWD

Construction/Rehab/Concreting of X
X X
Pathways DOT

Construction of Hanging Bridges X X X

Completion/ Construction of Bridge


X X DPWH
Construction of Irrigation Facilities X X NIA

Purchase/Acquisition of Fas,
X X
Agricultural Machineries BLGU

Purchase of Equipment
Rehabilitation/ Improvement/ X X NMIS
Redesigning the Slaughterhouse

Establishment of Processing
X X DTI
Center/Facility

1. Institutionalization of MENRO
Office
2. Reforestation Program/Projects
3. Rehabilitation/ Improvement of
Access Roads
X X X DOT
4. Establishment of trails, Pathways
5. Formulation of Municipal
Tourism Plan
6. Development of Eco-Tourism
Areas

DPWH
Construction of Flood Control Dike X X X
OCD

1. Establishment of Sanitary
Landfill
2. Establishment of Barangay
BLGU
MRFs X X X
CSOs
3. Strict Implemenation of RA 9003
(Ecological Solid Waste
Management Act)
1. Institutionalization of MENRO
2. Regular Monitoring of Quarry
PENR
Areas X X
O-LGU
3. Tree Planting Activity along
River Banks

1. Formulation of Local Shelter


Plan
2. Relocation of Informal Settlers
X NHA
3. Establishment and Construction
of Resittlement Areas/Socialized
Housing Projects

1. Institutionaliztion of MENRO
Office PENR
2. Capacity Development/Training O-
X X X
of Bantay Gubat LGU,
3. Strict Monitoring and NIA
Implementation of Environmental
Laws
4. Establishment of Barangay
Nurseries
5. Tree Planting Activities

1. Establishment and Costruction of


Comprehensive Drainage System
X DPWH
with Waste Water Treatment
Facility

Filling of Petition for qualified FBs


X
in regional Office
Provision of tractors, harvesters and
X X Fas
planters

Rehabilitation/Re-designing of
X
Slaughterhouse X
NMIS
Purchase of Equipment

1. Operation of Bagsakan
2. Provision of Manpower to
operate and Manage the Bagsakan
X X Fas
Center
3. Purchase of Equipment for
Bagsakan

1. Establishment Processing
X X FAs
Facilities

LWUA
Installation of water distribution
X X ,
pipeline
NWRB

DOE,
Expansion/Construction of Power ILECO
lines X , NIA-
Establishment of Solar Power JRMP
II

Organization of farmers
association to manage the
processing facilities X
X FAs
Capacitate the FAs to manage and ACPC
market the processing facilities
Facilitate the availment of PLEA
CADP FRAMEWORK
(MUNICIPALITY OF CALINOG)

Budgetary Requirements/ Year of implementation/


Agency
Proposed Complementation
Proposed Inputs/ Activities/ Interventions KPI Remarks
and Integration of Services

DENR

Others
LGUs
DILG
DAR
DA

DOT (25 Million), DSWD (50 Million), Province (150 Million)


Rehabilitation/Concreting of FMR
DA: FMR going to Major
1. Guiso-Canabajan-Malag-it (5km)
Agricultural Areas
2. Lampaya (Sitio Banay-Banay) (1.5km)
3. Cabagiao – Malapawe-San Nicolas(2km)
DILG: Proposed FMR

150 Million (2020-2025)

25 Million (2020-2025)
50 Million (2020-2025)
4. San Nicolas, Ulayan(2km)
(Assistance to
5. Libot-Impalidan-Owak(4km)
Municipalities)
6. Brgy. Cabugao – Impalidan(1km)
Length of Farm to
7. Baje San Julian – Balaticon-Nalbugan-
LGUs: Funded by 20% Market road
Malitbog Centro (5km) 450m
Development Fund improved/concreted
8. Maspasan(1km)
(Output Indicator)
9. Datagan-Agcalaga-Garangan-
DOT: Proposed Farm to
Masaroy(7km)
Tourism Area
10. Tibiao(1.5 km)
11. Badlan – Datagan(1km)
DSWD: KALAHI CIDSS
12. Carvasana-Toyungan(8km)
13. Dalid-Jamin-ay(5km)
Province: Provincial Road
14.Malaguinabot-Tahing(1km)
Establishment of Pathways in Upland
Areas of Calinog
1. Caratagan-Hilwan Pathway

50 Million (2020-2025)
2. Caratagan-Aglonok Pathway
DENR-FMP Projects in

DOT (10,000.00)
3.Caratagan - Marandig Pathway
Upland Areas

100,000.00
4. Caratagan-Marandig Pathway
Nos. Pathways
5.Supanga - Sitio Agbatuan Pathway
LGU: Project Proposal & Improved & 50 Milliom
6. Supanga - Proper Pathway
Survey Rehabilitated
7. Supanga - Manaripay Pathway
8. Binolusan Peq. - Agtaraw Pathway
DOT: Farm to Tourism Road
9. Cahigon Pathway (Magarang -
Alibunggan - Tabliya - Marari)
10. Binolusan Peq - Magarang - Cahigon
Pathway

OCD (7.5 Million) (2020-2025)


15 Million (2020-2025)
Absence of Hanging Bridges in Calinog DENR-FMP Projects in

3 Million (2020-2025)

6 Million (2020-2025)
1. Aglonok Upland Areas
2. Hilwan
3. Marandig DILG: AM Projects
No of Hanging
4. Supanga-Sitio Agbatuan 31.5 Million
Bridges Constructed
5. Supanga-Proper LGU: 5% LDRRM Fund
6. Badu
7. Malaguinabot-Guiso OCD Projects implemented
8. Gama Grande-Bo. Calinog by DPWH
12.8 Million (2019-2021)
DAR: Technical Assistance
& Recommendation

LGU: 20% Development Completeness of the


Completion of Toyungan Hanging Bridge X X
Fund Bridge

DPWH: Preparation of POW


& DED

NIA (200 Million) (2019-2025)


20 Million (2020-2025)
NIA: Jalaur River Multi- No. of Irrigation
Purpose Project II Facilities
Construction of Irrigation Facilities
DENR - FMP ASF Proposed Constructed and
Project Completed

10 Million (2020-2025)

1 Million (2020-2025)
DA: Pre and Post Harvest
Facilities Number of Post
Procurement of Pre/Post Harvest harvest facilities
Facilities LGU: Counterpart in the delivered
Procurement of Pre and Post
Harvest Facilities
2 Million (2019)
LGU: equipment
Completeness of

X NMIS
DA & NMIS for Capacity
Purchase of Equipment Equipment for the
Building on the operation and
For the Operation of Slaughterhouse Operation of
maintenance of the
Slaughterhouse
slaughterhouse

10 Million (2020-2022)
LGU: 20% Development
Standard

X NMIS
Rehabilitation/Improvement of Fund
compliance to
Slaughterhouse (with approved design NMIS: Technical Assistant in
NMIS
standard of NMIS) Redesigning of
Slaughterhouse

2.5 Million includes

2.5 Million (2021)


the first year
LGU: creation of office and
operation of the
personnel Presence of Office/
MENRO that
Institutionalization of MENRO Office DENR: for capacity X CSC personnel of
inludes Salaries,
development/training of the MENRO
Supplies and
new personnel
Operational
Expenses

30 Million (2020-2025)
LGU: Technical Assistance
DENR: Funding Number of Persons
Livelihood Program
(Upland Barangay)
DA: Training/Capacity X X availed the
Building of the target livelihood Program
Participants
LGU: 20% Development
Fund

10 Million (2020-2025)

Fas, Private Individuals


3 Million (2020-2025)
DA: Infrastructure Project
Assistance & Training of Fas
Lack of Processing Center/Facility
1. Banana Processing Facility Number of
DILG: AM Projects
2. Vegetable Processing Facility X Processing Facility
3. Coffee Processing Facility established
Fas: for the Operation and
4. Farm Level Grain Center
Management of Processing
Facility

Private Individuals: Donation


of Lot for the facility
LGU: Tree Planting Activity,
Strengthening of Bantay
Kalikasan (Capacity
Building/Training) Conduct
of regular Checkpoint
together w/ DENR and PNP.
Increased in number
Reforestation Program/Projects X X of Forest Areas
DENR: Establishment of
Nurseries, Capacity
Building/Training,

Pos: Establishment of
Nurseries & Management

200,000 (2019-2021)
LGU: Data Gathering and
Crafting of Municiapal Approved

DOT
Formulation of Tourism Development
Tourism Development Plan Municipal Tourism
Plan
DOT: Technical Assistance Development Plan
in preparation of the plan
DOT (10 Million 2020-2025)
85 Million (2020-2025)
LGU: Project Proposals and

2 Million (2020-2025)
Survey
Development of Eco-tourism areas
DENR: Pathways, Hanging Number of Eco-
(Caratagan, Hilwan, Aglonok, Cahigon,
Bridge & Irrigation Facility Tourism Areas

X
Guinbonyugan, Binolusan, Marandig,
Develop
Supanga, Manaripay, Tigbayog)
DOT: Eco-Tourism Project

DA: Agri-Tourism Projects

50 thou (2019-2021)
LGU: Project proposal and

DPWH & OCD


Survey

DPWH: Implements the Number of Flood


Construction of Flood Control Dike
Flood Control Project Control constructed

OCD: Funding Source of the


Project

20 Million (2019-2021)
LGU: 20% Development

BLGU & DENR


Fund
DENR: Technical Assistance
Operation of
Establishment of Sanitary Landfill in Development, X Sanitary Landfill
implementation and
management of Sanitary
Landfill
2.5 Million(2019-2025)

BLGU & DENR


BLGU: Management of MRF
LGU: 20% Development Number of MRFs
Establishment of Barangay MRFs
Fund
X established
DENR: Technical Assistance

Quarry Permities and PENRO LGU


LGU: Monitoring and
Monthly Reporting
PENRO-LGU: Approval and
Disapproval of Quarry
Monitoring and Inspection of Quarry Permities Compliance of
X X
Areas DENR: Issuance of other Quarry Permities
requirements for Quarry
Permities
Quarry Permities: Monthly
Reporting to PENRO LGU

10 Million (2020-2025)
Completion and
LGU: 20% Development
Operation of
Establishment and Costruction of Fund

DPWH
Comprehensive
Comprehensive Drainage System with DENR:Technical Assistance X Drainage System
Waste Water Treatment Facility DPWH: Drainage Projects &
with Waste Water
Technical Assistance
Treatment Facility
CLOA Benefeciaries:
Application for Pe;tition number of
Filling of Petition for qualified FBs in

FBs
regional Office
DAR: X Individual CLOAs
Fastracking,Monitoring and issued
Survey of qualified FBs

2 Million (2022)
DA: Capacity Development
to Fas percentage of the

Fas
Operation of Bagsakan Center LGU: 20% Development for X Operation of
the Equipment and operation Bagsakan Center
of Bagsakan Center

15 Million (2020-2025)

2 Million (2020-2025)

2 Million(2021-2025)
LGU: Labor Counterpart
DENR: Water Distribution Number of Potable

LWUA
Installation of water distribution pipeline Pipelines in Mountain Water Project
Barangays
DILG: Water supply

LGU: Electrical Equipment

DOE, ILECO
1.5 Million
& Material
Number of
Expansion/Construction of Power lines ILECO: Installation &
Barangays with
Establishment of Solar Power Technical Assistance
access to electricity
DOE: Funding for Solar
Power
3 Million (2019-202)
Organization of farmers association to
manage the processing facilities
No. of Trainings
Capacitate the FAs to manage and DA:Training and Orientation
conducted
market the processing facilities
Facilitate the availment of PLEA